  • 22Number of bridges
  • 141ft / 42.9mTotal length
  • $16,348,000Total costs
  • 40,565Total average daily traffic
  • 4,951Total average daily truck traffic
  • 51,726Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Thomasville
  • No street view available for this location

New bridges in Thomasville, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 31940-1949
  • 31960-1969
  • 11970-1979
  • 21980-1989
  • 51990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Thomasville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 31970-1979
  • 11980-1989
Average Bridge Daily Traffic in Thomasville, AL
Average Bridge Truck Traffic in Thomasville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Excellent
  • 50.0%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Excellent
  • 50.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Excellent
  • 50.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.8%Excellent
  • 14.3%Very good
  • 52.4%Good
  • 23.8%Satisfactory
  • 4.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 61.1%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 232,  Location: 2.99 MI.N T'VILLE CT.LTS (Lat: 31.931667,  Lng: -87.691667),  Route carried "on" structure: County highway 27,  Year Built: 1924,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 300 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 330 (year 2038),  Design Load: H 10,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $410,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1682,  Location: 0.9 MI. S. SR 106 (Lat: 31.552333,  Lng: -86.306233),  Route carried "on" structure: US 29,  Year Built: 1923,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,980 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,698 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.543,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $352,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2256,  Location: 1.4 MI. N. OF THOMASVILLE (Lat: 31.957153,  Lng: -87.723419),  Route carried "on" structure: State highway 5,  Year Built: 1940,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,860 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 8,589 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.239,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $355,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2257,  Location: 2.7 MI. N. OF THOMASVILLE (Lat: 31.964658,  Lng: -87.702328),  Route carried "on" structure: State highway 5,  Year Built: 1940,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 6,860 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 8,589 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.344,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 80.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $656,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $722,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2258,  Location: 3.9 MI. N. OF THOMASVILLE (Lat: 31.965608,  Lng: -87.682739),  Route carried "on" structure: State highway 5,  Year Built: 1940,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 6,500 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,138 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.272,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $439,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $483,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7572,  Location: 0.20 MI.E.CO.RT.27 (Lat: 31.933333,  Lng: -87.685000),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 100 (year 1995),  Average Future Daily Traffic: 110 (year 2038),  Features Intersected: BEAR CREEK,  Facility Carried by Structure: ROUND HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $470,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 11822,  Location: 3 MI.W THOMASVILLE (Lat: 31.921667,  Lng: -87.803333),  Route carried "on" structure: County highway 44,  Year Built: 1977,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 400 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 440 (year 2041),  Design Load: H 15,  Features Intersected: BASHI CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $312,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12552,  Location: THOMASVILLE (Lat: 31.863628,  Lng: -87.747167),  Route carried "on" structure: US 43,  Year Built: 1981,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,491 (year 2033),  Design Load: HS 20,  Features Intersected: BASSETTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 141.027,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,100,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,310,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12553,  Location: THOMASVILLE (Lat: 31.863597,  Lng: -87.746878),  Route carried "on" structure: US 43,  Year Built: 1981,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,491 (year 2033),  Design Load: HS 20,  Features Intersected: BASSETTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 141.027,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,100,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,310,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12648,  Location: 0.84 MI.S. TVILLE (Lat: 31.878333,  Lng: -87.726667),  Route carried "on" structure: County highway 27,  Year Built: 1924,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 900 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 950 (year 2038),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $306,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12685,  Location: 0.20 MI. E US 43 (Lat: 31.868333,  Lng: -87.741667),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 150 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 165 (year 2041),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: RURAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $404,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 12687,  Location: 0.87 MI.W CO.RT.48 (Lat: 31.951667,  Lng: -87.800000),  Route carried "on" structure: County highway ,  Year Built: 1963,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 75 (year 1995),  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 20,  Features Intersected: JOHNSON CREEK,  Facility Carried by Structure: GLOVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 85.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $223,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15065,  Location: 0.50 MI.E.CO RT 27 (Lat: 31.931667,  Lng: -87.681667),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 1995),  Average Future Daily Traffic: 110 (year 2038),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: ROUND HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $344,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 16427,  Location: THOMASVILLE (Lat: 31.889256,  Lng: -87.741492),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 800 (year 1992),  Truck Traffic: 5%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 15,  Features Intersected: STREAM,  Facility Carried by Structure: GATES DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $640,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16428,  Location: THOMASVILLE (Lat: 31.888450,  Lng: -87.729500),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 450 (year 1992),  Average Future Daily Traffic: 550 (year 2031),  Design Load: HS 15,  Features Intersected: STREAM,  Facility Carried by Structure: GATES DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.608,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.56m (5.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $516,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1682,  Location: THOMASVILLE (Lat: 31.928478,  Lng: -87.751511),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 300 (year 1992),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2031),  Features Intersected: STREAM,  Facility Carried by Structure: ANDREWS DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $394,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $433,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16821,  Location: THOMASVILLE (Lat: 31.925319,  Lng: -87.753567),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 300 (year 1992),  Average Future Daily Traffic: 300 (year 2031),  Features Intersected: STREAM,  Facility Carried by Structure: LINDWOOD DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Toll: On Interstate toll segment,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $398,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18865,  Location: THOMASVILLE (Lat: 31.912117,  Lng: -87.751833),  Route carried "on" structure: State highway 154,  Year Built: 2006,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 3,030 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,697 (year 2033),  Design Load: HS 20,  Features Intersected: ALLEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.327,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $506,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $557,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20008,  Location: 0.5 MILES EAST OF US 43 (Lat: 31.841533,  Lng: -87.746836),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 1,250 (year 2006),  Average Future Daily Traffic: 2,000 (year 2041),  Design Load: HS 20,  Features Intersected: BASSETTS CREEK,  Facility Carried by Structure: LP ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,544,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $1,698,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20009,  Location: 2 MILES EAST OF US 43 (Lat: 31.843344,  Lng: -87.740242),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 1,250 (year 2006),  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RAILROA,  Facility Carried by Structure: LP ROAD???????????
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,601,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,761,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20107,  Location: THOMASVILLE (Lat: 31.874722,  Lng: -87.739167),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 100 (year 2006),  Average Future Daily Traffic: 200 (year 2031),  Design Load: HS 20,  Features Intersected: BASSETTS CREEK,  Facility Carried by Structure: SOUTH IND. PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.636,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $581,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21281,  Location: 2 mi west of Thomasville (Lat: 31.876997,  Lng: -87.756853),  Route carried "on" structure: State highway 154,  Year Built: 2016,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 310 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 378 (year 2033),  Design Load: HS 20,  Features Intersected: Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.843,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.72m (5.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $694,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $763,000 ( Estimate for 2022)