Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sycamore, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 194ft / 59.1mTotal length
  • $12,394,000Total costs
  • 193,610Total average daily traffic
  • 7,534Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sycamore
  • No street view available for this location

New bridges in Sycamore, GA - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 21960-1969
  • 21980-1989
  • 32000-2009
Average Bridge Daily Traffic in Sycamore, GA
Average Bridge Truck Traffic in Sycamore, GA
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Very good
  • 60.0%Good
Find on map >>   Show street view

Structure Number: 2870008,  Location: 1.5 MI E OF SYCAMORE (Lat: 31.666258,  Lng: -83.611089),  Route carried "on" structure: State highway 32,  Year Built: 1967,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 1,020 (year 2011),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,530 (year 2031),  Design Load: HS 20,  Features Intersected: HAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2018,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $738,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2870009,  Location: 1.6 MI SE OF SYCAMORE (Lat: 31.665828,  Lng: -83.607858),  Route carried "on" structure: State highway 32,  Year Built: 1958,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 1,250 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,875 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR401(EXIT 78) @ 078.28N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,141,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,711,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 287003,  Location: 1 MI E OF SYCAMORE (Lat: 31.680858,  Lng: -83.619847),  Route carried "on" structure: Interstate 75,  Year Built: 1958,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 33,700 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 50,550 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 33 BUSSEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 128.748,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.5m (123.0ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 38.5m (126.3ft),  Out-to-Out Width: 40.0m (131.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,332,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,997,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2870038,  Location: 2.5 MI SW OF SYCAMORE (Lat: 31.640997,  Lng: -83.659158),  Route carried "on" structure: County highway 1181,  Year Built: 1961,  Status: Posted for load,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 890 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,335 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: CR 1148
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2018,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2870046,  Location: .8 MI E OF SYCAMORE (Lat: 31.672058,  Lng: -83.619989),  Route carried "on" structure: County highway 1990,  Year Built: 1958,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 390 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 585 (year 2031),  Design Load: H 15,  Features Intersected: HAT CREEK,  Facility Carried by Structure: DENHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2018,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 2875005,  Location: 3.5 MI E OF ASHBURN (Lat: 31.704969,  Lng: -83.591358),  Route carried "on" structure: County highway 10,  Year Built: 1980,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 130 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 195 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: WEST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 2875032,  Location: 2 MI SW OF SYCAMORE (Lat: 31.654819,  Lng: -83.664189),  Route carried "on" structure: County highway 204,  Year Built: 1980,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 160 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 240 (year 2031),  Design Load: HS 15,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: COFER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2875045,  Location: 1.4 MI EAST OF SYCAMORE (Lat: 31.672047,  Lng: -83.612858),  Route carried "on" structure: County highway 1990,  Year Built: 2006,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 390 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 585 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR401@78.81N,  Facility Carried by Structure: DENHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,379,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $2,069,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2875046,  Location: 1.5 MI NE OF SYCAMORE (Lat: 31.691369,  Lng: -83.628089),  Route carried "on" structure: County highway 11,  Year Built: 2006,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 430 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 645 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR401@80.42N,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,270,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,905,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2875049,  Location: 3 MI SE OF SYCAMORE (Lat: 31.646189,  Lng: -83.592119),  Route carried "on" structure: County highway 35,  Year Built: 2006,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 50 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR401@076.65N,  Facility Carried by Structure: ROBERT DAVIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,328,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,993,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2870009,  Location: 1.6 MI SE OF SYCAMORE (Lat: 31.665828,  Lng: -83.607858),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 38,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 32,  Facility Carried by Structure: SR 32
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 125.529,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 287003,  Location: 1 MI E OF SYCAMORE (Lat: 31.680858,  Lng: -83.619847),  Route carried "under" structure: County highway 33,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-75 (EXIT 80),  Facility Carried by Structure: I-75
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2875045,  Location: 1.4 MI EAST OF SYCAMORE (Lat: 31.672047,  Lng: -83.612858),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 38,600 (year 1999),  Truck Traffic: 10%,  Features Intersected: FAS 1990 DENHAM,  Facility Carried by Structure: DENHAM ROAD
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 127.138,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2875046,  Location: 1.5 MI NE OF SYCAMORE (Lat: 31.691369,  Lng: -83.628089),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 39,600 (year 1999),  Truck Traffic: 4%,  Features Intersected: CR 11 AIRPORT ROAD,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 128.748,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2875049,  Location: 3 MI SE OF SYCAMORE (Lat: 31.646189,  Lng: -83.592119),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 37,900 (year 1999),  Truck Traffic: 3%,  Features Intersected: CR 35 ROBERT DAVIS ROAD,  Facility Carried by Structure: ROBERT DAVIS ROAD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 123.920,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Sycamore, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.