Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Stormstown, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 141ft / 42.8mTotal length
  • $1,795,000Total costs
  • 66,881Total average daily traffic
  • 7,927Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Stormstown
  • No street view available for this location

New bridges in Stormstown, PA - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 11930-1939
  • 11950-1959
  • 11970-1979
  • 31980-1989
  • 21990-1999
  • 92000-2009
  • 12010-2019
Reconstructed bridges in Stormstown, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Stormstown, PA
Average Bridge Truck Traffic in Stormstown, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 53.8%Good
  • 23.1%Satisfactory
  • 23.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 53.8%Good
  • 15.4%Satisfactory
  • 23.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 38.5%Good
  • 38.5%Satisfactory
  • 15.4%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 50.0%Satisfactory
  • 8.3%Fair
  • 16.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 9425,  Location: HANNAH (Lat: 40.766964,  Lng: -78.098458),  Route carried "on" structure: US 220B,  Year Built: 1926,  Year Reconstructed: 1952,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,286 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,036 (year 2040),  Design Load: H 15,  Features Intersected: SPARROW RUN,  Facility Carried by Structure: SR 220-US 220
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.130,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $522,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9427,  Location: 2 MI SW PORT MATILDA (Lat: 40.780308,  Lng: -78.081661),  Route carried "on" structure: US 220B,  Year Built: 1952,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,286 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,036 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH BALD EAGLE CREEK,  Facility Carried by Structure: SR 220-US 220
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.491,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $22,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $294,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9442,  Location: 1 MI E MARTHA FURNACE (Lat: 40.839078,  Lng: -77.996122),  Route carried "on" structure: US 2200,  Year Built: 1925,  Year Reconstructed: 1953,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,670 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,214 (year 2040),  Design Load: H 15,  Features Intersected: STEEL HOLLOW RUN,  Facility Carried by Structure: SR 3040
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.335,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m,  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $414,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9481,  Location: MARTHA FURNACE (Lat: 40.828231,  Lng: -78.014272),  Route carried "on" structure: State highway ,  Year Built: 1987,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 1,257 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,673 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SEDA-COG/NIT& BALD EAGLE,  Facility Carried by Structure: SR 322-US 322
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.148,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9483,  Location: MARTHA FURNACE (Lat: 40.828356,  Lng: -78.014131),  Route carried "on" structure: State highway ,  Year Built: 1987,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 1,257 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,673 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SEDA-COG/NIT& BALD EAGLE,  Facility Carried by Structure: SR 3042
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.148,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9733,  Location: CENTENNIAL (Lat: 40.754111,  Lng: -78.038486),  Route carried "on" structure: State highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 537 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 735 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: HALF MOON CREEK,  Facility Carried by Structure: ON TSR 966
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.005,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 9734,  Location: CENTENNIAL (Lat: 40.759361,  Lng: -78.037914),  Route carried "on" structure: State highway ,  Year Built: 1977,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 975 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,071 (year 2041),  Design Load: H 20,  Features Intersected: HALF MOON CREEK,  Facility Carried by Structure: ON TSR 966
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.018,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9751,  Location: HANNAH (Lat: 40.769931,  Lng: -78.103006),  Route carried "on" structure: State highway ,  Year Built: 1939,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 46 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 48 (year 2038),  Design Load: H 20,  Features Intersected: SPARROW RUN,  Facility Carried by Structure: SR 3025
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.913,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $510,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9844,  Location: 585 FT SOUTH INT RT 220 (Lat: 40.766392,  Lng: -78.096167),  Route carried "on" structure: ServiceCity street ,  Year Built: 1925,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 50 (year 2021),  Average Future Daily Traffic: 77 (year 2043),  Design Load: HS 20,  Features Intersected: BALD EAGLE CREEK,  Facility Carried by Structure: T-305 E. HANNAH LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $55,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 40135,  Location: 90 FT SOUTH INT US 220 (Lat: 40.767264,  Lng: -78.097514),  Route carried "on" structure: ServiceCity street ,  Year Built: 1995,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 50 (year 2021),  Average Future Daily Traffic: 77 (year 2043),  Design Load: HS 20,  Features Intersected: SPARROW RUN,  Facility Carried by Structure: T-305 E. HANNAH LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 40814,  Location: 1.1 MI. WEST OF GATESBURG (Lat: 40.743914,  Lng: -78.027178),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 250 (year 2021),  Average Future Daily Traffic: 364 (year 2043),  Design Load: HS 25 or greater,  Features Intersected: HALFMOON CREEK,  Facility Carried by Structure: T-307 GATESBURG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 41369,  Location: 3 MI N STATE COLLEGE (Lat: 40.829383,  Lng: -78.016694),  Route carried "on" structure: US 322,  Year Built: 2001,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 6,496 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 17,350 (year 2041),  Design Load: HS 20,  Features Intersected: RAMP W-S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.649,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41536,  Location: 1 MI N STATE COLLEGE (Lat: 40.829389,  Lng: -78.016722),  Route carried "on" structure: US 322,  Year Built: 2001,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 6,496 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 17,350 (year 2041),  Design Load: H 15,  Features Intersected: SR 3007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.649,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41718,  Location: 2 M N OF STATE COLLEGE (Lat: 40.829306,  Lng: -78.016556),  Route carried "on" structure: State highway ,  Year Built: 2002,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 8,431 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,463 (year 2040),  Design Load: HL 93,  Features Intersected: SR 99 AND RAMPS,  Facility Carried by Structure: SR 3042
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.654,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 56944,  Location: 0.4 MI NW OF U.S. 220 (Lat: 40.835789,  Lng: -78.016094),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 60 (year 2043),  Design Load: HL 93,  Features Intersected: ARDERY RUN,  Facility Carried by Structure: T-348 ARDERY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41369,  Location: 3 MI N STATE COLLEGE (Lat: 40.829383,  Lng: -78.016694),  Route carried "under" structure: Ramp State highway ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 4,978 (year 2021),  Truck Traffic: 8%,  Features Intersected: RAMP W-S,  Facility Carried by Structure: SR 322-US 322
Minimum Vertical Clearance: 6.11m (20.05ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 41536,  Location: 1 MI N STATE COLLEGE (Lat: 40.829389,  Lng: -78.016722),  Route carried "under" structure: State highway ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 2,609 (year 2021),  Truck Traffic: 10%,  Features Intersected: SR 3007,  Facility Carried by Structure: SR 322-US 322
Minimum Vertical Clearance: 8.76m (28.74ft),  Kilometerpoint: 3.587,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 41536,  Location: 1 MI N STATE COLLEGE (Lat: 40.829389,  Lng: -78.016722),  Route carried "under" structure: State highway ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,682 (year 2021),  Truck Traffic: 6%,  Features Intersected: SR 3007,  Facility Carried by Structure: SR 322-US 322
Minimum Vertical Clearance: 9.07m (29.76ft),  Kilometerpoint: 3.587,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 41718,  Location: 2 M N OF STATE COLLEGE (Lat: 40.829306,  Lng: -78.016556),  Route carried "under" structure: Interstate 99,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 11,499 (year 2021),  Truck Traffic: 15%,  Features Intersected: SR 99 AND RAMPS,  Facility Carried by Structure: SR 3042
Minimum Vertical Clearance: 5.29m (17.36ft),  Kilometerpoint: 21.078,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 41718,  Location: 2 M N OF STATE COLLEGE (Lat: 40.829306,  Lng: -78.016556),  Route carried "under" structure: Interstate 99,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 11,327 (year 2021),  Truck Traffic: 16%,  Features Intersected: SR 99 AND RAMPS,  Facility Carried by Structure: SR 3042
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 20.992,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 41718,  Location: 2 M N OF STATE COLLEGE (Lat: 40.829306,  Lng: -78.016556),  Route carried "under" structure: Ramp State highway ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 1,649 (year 2021),  Truck Traffic: 13%,  Features Intersected: SR 99 AND RAMPS,  Facility Carried by Structure: SR 3042
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Discuss Stormstown, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.