Bridge Statistics for Springville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 338ft / 103mTotal length
  • $30,420,000Total costs
  • 199,177Total average daily traffic
  • 45,049Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Springville
  • No street view available for this location

New bridges in Springville, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 21940-1949
  • 11950-1959
  • 121960-1969
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Springville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Springville, AL
Average Bridge Truck Traffic in Springville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 15.4%Good
  • 46.2%Satisfactory
  • 7.7%Fair
  • 15.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 23.1%Good
  • 38.5%Satisfactory
  • 23.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Very good
  • 23.1%Good
  • 53.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 23.1%Good
  • 53.8%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 225,  Location: .3 MI. SO. I-59 (Lat: 33.781000,  Lng: -86.430900),  Route carried "on" structure: US 23,  Year Built: 1924,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 6,701 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,101 (year 2041),  Design Load: H 15,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,234,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,357,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226,  Location: 0 . 3 MI NORTH I 59 (Lat: 33.775000,  Lng: -86.425000),  Route carried "on" structure: US 23,  Year Built: 1924,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 3,370 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,088 (year 2041),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.159,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.58m (8.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $350,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3077,  Location: 0.1 NW FAIRVIEW CHURCH (Lat: 33.780061,  Lng: -86.362444),  Route carried "on" structure: ServiceCounty highway 35,  Year Built: 1947,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 250 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 411 (year 2029),  Design Load: HS 20,  Features Intersected: CANOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.91m (9.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $528,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 3365,  Location: 4.2 MI.EA. I-59 (Lat: 33.733111,  Lng: -86.410222),  Route carried "on" structure: State highway 174,  Year Built: 1948,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 3,800 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,979 (year 2041),  Design Load: H 15,  Features Intersected: LITTLE CANOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.807,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $970,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,067,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4843,  Location: 1 2 MI NW SPRINGVILLE (Lat: 33.799417,  Lng: -86.488350),  Route carried "on" structure: ServiceCounty highway 17,  Year Built: 1954,  Status: Posted for load,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 1,970 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,928 (year 2037),  Design Load: H 15,  Features Intersected: BIG CANOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,431,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $1,574,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7226,  Location: I59 * MOUNTAIN VIEW RD (Lat: 33.745697,  Lng: -86.485889),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 895 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,315 (year 2041),  Design Load: HS 20,  Features Intersected: I - 59,  Facility Carried by Structure: MOUNTAIN VIEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.70m (31.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,796,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,976,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7227,  Location: 2.1 MI SO JCT AL 174 (Lat: 33.756056,  Lng: -86.479139),  Route carried "on" structure: Interstate 59,  Year Built: 1961,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 13,255 (year 2021),  Truck Traffic: 26%,  Average Future Daily Traffic: 16,399 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 245.935,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,391,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,630,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 723,  Location: .2 MI SO JCT AL 23 (Lat: 33.776389,  Lng: -86.429722),  Route carried "on" structure: Interstate 59,  Year Built: 1961,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 26,310 (year 2021),  Truck Traffic: 27%,  Average Future Daily Traffic: 32,551 (year 2041),  Design Load: HS 20,  Features Intersected: LEFT HAND PRONG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 251.100,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.2m (122.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,310,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $2,541,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7231,  Location: I59 * CANOE CREEK (Lat: 33.800800,  Lng: -86.372400),  Route carried "on" structure: Interstate 59,  Year Built: 1961,  Status: Open,  Structure Length: 14.76m (48.43ft),  Average Daily Traffic: 10,585 (year 2022),  Truck Traffic: 27%,  Average Future Daily Traffic: 13,096 (year 2042),  Design Load: HS 20,  Features Intersected: CANOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 257.176,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.54m (50.98ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2022,  Other Special Inspection Date: March 2022,  Bridge Improvement Cost: $3,304,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $3,634,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7232,  Location: I59 * CANOE CREEK (Lat: 33.800200,  Lng: -86.372000),  Route carried "on" structure: Interstate 59,  Year Built: 1961,  Status: Temporarily open,  Structure Length: 14.75m (48.39ft),  Average Daily Traffic: 10,585 (year 2022),  Truck Traffic: 27%,  Average Future Daily Traffic: 13,096 (year 2042),  Design Load: HS 20,  Features Intersected: CANOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 257.176,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.53m (50.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2022,  Other Special Inspection Date: March 2022,  Bridge Improvement Cost: $3,194,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $3,513,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7375,  Location: AL 23 * I 59 (Lat: 33.777778,  Lng: -86.427778),  Route carried "on" structure: State highway 23,  Year Built: 1961,  Status: Open,  Structure Length: 9.43m (30.94ft),  Average Daily Traffic: 2,880 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,493 (year 2041),  Design Load: HS 20,  Features Intersected: I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.39m (34.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,279,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $2,507,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7496,  Location: I59 * AL 174 (Lat: 33.768889,  Lng: -86.466111),  Route carried "on" structure: State highway 174,  Year Built: 1961,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 6,960 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,119 (year 2041),  Design Load: HS 20,  Features Intersected: I - 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.982,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 106.7m (350.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,460,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $2,706,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8364,  Location: 1 5 MI SW SPRINGVILLE (Lat: 33.752689,  Lng: -86.486139),  Route carried "on" structure: ServiceCounty highway 510,  Year Built: 1964,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,310 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,815 (year 2037),  Design Load: H 15,  Features Intersected: NO NAME,  Facility Carried by Structure: ST CLAIR CO HWY 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9491,  Location: JCT CO RD 30 (Lat: 33.748333,  Lng: -86.493333),  Route carried "on" structure: US 11,  Year Built: 1934,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 5,130 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,721 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 258.411,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $576,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15183,  Location: 4 3 MI NE SPRINGVILLE (Lat: 33.804406,  Lng: -86.419556),  Route carried "on" structure: ServiceCounty highway 40,  Year Built: 1990,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 368 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 547 (year 2037),  Design Load: HS 20,  Features Intersected: CANOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $926,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17943,  Location: 3.5 MI. NO. AL 23 (Lat: 33.814003,  Lng: -86.382353),  Route carried "on" structure: US 11,  Year Built: 2005,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 3,070 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,022 (year 2041),  Design Load: HS 20,  Features Intersected: BIG CANOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 273.378,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,631,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $2,894,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19206,  Location: 4.4 MI NW SPRINGVILLE (Lat: 33.793533,  Lng: -86.517219),  Route carried "on" structure: ServiceCounty highway 43,  Year Built: 2005,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 14 (year 2004),  Average Future Daily Traffic: 28 (year 2029),  Design Load: HS 20,  Features Intersected: BIG CANOE CREEK,  Facility Carried by Structure: CANOE CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,211,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,332,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 7226,  Location: I59 * MOUNTAIN VIEW RD (Lat: 33.745697,  Lng: -86.485889),  Route carried "under" structure: Interstate 59,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 26,510 (year 2021),  Truck Traffic: 26%,  Features Intersected: I - 59,  Facility Carried by Structure: MOUNTAIN VIEW RD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 244.426,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 7233,  Location: CO RD 31 * I59 (Lat: 33.809447,  Lng: -86.359108),  Route carried "under" structure: Interstate 59,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 21,594 (year 2020),  Truck Traffic: 27%,  Features Intersected: I59,  Facility Carried by Structure: CO RD 31
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 258.733,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 7375,  Location: AL 23 * I 59 (Lat: 33.777778,  Lng: -86.427778),  Route carried "under" structure: Interstate 59,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 26,310 (year 2021),  Truck Traffic: 27%,  Features Intersected: I 59,  Facility Carried by Structure: AL 23
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 251.380,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 7496,  Location: I59 * AL 174 (Lat: 33.768889,  Lng: -86.466111),  Route carried "under" structure: Interstate 59,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 26,310 (year 2021),  Truck Traffic: 27%,  Features Intersected: I - 59,  Facility Carried by Structure: AL - 174
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 247.754,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 106.7m (350.1ft)

Discuss Springville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.