Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Toppenish, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 125ft / 38.2mTotal length
  • $17,581,000Total costs
  • 61,739Total average daily traffic
  • 9,143Total average daily truck traffic
  • 78,485Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Toppenish
  • No street view available for this location

New bridges in Toppenish, WA - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 21950-1959
  • 61960-1969
  • 31970-1979
  • 11990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Toppenish, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 11970-1979
Average Bridge Daily Traffic in Toppenish, WA
Average Bridge Truck Traffic in Toppenish, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.3%Very good
  • 56.3%Good
  • 18.8%Satisfactory
  • 18.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 56.3%Good
  • 31.3%Satisfactory
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 75.0%Good
  • 12.5%Poor
  • 6.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 61.1%Very good
  • 5.6%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: P114,  Location: 7.2 KM SOUTH OF TOPPENISH (Lat: 46.314556,  Lng: -120.314889),  Route carried "on" structure: Federal lands road 94,  Year Built: 1975,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 100 (year 2041),  Design Load: HS 20,  Features Intersected: TOPPENISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.100,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.0m (62.3ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P115,  Location: 7.2 KM SOUTH OF TOPPENISH (Lat: 46.314139,  Lng: -120.314889),  Route carried "on" structure: Federal lands road 94,  Year Built: 1975,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 100 (year 2041),  Design Load: HS 20,  Features Intersected: TOPPENISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.300,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13521-00099,  Location: 1/4 MI N OF REFUGE OFFICE (Lat: 46.308333,  Lng: -120.346667),  Route carried "on" structure: Federal lands road ,  Year Built: 1998,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 5 (year 2021),  Average Future Daily Traffic: 5 (year 2041),  Design Load: HS 20,  Features Intersected: TOPPENISH CREEK,  Facility Carried by Structure: REFUGE ROAD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: Bureau of Fish and Wildlife,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1516B,  Location: 27.3 N KLICKITAT CO (Lat: 46.361347,  Lng: -120.320183),  Route carried "on" structure: US 97,  Year Built: 1931,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 4,916 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 6,449 (year 2039),  Design Load: H 15,  Features Intersected: WANITY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.896,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 20.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $2,033,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1942A,  Location: 1.0 E JCT I-82 (Lat: 46.406750,  Lng: -120.314500),  Route carried "on" structure: State highway 22,  Year Built: 1935,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 8,958 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 11,752 (year 2039),  Design Load: H 15,  Features Intersected: SLOUGH OF YAKIMA R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 20.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $1,380,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3363A,  Location: 1.5 N JCT SR 22 (Lat: 46.382622,  Lng: -120.344306),  Route carried "on" structure: US 97,  Year Built: 1948,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 6,711 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 8,804 (year 2039),  Design Load: HS 15,  Features Intersected: WANITY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.212,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $571,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,142,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3376B,  Location: 24.8 N KLICKITAT CO (Lat: 46.324156,  Lng: -120.320356),  Route carried "on" structure: US 97,  Year Built: 1931,  Year Reconstructed: 1948,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 4,231 (year 2019),  Truck Traffic: 37%,  Average Future Daily Traffic: 5,551 (year 2039),  Design Load: H 15,  Features Intersected: MARION DRAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.744,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $392,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $784,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7457A,  Location: 1.5 N JCT SR 22 (Lat: 46.382506,  Lng: -120.344361),  Route carried "on" structure: US 97,  Year Built: 1964,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 6,711 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 8,804 (year 2039),  Design Load: HS 20,  Features Intersected: WANITY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.212,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $622,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,243,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7457C,  Location: 3.1 N JCT SR 22 (Lat: 46.397111,  Lng: -120.369028),  Route carried "on" structure: US 97,  Year Built: 1965,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 13,422 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 17,609 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: LATERAL 3 IRR. CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 103.690,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 34 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,008,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 16207A,  Location: 23.6 N KLICKITAT CO (Lat: 46.309317,  Lng: -120.331817),  Route carried "on" structure: US 97,  Year Built: 2002,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 4,231 (year 2019),  Truck Traffic: 37%,  Average Future Daily Traffic: 5,551 (year 2039),  Design Load: HL 93,  Features Intersected: TOPPENISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.813,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $1,672,000,  Roadway Improvement Cost: $334,000,  Total Project Cost: $3,344,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8092,  Location: 00.13 E SR 97 (Lat: 46.360631,  Lng: -120.317411),  Route carried "on" structure: County highway 50400,  Year Built: 1973,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 1,035 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,300 (year 2039),  Design Load: HS 20,  Features Intersected: WANITY SLOUGH,  Facility Carried by Structure: LARUE RD.-IRRIG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 25.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83082,  Location: 00.26 NO CHAMBERS (Lat: 46.331667,  Lng: -120.271667),  Route carried "on" structure: County highway 74350,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 68 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 100 (year 2039),  Design Load: H 15,  Features Intersected: DRAIN,  Facility Carried by Structure: STEVENS RD. -IRRIG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Very good,  Operating Rating: 4.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,034,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83095,  Location: 00.34 W MEYERS ROAD (Lat: 46.338628,  Lng: -120.300944),  Route carried "on" structure: County highway 74600,  Year Built: 1967,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 250 (year 2040),  Design Load: HS 20,  Features Intersected: DRAIN,  Facility Carried by Structure: ROCKY FORD RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83338,  Location: 00.56 S CHAMBERS RD (Lat: 46.320000,  Lng: -120.261667),  Route carried "on" structure: County highway 74250,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 40 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 55 (year 2039),  Design Load: H 15,  Features Intersected: MARION DRAIN,  Facility Carried by Structure: SLAYTON RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Very good,  Operating Rating: 6.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $759,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,518,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83969,  Location: 00.01 N MARION DRN (Lat: 46.324361,  Lng: -120.346339),  Route carried "on" structure: County highway 50890,  Year Built: 1959,  Status: Posted for load-capacity,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 110 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 200 (year 2039),  Design Load: H 20,  Features Intersected: MARION DRAIN,  Facility Carried by Structure: ROBBINS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 6.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 4.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,602,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84051,  Location: 00.37 E OLDENWAY RD (Lat: 46.404244,  Lng: -120.367583),  Route carried "on" structure: County highway 50080,  Year Built: 1958,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 485 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 835 (year 2041),  Design Load: H 20,  Features Intersected: DRAIN,  Facility Carried by Structure: BRANCH ROAD EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $973,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84301,  Location: 00.09 S CHAMBERS RD (Lat: 46.333333,  Lng: -120.291667),  Route carried "on" structure: County highway 70390,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 16 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 20 (year 2039),  Design Load: H 15,  Features Intersected: WANITY SLOUGH,  Facility Carried by Structure: MEYERS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 15.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,520,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 88689,  Location: Intersection with Elmwood (Lat: 46.375289,  Lng: -120.333161),  Route carried "on" structure: County highway 50000,  Year Built: 2014,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,000 (year 2040),  Design Load: HL 93,  Features Intersected: Wanity Slough,  Facility Carried by Structure: Fort Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 26.2m (86.0ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Discuss Toppenish, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.