Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sunnyslope, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 269ft / 82.4mTotal length
  • $81,465,000Total costs
  • 196,801Total average daily traffic
  • 16,896Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sunnyslope
  • No street view available for this location

New bridges in Sunnyslope, WA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21950-1959
  • 11960-1969
  • 71970-1979
  • 11990-1999
  • 12010-2019
Average Bridge Daily Traffic in Sunnyslope, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 33.3%Good
  • 11.1%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 66.7%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 66.7%Good
  • 22.2%Satisfactory
Find on map >>   Show street view

Structure Number: 4136A,  Location: 14.4 E JCT US 97 (Lat: 47.467389,  Lng: -120.338833),  Route carried "on" structure: US 2,  Year Built: 1952,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 14,259 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,909 (year 2039),  Design Load: HS 20,  Features Intersected: US 2 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 191.303,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 31 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 29.9m (98.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.36m (14.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,774,000,  Roadway Improvement Cost: $555,000,  Total Project Cost: $5,548,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9102A,  Location: 0.3 E JCT US 97 ALT (Lat: 47.471583,  Lng: -120.319472),  Route carried "on" structure: US 2,  Year Built: 1975,  Status: Open,  Structure Length: 42.67m (139.99ft),  Average Daily Traffic: 25,907 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 32,539 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: COLUMBIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.751,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 76.2m (250.0ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 79.2m (259.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 42.67m (139.99ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2018,  Underwater Inspection Date: September 2017,  Bridge Improvement Cost: $21,280,000,  Roadway Improvement Cost: $4,256,000,  Total Project Cost: $42,560,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 9683A,  Location: 0.2 E JCT US 97 ALT (Lat: 47.471889,  Lng: -120.321500),  Route carried "on" structure: US 2,  Year Built: 1974,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 22,654 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 28,453 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.606,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.3m (92.8ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.58m (18.31ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $3,477,000,  Roadway Improvement Cost: $695,000,  Total Project Cost: $6,954,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 9683C,  Location: 0.8 E JCT US 97 ALT (Lat: 47.470272,  Lng: -120.308097),  Route carried "on" structure: US 2,  Year Built: 1974,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 25,907 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 32,124 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: DRY WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 193.636,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 24.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,872,000,  Roadway Improvement Cost: $374,000,  Total Project Cost: $3,744,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 10839A,  Location: JCT US 97 ALT (Lat: 47.472139,  Lng: -120.325111),  Route carried "on" structure: US 2,  Year Built: 1979,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 11,327 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,226 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 97 ALT, EUCLID AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.574,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.9m (157.2ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 87.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,643,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $3,286,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 10839B,  Location: JCT US 97 ALT (Lat: 47.472306,  Lng: -120.325111),  Route carried "on" structure: US 2,  Year Built: 1979,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 11,327 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,226 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US 97 ALT, EUCLID AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.574,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.2m (158.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,327,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $2,654,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 14723A,  Location: 4.9 N JCT SR 28 (Lat: 47.465194,  Lng: -120.336806),  Route carried "on" structure: State highway 285,  Year Built: 1996,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 27,674 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 34,758 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: PENNY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.870,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 28.9m (94.8ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.75m (12.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,386,000,  Roadway Improvement Cost: $477,000,  Total Project Cost: $4,772,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81736,  Location: 00.07W SR 97 (Lat: 47.487083,  Lng: -120.414889),  Route carried "on" structure: County highway 94200,  Year Built: 1930,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 1,857 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,385 (year 2040),  Design Load: H 15,  Features Intersected: WENATCHEE RIVER,  Facility Carried by Structure: OLD MONITOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 39.9m (130.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.19m (36.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $5,578,000,  Roadway Improvement Cost: $1,116,000,  Total Project Cost: $11,157,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 88283,  Location: W OF J.M. DICKENSON (Lat: 47.439897,  Lng: -122.736075),  Route carried "on" structure: County highway 21320,  Year Built: 2011,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,256 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,382 (year 2042),  Design Load: HL 93,  Features Intersected: MUCK FORK CREEK,  Facility Carried by Structure: LAKE HELENA RD SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $790,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4136A,  Location: 14.4 E JCT US 97 (Lat: 47.467389,  Lng: -120.338833),  Route carried "under" structure: US 2,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 13,906 (year 2019),  Truck Traffic: 9%,  Features Intersected: US 2 RAMP
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 191.383,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 7721A,  Location: 10.7 E JCT US 97 (Lat: 47.486806,  Lng: -120.411917),  Route carried "under" structure: US 2,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 23,753 (year 2019),  Truck Traffic: 7%,  Features Intersected: US 2,  Facility Carried by Structure: PEDESTRIANS
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 185.364,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 10839A,  Location: JCT US 2 (Lat: 47.472139,  Lng: -120.325111),  Route carried "under" structure: Alternate US 97,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 8,487 (year 2019),  Truck Traffic: 12%,  Features Intersected: US 97 ALT, EUCLID AVE,  Facility Carried by Structure: US 2
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 321.595,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 10839B,  Location: JCT US 2 (Lat: 47.472306,  Lng: -120.325111),  Route carried "under" structure: Alternate US 97,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 8,487 (year 2019),  Truck Traffic: 12%,  Features Intersected: US 97 ALT, EUCLID AVE,  Facility Carried by Structure: US 2
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 321.611,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.2m (158.1ft)

Discuss Sunnyslope, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.