Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Terrace Heights, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 157ft / 48.1mTotal length
  • $33,862,000Total costs
  • 39,235Total average daily traffic
  • 5,093Total average daily truck traffic
  • 48,640Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Terrace Heights
  • No street view available for this location

New bridges in Terrace Heights, WA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11950-1959
  • 61960-1969
  • 41970-1979
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Terrace Heights, WA
Average Bridge Truck Traffic in Terrace Heights, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 17.6%Very good
  • 52.9%Good
  • 23.5%Satisfactory
  • 5.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.5%Very good
  • 52.9%Good
  • 11.8%Satisfactory
  • 5.9%Fair
  • 5.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.5%Very good
  • 58.8%Good
  • 11.8%Satisfactory
  • 5.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 20.0%Good
  • 13.3%Satisfactory
Find on map >>   Show street view

Structure Number: 13ROZPPFB,  Location: ROZA ID POWERPLANT, YAKIM (Lat: 46.619475,  Lng: -120.477369),  Route carried "on" structure: ServiceOther road ,  Year Built: 1937,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 10 (year 2020),  Average Future Daily Traffic: 10 (year 2040),  Design Load: HS 20,  Features Intersected: WASTEWAY NO. 2,  Facility Carried by Structure: REST HAVEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Bureau of Reclamation,  Approaching Roadway Width: 3.1m (10.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 3.1m (10.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 8561A,  Location: 5.3 E KITTITAS CO (Lat: 46.689806,  Lng: -120.457806),  Route carried "on" structure: Interstate 82,  Year Built: 1969,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 9,800 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 12,857 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: E POMONA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.491,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Bridge Improvement Cost: $1,336,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $2,672,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8561C,  Location: 5.3 E KITTITAS CO (Lat: 46.689944,  Lng: -120.458278),  Route carried "on" structure: Interstate 82,  Year Built: 1969,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 9,800 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 12,857 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: E POMONA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.475,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Bridge Improvement Cost: $1,336,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $2,672,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 81983,  Location: 00.16 NO BUTTERFLD (Lat: 46.616111,  Lng: -120.456033),  Route carried "on" structure: County highway 45610,  Year Built: 1979,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 25 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 50 (year 2039),  Design Load: HS 20,  Features Intersected: ROZA CANAL,  Facility Carried by Structure: 33RD ST.,N.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,550,000,  Roadway Improvement Cost: $310,000,  Total Project Cost: $3,101,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82139,  Location: 00.09 N HARTFORD RD (Lat: 46.615214,  Lng: -120.483931),  Route carried "on" structure: County highway 45250,  Year Built: 1959,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 177 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 340 (year 2039),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: 15TH ST.,N.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,642,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82155,  Location: 00.25 W BUTTERFIELD (Lat: 46.613889,  Lng: -120.477500),  Route carried "on" structure: County highway 45100,  Year Built: 1964,  Status: Posted for load,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 630 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 750 (year 2041),  Design Load: H 15,  Features Intersected: ROZA POWER WASTEWAY,  Facility Carried by Structure: HARTFORD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 15.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $1,368,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $2,736,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82162,  Location: 00.33 W BUTTERFIELD (Lat: 46.615000,  Lng: -120.475000),  Route carried "on" structure: County highway 45300,  Year Built: 1964,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 360 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 460 (year 2039),  Design Load: H 15,  Features Intersected: ROZA POWER WASTEWAY,  Facility Carried by Structure: MARSH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $3,405,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82224,  Location: 00.52 W CUT OFF RD (Lat: 46.618681,  Lng: -120.477544),  Route carried "on" structure: County highway 45600,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 155 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 186 (year 2041),  Design Load: H 20,  Features Intersected: SPILLWAY,  Facility Carried by Structure: REST HAVEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Very good,  Operating Rating: 13.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $1,824,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82869,  Location: 00.09 W HILLCREST (Lat: 46.604722,  Lng: -120.436111),  Route carried "on" structure: County highway 40500,  Year Built: 1972,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 3,363 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,985 (year 2041),  Design Load: HS 20,  Features Intersected: ROZA CANAL,  Facility Carried by Structure: TERRACE HTS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,383,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $2,766,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82926,  Location: 00.02 S TERRACE HTS (Lat: 46.602217,  Lng: -120.429356),  Route carried "on" structure: County highway 43530,  Year Built: 1978,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 525 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 740 (year 2039),  Design Load: HS 20,  Features Intersected: ROZA CANAL,  Facility Carried by Structure: SANTA ROZA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83073,  Location: 00.17 S TERRACE HTS (Lat: 46.600683,  Lng: -120.422350),  Route carried "on" structure: County highway 43850,  Year Built: 1967,  Status: Posted for load,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 210 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 490 (year 2039),  Design Load: HS 20,  Features Intersected: ROZA CANAL,  Facility Carried by Structure: LOCUST AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 9.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 6.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,581,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $3,162,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83107,  Location: 00.07 S BITTNER RD (Lat: 46.597222,  Lng: -120.416111),  Route carried "on" structure: County highway 40500,  Year Built: 1937,  Status: Posted for load,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 1,500 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,010 (year 2039),  Design Load: H 15,  Features Intersected: ROZA CANAL,  Facility Carried by Structure: TERRACE HTS DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $802,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,603,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8704,  Location: 00.03 W. of Panorama Dr. (Lat: 46.606481,  Lng: -120.440778),  Route carried "on" structure: County highway 44000,  Year Built: 2002,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 6,470 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,012 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Roza Canal,  Facility Carried by Structure: Roza Hill Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,133,000,  Roadway Improvement Cost: $427,000,  Total Project Cost: $4,266,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87402,  Location: .06 S of Terrace Hts Dr (Lat: 46.602583,  Lng: -120.432972),  Route carried "on" structure: County highway 43550,  Year Built: 2006,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 850 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 950 (year 2039),  Design Load: HL 93,  Features Intersected: Roza Canal,  Facility Carried by Structure: Country Club Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 67.1m (220.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 78.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87934,  Location: 0.04 S Terrace Hgts (Lat: 46.605800,  Lng: -120.445847),  Route carried "on" structure: County highway 40410,  Year Built: 1969,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,303 (year 2039),  Design Load: HS 20,  Features Intersected: Selah-Moxee Canal,  Facility Carried by Structure: S 41st St
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,186,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 88554,  Location: 00.07 NE of Mountainview (Lat: 46.610558,  Lng: -120.444833),  Route carried "on" structure: County highway 44400,  Year Built: 2013,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 1,300 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,520 (year 2039),  Design Load: HL 93,  Features Intersected: Roza canal,  Facility Carried by Structure: Hillcrest Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89053,  Location: 0.14 SW HILLCREST DR. (Lat: 46.609058,  Lng: -120.440519),  Route carried "on" structure: County highway 44080,  Year Built: 2019,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 1,060 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,120 (year 2039),  Design Load: HL 93,  Features Intersected: Roza Canal,  Facility Carried by Structure: MAPLE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 18 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,414,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $2,827,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Discuss Terrace Heights, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.