Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Southport, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 236ft / 71.9mTotal length
  • $43,444,000Total costs
  • 21,642Total average daily traffic
  • 1,232Total average daily truck traffic
  • 26,326Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Southport
  • No street view available for this location

New bridges in Southport, NY - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 41960-1969
  • 31970-1979
  • 11980-1989
  • 31990-1999
  • 42000-2009
  • 52010-2019
  • 12020-2022
Reconstructed bridges in Southport, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Southport, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Excellent
  • 4.5%Very good
  • 45.5%Good
  • 22.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 31.8%Excellent
  • 4.5%Very good
  • 31.8%Good
  • 22.7%Satisfactory
  • 4.5%Fair
  • 4.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Excellent
  • 4.5%Very good
  • 40.9%Good
  • 9.1%Satisfactory
  • 27.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.0%Excellent
  • 12.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
  • 4.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Excellent
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 101071,  Location: .3 MI S JCT SR 328 & SR14 (Lat: 42.050367,  Lng: -76.821514),  Route carried "on" structure: State highway 14,  Year Built: 2002,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 3,024 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,673 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SOUTH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.742,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.51m (18.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,939,000,  Roadway Improvement Cost: $1,135,000,  Total Project Cost: $3,074,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101072,  Location: .1 MI S JCT SR 328 & SR14 (Lat: 42.052942,  Lng: -76.820739),  Route carried "on" structure: State highway 14,  Year Built: 2002,  Status: Open,  Structure Length: 9.54m (31.30ft),  Average Daily Traffic: 3,024 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,673 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SEELEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.047,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 24 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.8m (97.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.54m (31.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,571,000,  Roadway Improvement Cost: $2,677,000,  Total Project Cost: $7,247,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1045951,  Location: 3.1 MI NE JCT RTE 328 +CL (Lat: 42.034258,  Lng: -76.868142),  Route carried "on" structure: State highway 328,  Year Built: 1961,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 2,415 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,426 (year 2040),  Features Intersected: DRY RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $494,000,  Total Project Cost: $1,338,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1045952,  Location: 3.1 MI NE JCT RTE 328 +CL (Lat: 42.033842,  Lng: -76.867833),  Route carried "on" structure: State highway 328,  Year Built: 1961,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 2,415 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,426 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: DRY RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $847,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $1,344,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104967,  Location: 0.1 MI SW ON ELMIRA+CATON (Lat: 42.082067,  Lng: -76.867008),  Route carried "on" structure: State highway 225,  Year Built: 1975,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 18.44m (60.50ft),  Average Daily Traffic: 1,001 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,216 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CHEMUNG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 50.2m (164.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.44m (60.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $6,452,000,  Roadway Improvement Cost: $3,778,000,  Total Project Cost: $10,231,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225502,  Location: 2.5 MI S JCT RTS 14 + 328 (Lat: 42.023569,  Lng: -76.840747),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 7 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 10 (year 2036),  Features Intersected: CHRISTIAN HOLLOW,  Facility Carried by Structure: MILLER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $398,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226909,  Location: 1.0 MI S OF NYS ROUTE 328 (Lat: 42.026614,  Lng: -76.877614),  Route carried "on" structure: ServiceOther road ,  Year Built: 2017,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 345 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 483 (year 2038),  Design Load: HL 93,  Features Intersected: BIRD CREEK,  Facility Carried by Structure: PINE HILL DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $522,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $828,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 227133,  Location: Elston Hollow Road (Lat: 42.088528,  Lng: -76.718817),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 135 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 189 (year 2040),  Design Load: HL 93,  Features Intersected: Trib. Baldwin Creek,  Facility Carried by Structure: Elston Hollow Road
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Fair,  Culverts: Excellent,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $176,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33308,  Location: 2.8 MI E OF ELMIRA (Lat: 42.083269,  Lng: -76.753814),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 1,024 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,434 (year 2036),  Design Load: HL 93,  Features Intersected: GOLDSMITH CREEK,  Facility Carried by Structure: CR 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.703,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $530,000,  Roadway Improvement Cost: $310,000,  Total Project Cost: $840,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333081,  Location: 5 MILES EAST OF ELMIRA (Lat: 42.082672,  Lng: -76.716853),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 1988,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,235 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,729 (year 2040),  Features Intersected: ELSTON HOLLOW CRK,  Facility Carried by Structure: CR01 BREESPORT RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.854,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $377,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333087,  Location: 3.0 MI N OF LOWMAN (Lat: 42.065072,  Lng: -76.733883),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 410 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 574 (year 2038),  Design Load: HS 20,  Features Intersected: BALDWIN CREEK,  Facility Carried by Structure: CR02 LOWMAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.602,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $857,000,  Roadway Improvement Cost: $502,000,  Total Project Cost: $1,359,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333119,  Location: 3.5 MI S OF ELMIRA (Lat: 42.042981,  Lng: -76.822289),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 668 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 935 (year 2038),  Design Load: HS 20,  Features Intersected: SOUTH CREEK,  Facility Carried by Structure: CR26 CHRISTIAN HO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.599,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,027,000,  Roadway Improvement Cost: $601,000,  Total Project Cost: $1,628,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33312,  Location: 1.0 MI E OF SEELEY CREEK (Lat: 42.009206,  Lng: -76.874347),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 323 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 452 (year 2038),  Design Load: HS 20,  Features Intersected: BIRD CREEK,  Facility Carried by Structure: CR27 BIRD CREEK R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $427,000,  Total Project Cost: $1,157,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333121,  Location: 1.0 MI W OF PINE CITY (Lat: 42.039236,  Lng: -76.883731),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 493 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 690 (year 2038),  Features Intersected: DRY RUN,  Facility Carried by Structure: CR29 DRY RUN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.335,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 16.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333147,  Location: 0.8 MI SW OF PINE CITY (Lat: 42.030381,  Lng: -76.880158),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 1,208 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,494 (year 2040),  Design Load: HL 93,  Features Intersected: BIRD CREEK,  Facility Carried by Structure: CR69 PENNSYLVANIA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $893,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333148,  Location: .5 MILE SW OF PINE CITY (Lat: 42.033217,  Lng: -76.877269),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 2005,  Status: Posted for load,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 1,208 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,494 (year 2040),  Design Load: H 20,  Features Intersected: SEELEY CREEK,  Facility Carried by Structure: CR69 PENNSYLVANIA
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 63.7m (209.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $3,528,000,  Roadway Improvement Cost: $2,066,000,  Total Project Cost: $5,594,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 333154,  Location: 3.5 MI W OF ELMIRA (Lat: 42.082967,  Lng: -76.869894),  Route carried "on" structure: Other road ,  Year Built: 1934,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 267 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 374 (year 2040),  Design Load: HS 20,  Features Intersected: HENDY CREEK,  Facility Carried by Structure: GOLDEN GLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $397,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33316,  Location: 3.7 MI WEST OF ELMIRA (Lat: 42.083242,  Lng: -76.874697),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 306 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 428 (year 2040),  Design Load: HL 93,  Features Intersected: HENDY CREEK,  Facility Carried by Structure: BROOKLINE AVENUE
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $628,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333174,  Location: 4.3 MI SE OF ELMIRA (Lat: 42.058700,  Lng: -76.735689),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 34 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 48 (year 2036),  Features Intersected: BALDWIN CREEK,  Facility Carried by Structure: JENKINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.850,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $337,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $535,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333175,  Location: 3.9 MI SE OF ELMIRA (Lat: 42.066725,  Lng: -76.739319),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 34 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 48 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: GOLDSMITH CREEK,  Facility Carried by Structure: JENKINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Poor,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $866,000,  Roadway Improvement Cost: $507,000,  Total Project Cost: $1,373,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333176,  Location: 4.0 MI SE OF ELMIRA (Lat: 42.071978,  Lng: -76.732544),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 56 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BALDWIN CREEK,  Facility Carried by Structure: GREATSINGER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $665,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $1,055,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333192,  Location: 4.7 MI W OF ELMIRA (Lat: 42.077972,  Lng: -76.892992),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 60 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 84 (year 2038),  Design Load: HL 93,  Features Intersected: HENDY CREEK,  Facility Carried by Structure: LEACH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $537,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335778,  Location: 5.0 MI W OF ELMIRA (Lat: 42.076031,  Lng: -76.902403),  Route carried "on" structure: County highway 225,  Year Built: 1965,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 629 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 656 (year 2040),  Design Load: HS 20,  Features Intersected: HENDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.524,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $463,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $734,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33684,  Location: 0.9 MILES NW OF PINE CITY (Lat: 42.040603,  Lng: -76.888247),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 493 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 690 (year 2038),  Features Intersected: DRY RUN,  Facility Carried by Structure: CR29 DRY RUN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $251,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33694,  Location: IN PINE CITY (Lat: 42.036664,  Lng: -76.869864),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 844 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,044 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DRY RUN CREEK,  Facility Carried by Structure: CR69 PENNSYLVANIA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.636,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $1,000,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Southport, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.