Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for South Vinemont, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 236ft / 72.4mTotal length
  • $21,656,000Total costs
  • 148,176Total average daily traffic
  • 43,385Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for South Vinemont
  • No street view available for this location

New bridges in South Vinemont, AL - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 121960-1969
  • 11980-1989
  • 21990-1999
  • 12010-2019
Average Bridge Daily Traffic in South Vinemont, AL
Average Bridge Truck Traffic in South Vinemont, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Very good
  • 44.4%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.4%Very good
  • 33.3%Good
  • 22.2%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 71.4%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 4005,  Location: 0.2 MI S SR 3 & I 65 (Lat: 34.312300,  Lng: -86.899400),  Route carried "on" structure: US 31,  Year Built: 1951,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,970 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,100 (year 2033),  Design Load: H 15,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: SR 3
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 542.087,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $548,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $603,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8166,  Location: CR 1223 OVP MP313.1 (Lat: 34.249642,  Lng: -86.888825),  Route carried "on" structure: County highway 23,  Year Built: 1964,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,100 (year 2040),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,806,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,987,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8168,  Location: 8 MI N JCT SR 157 * I65 (Lat: 34.308539,  Lng: -86.905064),  Route carried "on" structure: Interstate 65,  Year Built: 1964,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 16,908 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 21,671 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN CREEK * SER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 511.012,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,820,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $2,002,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8169,  Location: 8 MI N JCT SR 157 * I-65 (Lat: 34.308389,  Lng: -86.905194),  Route carried "on" structure: Interstate 65,  Year Built: 1964,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 16,908 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 21,671 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN CREEK * SER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 511.012,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,820,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $2,002,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 819,  Location: JCT I 65 & SR 3 (Lat: 34.317072,  Lng: -86.900625),  Route carried "on" structure: Interstate 65,  Year Built: 1964,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 15,465 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 19,593 (year 2033),  Design Load: HS 20,  Features Intersected: SR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 512.187,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.81m (35.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,446,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,691,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8191,  Location: JCT I 65 & SR 3 (Lat: 34.316944,  Lng: -86.900383),  Route carried "on" structure: Interstate 65,  Year Built: 1964,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 15,465 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 19,593 (year 2033),  Design Load: HS 20,  Features Intersected: SR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 512.187,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.81m (35.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,447,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,692,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12829,  Location: 0.5 MI E SR 31 (Lat: 34.309833,  Lng: -86.896478),  Route carried "on" structure: County highway 137,  Year Built: 1982,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 800 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,600 (year 2041),  Design Load: H 20,  Features Intersected: FLINT CREEK RELIEF,  Facility Carried by Structure: WILHITE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $890,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $979,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15169,  Location: CR 1354 vinemont school (Lat: 34.244200,  Lng: -86.861494),  Route carried "on" structure: County highway 23,  Year Built: 1990,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 1,375 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,400 (year 2033),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: CO. RT. 1354
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $976,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,074,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1667,  Location: CR 1398 (Lat: 34.264964,  Lng: -86.872722),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 14.94m (49.02ft),  Average Daily Traffic: 720 (year 1994),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,200 (year 2028),  Design Load: HS 20,  Features Intersected: CSX RAILROAD * FLINT CRK,  Facility Carried by Structure: CO. RT. 1398 RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.72m (51.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,526,000,  Roadway Improvement Cost: $453,000,  Total Project Cost: $4,979,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18679,  Location: CR 1375 (Lat: 34.291250,  Lng: -86.857761),  Route carried "on" structure: County highway 1375,  Year Built: 1963,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 75 (year 2001),  Average Future Daily Traffic: 90 (year 2036),  Features Intersected: FLINT CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.008,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $759,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20546,  Location: 0.6 MI E SR31 (Lat: 34.309939,  Lng: -86.893375),  Route carried "on" structure: County highway 1137,  Year Built: 2014,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 760 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,297 (year 2040),  Design Load: HS 20,  Features Intersected: FLINT CREEK,  Facility Carried by Structure: WILHITE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,716,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,888,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8166,  Location: CR 1223 OVP MP313.1 (Lat: 34.249642,  Lng: -86.888825),  Route carried "under" structure: Interstate 65,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 33,815 (year 2020),  Truck Traffic: 32%,  Features Intersected: I-65,  Facility Carried by Structure: CO RD 1223
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 503.897,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 8167,  Location: CR 1282 OVP MP 316.164 (Lat: 34.289125,  Lng: -86.909775),  Route carried "under" structure: Interstate 65,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 33,815 (year 2020),  Truck Traffic: 32%,  Features Intersected: I-65,  Facility Carried by Structure: CO RD 1282
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 508.817,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 8168,  Location: 8 MI N JCT SR 157 * I65 (Lat: 34.308539,  Lng: -86.905064),  Route carried "under" structure: ServiceOther road ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2020),  Features Intersected: INDIAN CREEK * SER ROAD,  Facility Carried by Structure: I-65
Minimum Vertical Clearance: 10.52m (34.51ft),  Kilometerpoint: 268.099,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 8169,  Location: 8 MI N JCT SR 157 * I-65 (Lat: 34.308389,  Lng: -86.905194),  Route carried "under" structure: ServiceOther road ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2020),  Features Intersected: INDIAN CREEK * SER ROAD,  Facility Carried by Structure: I-65
Minimum Vertical Clearance: 10.52m (34.51ft),  Kilometerpoint: 268.199,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 819,  Location: JCT I 65 & SR 3 (Lat: 34.317072,  Lng: -86.900625),  Route carried "under" structure: US 31,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 3,290 (year 2020),  Truck Traffic: 10%,  Features Intersected: SR 3,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 339.020,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 8191,  Location: JCT I 65 & SR 3 (Lat: 34.316944,  Lng: -86.900383),  Route carried "under" structure: US 31,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 3,290 (year 2020),  Truck Traffic: 10%,  Features Intersected: SR 3,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 339.020,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 27.1m (88.9ft)

Discuss South Vinemont, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.