Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Theodore, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 262ft / 80.1mTotal length
  • $37,449,000Total costs
  • 272,886Total average daily traffic
  • 33,840Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Theodore
  • No street view available for this location

New bridges in Theodore, AL - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 81960-1969
  • 41980-1989
  • 51990-1999
  • 82000-2009
  • 22010-2019
Average Bridge Daily Traffic in Theodore, AL
Average Bridge Truck Traffic in Theodore, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 45.5%Good
  • 36.4%Satisfactory
  • 9.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 36.4%Good
  • 45.5%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 54.5%Good
  • 45.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Very good
  • 22.7%Good
  • 54.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Good
  • 57.1%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 3609,  Location: 0.9 MI S US 90 (Lat: 30.535503,  Lng: -88.170625),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 10,367 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,405 (year 2040),  Design Load: HS 20,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: BELLINGRATH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $438,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 4316,  Location: 1.4 MI W I-10 (Lat: 30.559600,  Lng: -88.172725),  Route carried "on" structure: US 90,  Year Built: 1952,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 21,268 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 31,902 (year 2039),  Design Load: H 15,  Features Intersected: RABBIT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.476,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.6m (57.7ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.27m (7.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,350,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,485,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7291,  Location: 0.7 MI W CO RD 19 (Lat: 30.494394,  Lng: -88.244633),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,474 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,676 (year 2040),  Design Load: H 20,  Features Intersected: HAMMAR CREEK,  Facility Carried by Structure: HALF-MILE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $394,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7893,  Location: 0.8 MI N US 90 (Lat: 30.558625,  Lng: -88.180994),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 6,781 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,076 (year 2041),  Design Load: H 15,  Features Intersected: RABBIT CREEK,  Facility Carried by Structure: CAROL PLANTATION R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $746,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8127,  Location: 4.2 MI W US 90 (Lat: 30.543939,  Lng: -88.226067),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 54,543 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 81,815 (year 2040),  Design Load: HS 20,  Features Intersected: FOWL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.503,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,888,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $3,177,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8132,  Location: 0.9 MI W JCT US 90 (Lat: 30.574686,  Lng: -88.182419),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 6,305 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,458 (year 2040),  Design Load: H 20,  Features Intersected: I-10,  Facility Carried by Structure: CAROL PLANTATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,301,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $2,531,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8135,  Location: I-10 @ US 90 INTERCHANGE (Lat: 30.583483,  Lng: -88.169739),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 3,113 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,670 (year 2040),  Design Load: HS 20,  Features Intersected: RATTLESNAKE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.291,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,043,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,147,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8136,  Location: I-10/US 90 INTERCH (Lat: 30.583517,  Lng: -88.170936),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 3,028 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,542 (year 2040),  Design Load: HS 20,  Features Intersected: RATTLESNAKE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.428,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 69.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $634,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $697,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12339,  Location: 0.9 MI N TWO MILE RD (Lat: 30.485697,  Lng: -88.208556),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 507 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 523 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: CLEVELAND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $537,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13551,  Location: 1.9 MI S LAURINDINE RD (Lat: 30.474519,  Lng: -88.169144),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 5,004 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,658 (year 2040),  Design Load: HS 20,  Features Intersected: FOWL RIVER,  Facility Carried by Structure: BELLINGRATH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $1,485,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $1,634,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13615,  Location: 0.7 MI SW I-10 (Lat: 30.569772,  Lng: -88.171608),  Route carried "on" structure: US 90,  Year Built: 1985,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 27,246 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 40,869 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.617,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 85.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,151,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,266,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14251,  Location: 2.4 MI S LAURENDINE RD (Lat: 30.468686,  Lng: -88.168994),  Route carried "on" structure: County highway 59,  Year Built: 1987,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 5,067 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,414 (year 2040),  Design Load: HS 20,  Features Intersected: MIDDLE FORK E FOWL RIVER,  Facility Carried by Structure: BELLINGRATH RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 2.400,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $417,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $459,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16643,  Location: 0.13 MI S OF I-10 (Lat: 30.574783,  Lng: -88.178319),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 480 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 713 (year 2040),  Design Load: HS 20,  Features Intersected: TRIBUTARY TO RABBIT CREE,  Facility Carried by Structure: MIDDLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $290,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16644,  Location: 0.84 MI E OF HWY 59 (Lat: 30.516764,  Lng: -88.155992),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,318 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,958 (year 2040),  Design Load: HS 20,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: INDUSTRIAL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 80.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $609,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $670,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16895,  Location: 0.76MI E BELLINGRATH RD (Lat: 30.501917,  Lng: -88.157472),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,309 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,431 (year 2040),  Design Load: HS 20,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: LAURENDINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $712,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $783,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17126,  Location: 1ST DRAIN W OF CO RD 59 (Lat: 30.501817,  Lng: -88.176378),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 3,680 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,468 (year 2040),  Design Load: HS 20,  Features Intersected: E FORK OF FOWL RIVER,  Facility Carried by Structure: HALF MILE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.23m (4.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $297,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17751,  Location: 0.7 MI W OF CO ROAD 59 (Lat: 30.501119,  Lng: -88.181503),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 3,595 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,342 (year 2040),  Design Load: HS 20,  Features Intersected: MIDDLE FORK FOWL RIVER,  Facility Carried by Structure: HALF MILE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $1,787,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $1,966,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18393,  Location: CO RD 39 @ US 90 (Lat: 30.512519,  Lng: -88.227153),  Route carried "on" structure: County highway 39,  Year Built: 2009,  Status: Open,  Structure Length: 14.72m (48.29ft),  Average Daily Traffic: 8,041 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,062 (year 2039),  Design Load: HS 20,  Features Intersected: US 90/CSX RR/SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.50m (50.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,740,000,  Roadway Improvement Cost: $574,000,  Total Project Cost: $6,314,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18394,  Location: CO RD 39 @ US 90 (Lat: 30.512375,  Lng: -88.227392),  Route carried "on" structure: County highway 39,  Year Built: 2009,  Status: Open,  Structure Length: 14.72m (48.29ft),  Average Daily Traffic: 8,041 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,061 (year 2039),  Design Load: HS 20,  Features Intersected: US 90/CSX RR/SERVICE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.50m (50.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $6,910,000,  Roadway Improvement Cost: $691,000,  Total Project Cost: $7,601,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18924,  Location: 2.7 MI E CO RD 39 (Lat: 30.528367,  Lng: -88.197006),  Route carried "on" structure: US 90,  Year Built: 2007,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 9,312 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,968 (year 2038),  Design Load: HS 20,  Features Intersected: FOWL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.033,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.8m (45.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,505,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,756,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18983,  Location: 0.2 MI N US HWY 90 (Lat: 30.518694,  Lng: -88.221164),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 2,101 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,122 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: MURRAY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $616,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $678,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19488,  Location: 258' N. OF HALF MILE ROAD (Lat: 30.495222,  Lng: -88.208453),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 2,626 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,902 (year 2040),  Features Intersected: UNNAMED BRANCH,  Facility Carried by Structure: PADGETT SWITCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $258,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $284,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19489,  Location: 668'W.OF PINE SPRINGS RD (Lat: 30.494506,  Lng: -88.208647),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 3,680 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,468 (year 2040),  Features Intersected: UNNAMED BRANCH,  Facility Carried by Structure: HALF MILE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $450,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20472,  Location: 0.1 MI N US90 (Lat: 30.532817,  Lng: -88.193467),  Route carried "on" structure: County highway 2063,  Year Built: 2011,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 671 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 997 (year 2040),  Design Load: HS 20,  Features Intersected: DITCH,  Facility Carried by Structure: SHASTA WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $450,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21352,  Location: 1.1 mi W Co Rd 59 (Lat: 30.497353,  Lng: -88.186547),  Route carried "on" structure: County highway 24,  Year Built: 2016,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 3,680 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,468 (year 2040),  Design Load: HS 20,  Features Intersected: West Fork Fowl River,  Facility Carried by Structure: Half Mile Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 8132,  Location: 0.9 MI W JCT US 90 (Lat: 30.574686,  Lng: -88.182419),  Route carried "under" structure: Interstate 10,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 62,641 (year 2020),  Truck Traffic: 21%,  Features Intersected: I-10,  Facility Carried by Structure: CAROL PLANTATION
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 23.846,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 18393,  Location: CO RD 39 @ US 90 (Lat: 30.512519,  Lng: -88.227153),  Route carried "under" structure: ServiceOther road ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 298 (year 2019),  Truck Traffic: 14%,  Features Intersected: US 90/CSX RR/SERVICE RD,  Facility Carried by Structure: CO RD 39 NBL
Minimum Vertical Clearance: 7.28m (23.88ft),  Kilometerpoint: 0.161,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 18393,  Location: CO RD 39 @ US 90 (Lat: 30.512519,  Lng: -88.227153),  Route carried "under" structure: US 16,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 7,204 (year 2019),  Truck Traffic: 6%,  Features Intersected: US 90/CSX RR/SERVICE RD,  Facility Carried by Structure: CO RD 39 NBL
Minimum Vertical Clearance: 7.79m (25.56ft),  Kilometerpoint: 18.717,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 18394,  Location: CO RD 39 @ US 90 (Lat: 30.512375,  Lng: -88.227392),  Route carried "under" structure: ServiceOther road ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 302 (year 2019),  Truck Traffic: 16%,  Features Intersected: US 90/CSX RR/SERVICE RD,  Facility Carried by Structure: CO RD 39 SBL
Minimum Vertical Clearance: 6.59m (21.62ft),  Kilometerpoint: 0.161,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 18394,  Location: CO RD 39 @ US 90 (Lat: 30.512375,  Lng: -88.227392),  Route carried "under" structure: US 16,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 7,204 (year 2019),  Truck Traffic: 6%,  Features Intersected: US 90/CSX RR/SERVICE RD,  Facility Carried by Structure: CO RD 39 SBL
Minimum Vertical Clearance: 7.83m (25.69ft),  Kilometerpoint: 18.717,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Discuss Theodore, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.