Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tinicum Township, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 725ft / 221mTotal length
  • $7,334,000Total costs
  • 426,416Total average daily traffic
  • 35,677Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tinicum Township
  • No street view available for this location

New bridges in Tinicum Township, PA - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 51970-1979
  • 81980-1989
  • 12000-2009
Reconstructed bridges in Tinicum Township, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Tinicum Township, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 16.7%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 50.0%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Good
  • 50.0%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 14936,  Location: NR.SCOTTS PAPER 36B13 (Lat: 39.875750,  Lng: -75.271797),  Route carried "on" structure: Interstate 95,  Year Built: 1983,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 90.16m (295.80ft),  Average Daily Traffic: 65,514 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 72,240 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RELOC.BARTRAM AV;CONRAIL
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 17.090,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Number Of Approach Spans: 17,  Length of Maximum Span: 48.2m (158.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 23.6m (77.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 91.30m (299.54ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 14938,  Location: NR.SCOTTS PAPER 36B13 (Lat: 39.876139,  Lng: -75.271861),  Route carried "on" structure: Interstate 95,  Year Built: 1983,  Status: Open,  Structure Length: 92.63m (303.90ft),  Average Daily Traffic: 77,157 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 81,749 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RELOC.BARTRAM AV;CONRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.151,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 21,  Length of Maximum Span: 49.7m (163.1ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 23.6m (77.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 93.80m (307.74ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 14959,  Location: TINICUM TWP LINE 44D02 (Lat: 39.866353,  Lng: -75.313389),  Route carried "on" structure: State highway 291,  Year Built: 1943,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 15,275 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 19,218 (year 2032),  Design Load: HL 93,  Features Intersected: DARBY CREEK,  Facility Carried by Structure: GOVERNOR PRINTZ BL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.837,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.90m (35.76ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $711,000,  Total Project Cost: $3,258,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1496,  Location: NR.HILTON COMP. 3808 F01 (Lat: 39.874739,  Lng: -75.275014),  Route carried "on" structure: State highway 291,  Year Built: 1984,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 5,777 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,692 (year 2032),  Design Load: HS 20,  Features Intersected: RAMP A EASTBOUND,  Facility Carried by Structure: RELOC;LR 762 W.B.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.159,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14961,  Location: 1MI.S.PHILA.AIRPT. 36A13 (Lat: 39.875500,  Lng: -75.266903),  Route carried "on" structure: State highway 291,  Year Built: 1948,  Status: Open,  Structure Length: 14.30m (46.92ft),  Average Daily Traffic: 23,100 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,155 (year 2032),  Design Load: HS 20,  Features Intersected: CONRAIL;LITTLE CRUM CRK.,  Facility Carried by Structure: INDUSTRIAL HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.105,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 36 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.10m (49.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $562,000,  Total Project Cost: $2,577,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14993,  Location: OVER I-95;TINICUM 44F01 (Lat: 39.870878,  Lng: -75.301253),  Route carried "on" structure: State highway 420,  Year Built: 1975,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 38,326 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,172 (year 2032),  Design Load: HS 20,  Features Intersected: I-95 AND RAMPS,  Facility Carried by Structure: WANAMAKER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 26.1m (85.6ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $327,000,  Total Project Cost: $1,499,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 53314,  Location: Near UPS Warehouse 3808F2 (Lat: 39.863889,  Lng: -75.278028),  Route carried "on" structure: Business City street ,  Year Built: 2001,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 500 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 550 (year 2026),  Design Load: HS 20,  Features Intersected: Hog Island Stream,  Facility Carried by Structure: Hog Island road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 14936,  Location: NR.SCOTTS PAPER 36B13 (Lat: 39.875750,  Lng: -75.271797),  Route carried "under" structure: State highway 291,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 9,355 (year 2022),  Truck Traffic: 11%,  Features Intersected: RELOC.BARTRAM AV;CONRAIL,  Facility Carried by Structure: INTERSTATE 95(NB)
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 13.533,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 14936,  Location: NR.SCOTTS PAPER 36B13 (Lat: 39.875750,  Lng: -75.271797),  Route carried "under" structure: State highway 291,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 8,345 (year 2022),  Truck Traffic: 11%,  Features Intersected: RELOC.BARTRAM AV;CONRAIL,  Facility Carried by Structure: INTERSTATE 95(NB)
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 13.573,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 14938,  Location: NR.SCOTTS PAPER 36B13 (Lat: 39.876139,  Lng: -75.271861),  Route carried "under" structure: State highway 291,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 9,355 (year 2022),  Truck Traffic: 11%,  Features Intersected: RELOC.BARTRAM AV;CONRAIL,  Facility Carried by Structure: INTERSTATE 95(SB)
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 13.533,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.7m (163.1ft)

Find on map >>   Show street view

Structure Number: 14938,  Location: NR.SCOTTS PAPER 36B13 (Lat: 39.876139,  Lng: -75.271861),  Route carried "under" structure: State highway 291,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 8,345 (year 2022),  Truck Traffic: 11%,  Features Intersected: RELOC.BARTRAM AV;CONRAIL,  Facility Carried by Structure: INTERSTATE 95(SB)
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 13.573,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.7m (163.1ft)

Find on map >>   Show street view

Structure Number: 1496,  Location: NR.HILTON COMP. 3808 F01 (Lat: 39.874739,  Lng: -75.275014),  Route carried "under" structure: Ramp State highway ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 7,659 (year 2021),  Truck Traffic: 10%,  Features Intersected: RAMP A EASTBOUND,  Facility Carried by Structure: RELOC;LR 762 W.B.
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 14993,  Location: OVER I-95;TINICUM 44F01 (Lat: 39.870878,  Lng: -75.301253),  Route carried "under" structure: Interstate 95,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 68,251 (year 2022),  Truck Traffic: 8%,  Features Intersected: I-95 AND RAMPS,  Facility Carried by Structure: WANAMAKER AVENUE
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 14.507,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 14993,  Location: OVER I-95;TINICUM 44F01 (Lat: 39.870878,  Lng: -75.301253),  Route carried "under" structure: Interstate 95,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 68,418 (year 2022),  Truck Traffic: 8%,  Features Intersected: I-95 AND RAMPS,  Facility Carried by Structure: WANAMAKER AVENUE
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 14.458,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 14993,  Location: OVER I-95;TINICUM 44F01 (Lat: 39.870878,  Lng: -75.301253),  Route carried "under" structure: Ramp State highway ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 11,633 (year 2022),  Truck Traffic: 10%,  Features Intersected: I-95 AND RAMPS,  Facility Carried by Structure: WANAMAKER AVENUE
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 14993,  Location: OVER I-95;TINICUM 44F01 (Lat: 39.870878,  Lng: -75.301253),  Route carried "under" structure: Ramp State highway ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 9,406 (year 2022),  Truck Traffic: 10%,  Features Intersected: I-95 AND RAMPS,  Facility Carried by Structure: WANAMAKER AVENUE
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.6m (61.0ft)

Discuss Tinicum Township, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.