Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Triadelphia, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 180ft / 55.0mTotal length
  • $2,777,000Total costs
  • 87,021Total average daily traffic
  • 15,066Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Triadelphia
  • No street view available for this location

New bridges in Triadelphia, WV - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 31930-1939
  • 11950-1959
  • 41960-1969
  • 11990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Triadelphia, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 31980-1989
  • 11990-1999
Average Bridge Daily Traffic in Triadelphia, WV
Average Bridge Truck Traffic in Triadelphia, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
  • 20.0%Poor
  • 10.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Good
  • 18.2%Satisfactory
  • 27.3%Fair
  • 27.3%Poor
  • 9.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Good
  • 10.0%Satisfactory
  • 60.0%Fair
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 41.7%Good
  • 16.7%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 35A027,  Location: 0.06 mi. East jct US 40 (Lat: 40.048700,  Lng: -80.634261),  Route carried "on" structure: County highway 39,  Year Built: 1932,  Status: Posted for load,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 1,500 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,830 (year 2039),  Features Intersected: Little Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 2.4m (7.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $67,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A029,  Location: 0.52 mi. East jct CR23/2 (Lat: 40.031819,  Lng: -80.583200),  Route carried "on" structure: County highway 39,  Year Built: 1959,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 90 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 110 (year 2040),  Design Load: HS 20,  Features Intersected: Middle Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.276,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.8m (48.6ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $412,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $1,069,000 ( Estimate for 2020),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 35A039,  Location: 0.01 mi. East jct CR25 (Lat: 40.048669,  Lng: -80.642539),  Route carried "on" structure: US 40,  Year Built: 1934,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 7,700 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,394 (year 2040),  Features Intersected: Peters Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.279,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 35A04,  Location: 0.60 mi. East jct CR 8 (Lat: 40.057281,  Lng: -80.619181),  Route carried "on" structure: US 40,  Year Built: 1991,  Status: Open,  Structure Length: 3.04m (9.97ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,750 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Little Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.645,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $25,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A041,  Location: 0.43 mi. West jct CR40/3 (Lat: 40.063611,  Lng: -80.613711),  Route carried "on" structure: US 40,  Year Built: 1931,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,490 (year 2040),  Features Intersected: Little Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.514,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Superstructure: Poor,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $24,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $40,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 35A042,  Location: 0.02 mi. West jct CR 40/3 (Lat: 40.065039,  Lng: -80.606389),  Route carried "on" structure: US 40,  Year Built: 1922,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,490 (year 2040),  Features Intersected: Gashell Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.174,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $67,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A077,  Location: 1.42 Mi. East Jct. US 40 (Lat: 40.044689,  Lng: -80.630561),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 14.22m (46.65ft),  Average Daily Traffic: 19,350 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 28,832 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: Middle Creek & CR 39
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.847,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.20m (46.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $574,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A078,  Location: 1.42 mi. East jct US 40 (Lat: 40.044489,  Lng: -80.630550),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 12.63m (41.44ft),  Average Daily Traffic: 25,683 (year 2017),  Truck Traffic: 28%,  Average Future Daily Traffic: 41,093 (year 2037),  Design Load: HS 20,  Features Intersected: Middle Creek & CR39
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.847,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.62m (41.40ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $509,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $510,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A103,  Location: 0.01 mi. West jct CR39 (Lat: 40.047131,  Lng: -80.632981),  Route carried "on" structure: County highway 398,  Year Built: 1919,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.97m (6.46ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 61 (year 2040),  Features Intersected: Middle Wheeling Creek,  Facility Carried by Structure: County Route 39/8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $342,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A135,  Location: 0.21 mi. West jct CR 27 (Lat: 40.070931,  Lng: -80.600250),  Route carried "on" structure: US 40,  Year Built: 2000,  Status: Open,  Structure Length: 2.30m (7.55ft),  Average Daily Traffic: 3,923 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,296 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: Little Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.156,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.0m (72.2ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $83,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A139,  Location: 0.10 mi. West jct CR25 (Lat: 40.048200,  Lng: -80.643339),  Route carried "on" structure: US 40,  Year Built: 2005,  Status: Open,  Structure Length: 7.67m (25.16ft),  Average Daily Traffic: 11,900 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,518 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Little Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.102,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.9m (124.3ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35A144,  Location: 0.03 mi. West jct CR 23/2 (Lat: 40.037181,  Lng: -80.595489),  Route carried "on" structure: County highway 39,  Year Built: 2012,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 488 (year 2039),  Design Load: HL 93,  Features Intersected: Middle Wheeling Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.391,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35A077,  Location: 1.42 Mi. East Jct. US 40 (Lat: 40.044539,  Lng: -80.630569),  Route carried "under" structure: County highway 39,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 1,450 (year 0008),  Truck Traffic: 7%,  Features Intersected: Middle Creek & CR 39,  Facility Carried by Structure: Interstate 70
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 35A078,  Location: 1.42 mi. East jct US 40 (Lat: 40.044419,  Lng: -80.630419),  Route carried "under" structure: County highway 3900,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 975 (year 0015),  Truck Traffic: 7%,  Features Intersected: Middle Creek & CR39,  Facility Carried by Structure: Interstate 70
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 33.5m (109.9ft)

Discuss Triadelphia, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.