  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 344ft / 105mTotal length
  • $23,771,000Total costs
  • 36,790Total average daily traffic
  • 558Total average daily truck traffic
  • 55,185Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Trion
  • No street view available for this location

New bridges in Trion, GA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 11940-1949
  • 61950-1959
  • 11960-1969
  • 41970-1979
  • 41980-1989
  • 31990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Trion, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Trion, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 50.0%Good
  • 5.6%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
  • 5.6%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.8%Very good
  • 38.9%Good
  • 5.6%Satisfactory
  • 16.7%Fair
  • 5.6%Poor
  • 5.6%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Very good
  • 50.0%Good
  • 11.1%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 37.0%Very good
  • 33.3%Good
  • 7.4%Satisfactory
  • 22.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 55.6%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 55004,  Location: 0.3 MI W OF INT US 1 (Lat: 31.465011,  Lng: -82.447297),  Route carried "on" structure: County highway 118,  Year Built: 1955,  Status: Posted for load,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: BIG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $633,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 550006,  Location: 2.5 MI NE OF TRION (Lat: 34.569047,  Lng: -85.285528),  Route carried "on" structure: US 27,  Year Built: 1958,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 6,130 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,195 (year 2031),  Design Load: H 15,  Features Intersected: CHAPPEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 19 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000
Find on map >>   Show street view

Structure Number: 55002,  Location: 4 MI NW OF TRION (Lat: 34.584650,  Lng: -85.365219),  Route carried "on" structure: State highway 337,  Year Built: 1986,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 770 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,155 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $797,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 550022,  Location: 2 MI WEST OF TRION (Lat: 34.538847,  Lng: -85.349450),  Route carried "on" structure: County highway 2917,  Year Built: 1958,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,840 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,760 (year 2031),  Design Load: H 15,  Features Intersected: GREENWOOD BRANCH,  Facility Carried by Structure: TRION TELOGA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 550036,  Location: IN TRION (Lat: 34.544658,  Lng: -85.309789),  Route carried "on" structure: County highway 1358,  Year Built: 1926,  Year Reconstructed: 1961,  Status: Posted for load,  Structure Length: 9.94m (32.61ft),  Average Daily Traffic: 8,030 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,045 (year 2031),  Design Load: H 15,  Features Intersected: CHATTOOGA RIVER,  Facility Carried by Structure: CENTRAL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 16.37m (53.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,274,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,911,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 550037,  Location: IN NORTH TRION (Lat: 34.551708,  Lng: -85.304939),  Route carried "on" structure: City street 2,  Year Built: 1975,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 620 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 930 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CHAPPEL CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 550038,  Location: IN NORTH TRION (Lat: 34.560708,  Lng: -85.310789),  Route carried "on" structure: County highway 1358,  Year Built: 1982,  Status: Posted for load,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 930 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,395 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CANE CREEK,  Facility Carried by Structure: DRY VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,039,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,559,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 550039,  Location: IN EAST TRION (Lat: 34.546508,  Lng: -85.301608),  Route carried "on" structure: City street 2917,  Year Built: 1975,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,260 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,890 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CHAPPEL CREEK TRIB,  Facility Carried by Structure: FIRST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $182,000
Find on map >>   Show street view

Structure Number: 55004,  Location: IN EAST TRION (Lat: 34.546289,  Lng: -85.298719),  Route carried "on" structure: County highway 2917,  Year Built: 1964,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,260 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,890 (year 2031),  Design Load: H 15,  Features Intersected: CHAPPEL CREEK,  Facility Carried by Structure: FIRST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 555001,  Location: 2 MI N OF TRION (Lat: 34.570369,  Lng: -85.308769),  Route carried "on" structure: County highway 1,  Year Built: 1957,  Status: Posted for load,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 980 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,470 (year 2031),  Design Load: H 15,  Features Intersected: CANE CREEK,  Facility Carried by Structure: RIDGEWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 12.22m (40.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,114,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555028,  Location: 2 MI N OF TRION (Lat: 34.573028,  Lng: -85.310358),  Route carried "on" structure: County highway 93,  Year Built: 1993,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 360 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 540 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CANE CREEK TRIB,  Facility Carried by Structure: OLD JUSTICE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000
Find on map >>   Show street view

Structure Number: 55503,  Location: 3.5 MI NW OF TRION (Lat: 34.582258,  Lng: -85.351958),  Route carried "on" structure: County highway 94,  Year Built: 1958,  Status: Posted for load,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Features Intersected: CHATTOOGA RIVER,  Facility Carried by Structure: CENTER POST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 43.92m (144.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $473,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $709,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 555031,  Location: 1.9 MI NW OF TRION (Lat: 34.568878,  Lng: -85.330989),  Route carried "on" structure: County highway 94,  Year Built: 1949,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 340 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 510 (year 2031),  Features Intersected: CHATTOOGA RIVER TRIB,  Facility Carried by Structure: WELCOME HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 41.03m (134.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 555032,  Location: 2 MI NW OF TRION (Lat: 34.562197,  Lng: -85.335497),  Route carried "on" structure: County highway 95,  Year Built: 1980,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 580 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 870 (year 2031),  Design Load: HS 15,  Features Intersected: CHATTOOGA RIVER,  Facility Carried by Structure: TATE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,524,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 555038,  Location: 4 MI W OF TRION (Lat: 34.554819,  Lng: -85.376978),  Route carried "on" structure: County highway 117,  Year Built: 1980,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 310 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 465 (year 2031),  Design Load: HS 15,  Features Intersected: TELOGA CREEK,  Facility Carried by Structure: HARRISBURG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $891,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555041,  Location: 2.1 MI NE OF TRION (Lat: 34.570458,  Lng: -85.280378),  Route carried "on" structure: County highway 178,  Year Built: 1923,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2031),  Features Intersected: CHAPPEL CREEK,  Facility Carried by Structure: LONG BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 11.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $156,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555047,  Location: 2.7 MI SW OF TRION (Lat: 34.538519,  Lng: -85.349900),  Route carried "on" structure: County highway 263,  Year Built: 1954,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 900 (year 2031),  Features Intersected: GREENWOOD BRANCH,  Facility Carried by Structure: SADDLE CLUB ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Very good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 41.00m (134.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $147,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 555059,  Location: 2.5 MI SE OF TRION (Lat: 34.527358,  Lng: -85.279119),  Route carried "on" structure: County highway 324,  Year Built: 1932,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 230 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 345 (year 2031),  Features Intersected: SPRING CREEK,  Facility Carried by Structure: SPRING CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 42.06m (137.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $128,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555075,  Location: 2 MI NE OF TRION (Lat: 34.567739,  Lng: -85.286839),  Route carried "on" structure: County highway 1,  Year Built: 1996,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 970 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,455 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CHAPPEL CREEK,  Facility Carried by Structure: RIDGEWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 555076,  Location: 2 MI SOUTH OF TRION (Lat: 34.519589,  Lng: -85.301150),  Route carried "on" structure: County highway 170,  Year Built: 1998,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CHATTOOGA RIVER,  Facility Carried by Structure: PENN BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $1,407,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,110,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 555087,  Location: 3.8MI NW OF TRION (Lat: 34.581789,  Lng: -85.360219),  Route carried "on" structure: County highway 94,  Year Built: 2002,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 130 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 195 (year 2031),  Design Load: HS 15,  Features Intersected: SPRING CREEK,  Facility Carried by Structure: GILES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $346,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555089,  Location: 3.2 MI SW OF TRION (Lat: 34.538039,  Lng: -85.358450),  Route carried "on" structure: County highway 117,  Year Built: 2002,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: GREENWOOD BRANCH,  Facility Carried by Structure: MARTIN DAIRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $205,000
Find on map >>   Show street view

Structure Number: 555092,  Location: IN SOUTH EAST TRION (Lat: 34.539778,  Lng: -85.300489),  Route carried "on" structure: US 27,  Year Built: 2006,  Status: Open,  Structure Length: 22.80m (74.80ft),  Average Daily Traffic: 7,920 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,880 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CHATTOOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 26.4m (86.6ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,314,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $7,971,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555095,  Location: 2.1 MI NE OF TRION (Lat: 34.576231,  Lng: -85.285056),  Route carried "on" structure: County highway 177,  Year Built: 2010,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 15,  Features Intersected: CHAPPEL CREEK TRIB,  Facility Carried by Structure: GAYTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $182,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555096,  Location: 3 MI NE OF TRION (Lat: 34.567439,  Lng: -85.264708),  Route carried "on" structure: County highway 324,  Year Built: 2012,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 260 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 390 (year 2032),  Design Load: H 15,  Features Intersected: CHAPPEL CREEK,  Facility Carried by Structure: EAST HALLS VALLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 2955017,  Location: 7.3 MI S OF LAFAYETTE (Lat: 34.599358,  Lng: -85.288869),  Route carried "on" structure: County highway 62,  Year Built: 1977,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 80 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 120 (year 2031),  Features Intersected: CANE CREEK,  Facility Carried by Structure: OAKTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2955018,  Location: 6.9 MI S OF LAFAYETTE (Lat: 34.611047,  Lng: -85.327728),  Route carried "on" structure: County highway 65,  Year Built: 1975,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 360 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 540 (year 2031),  Features Intersected: CHATTOOGA CREEK,  Facility Carried by Structure: LONGHOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 43.28m (141.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $586,000,  Deck Structure Type: Concrete Cast-file-Place