Bridge Statistics for Tuskegee-Milstead, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 289ft / 87.7mTotal length
  • $23,958,000Total costs
  • 10,820Total average daily traffic
  • 1,906Total average daily truck traffic
  • 12,840Total future (year 2021) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tuskegee-Milstead
  • No street view available for this location

New bridges in Tuskegee-Milstead, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11940-1949
  • 61950-1959
  • 101960-1969
  • 11970-1979
  • 21980-1989
  • 41990-1999
  • 12000-2009
Average Bridge Truck Traffic in Tuskegee-Milstead, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Very good
  • 27.8%Good
  • 61.1%Satisfactory
  • 5.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Very good
  • 22.2%Good
  • 27.8%Satisfactory
  • 11.1%Fair
  • 22.2%Poor
  • 5.6%Serious
  • 5.6%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.4%Very good
  • 7.4%Good
  • 51.9%Satisfactory
  • 29.6%Fair
  • 3.7%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Satisfactory
  • 33.3%Fair
  • 22.2%Poor
Find on map >>   Show street view

Structure Number: 534,  Location: SE1/4 S18 T16 R23 (Lat: 32.363617,  Lng: -85.784650),  Route carried "on" structure: County highway 73,  Year Built: 1928,  Status: Closed,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 100 (year 1990),  Average Future Daily Traffic: 100 (year 2021),  Design Load: H 10,  Features Intersected: CALEBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: Febuary 2003,  Other Special Inspection Date: September 2004,  Bridge Improvement Cost: $279,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $307,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 63,  Location: 4.0 MI W OF FAYETTE (Lat: 33.726250,  Lng: -87.887400),  Route carried "on" structure: State highway 18,  Year Built: 1929,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,220 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,709 (year 2040),  Design Load: H 15,  Features Intersected: Branch of Luxapillia
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.190,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 87.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $355,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 809,  Location: 1.5 MILES NORTH CR22 (Lat: 32.428286,  Lng: -85.607381),  Route carried "on" structure: County highway 63,  Year Built: 1992,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 200 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 250 (year 2035),  Design Load: HS 20,  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $517,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2404,  Location: 3.1 MI E.OF SR8/US80E (Lat: 32.357147,  Lng: -85.752333),  Route carried "on" structure: County highway 67,  Year Built: 1940,  Status: Closed,  Structure Length: 2.09m (6.86ft),  Average Daily Traffic: 31 (year 1990),  Average Future Daily Traffic: 31 (year 2035),  Design Load: H 10,  Features Intersected: CALEBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Critical,  Channel: Fair,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: March 2016,  Other Special Inspection Date: March 2016,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $303,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3824,  Location: .77 MILES N. CO RD 26 (Lat: 32.400794,  Lng: -85.554614),  Route carried "on" structure: County highway 71,  Year Built: 1991,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 75 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 80 (year 2035),  Design Load: HS 20,  Features Intersected: CHEWACLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $515,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 4076,  Location: 1.5 MI. NORTH OF SR 8 (Lat: 32.463481,  Lng: -85.657872),  Route carried "on" structure: County highway 53,  Year Built: 1951,  Status: Posted for load,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 450 (year 2036),  Design Load: H 15,  Features Intersected: CHEWACLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $862,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5181,  Location: 0.3 MI WEST SR49 (Lat: 32.469167,  Lng: -85.812531),  Route carried "on" structure: County highway 17,  Year Built: 1992,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 220 (year 2015),  Truck Traffic: 20%,  Average Future Daily Traffic: 300 (year 2035),  Design Load: HS 20,  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 5957,  Location: 6.4 MI. W. OF CO RD 8 (Lat: 32.490269,  Lng: -85.815050),  Route carried "on" structure: County highway 56,  Year Built: 1957,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 587 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 700 (year 2036),  Design Load: H 15,  Features Intersected: GLEEDEN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 19.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $504,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 5975,  Location: 2.2 Miles West CO RD 45 (Lat: 32.348017,  Lng: -85.732594),  Route carried "on" structure: County highway 67,  Year Built: 1957,  Status: Closed,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 35 (year 2015),  Average Future Daily Traffic: 35 (year 2035),  Design Load: H 10,  Features Intersected: CALEBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: January 2015,  Other Special Inspection Date: December 2015,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $303,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 6299,  Location: W1/2 S36 T16 R23 (Lat: 32.330181,  Lng: -85.693347),  Route carried "on" structure: County highway 45,  Year Built: 1958,  Status: Closed,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 160 (year 1990),  Truck Traffic: 20%,  Average Future Daily Traffic: 180 (year 2021),  Design Load: H 15,  Features Intersected: CALEBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Fair,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 12.45m (40.85ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: Febuary 2003,  Other Special Inspection Date: September 2004,  Bridge Improvement Cost: $1,963,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,159,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 63,  Location: NE1/4 S36 T16 R23 (Lat: 32.332039,  Lng: -85.693331),  Route carried "on" structure: County highway 45,  Year Built: 1958,  Status: Closed,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 160 (year 1990),  Truck Traffic: 20%,  Average Future Daily Traffic: 180 (year 2021),  Design Load: H 15,  Features Intersected: CALEBEE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: Febuary 2003,  Other Special Inspection Date: June 2004,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $424,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 6638,  Location: 0.5 Miles E. HWY49S/CR27 (Lat: 32.489589,  Lng: -85.789331),  Route carried "on" structure: County highway 56,  Year Built: 1959,  Status: Posted for load,  Structure Length: 4.65m (15.26ft),  Average Daily Traffic: 587 (year 2016),  Truck Traffic: 40%,  Average Future Daily Traffic: 600 (year 2036),  Design Load: H 15,  Features Intersected: WAUXAMAKA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.65m (18.54ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $891,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $980,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7384,  Location: 4.9 MI SOUTHWEST SR8 (Lat: 32.414600,  Lng: -85.628922),  Route carried "on" structure: County highway 26,  Year Built: 1961,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 535 (year 2015),  Truck Traffic: 25%,  Average Future Daily Traffic: 700 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $272,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7385,  Location: 4.9 MI EAST MLK HWY (Lat: 32.412389,  Lng: -85.616456),  Route carried "on" structure: County highway 26,  Year Built: 1961,  Status: Posted for load,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 535 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 600 (year 2036),  Design Load: H 15,  Features Intersected: OPINTLOCCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 11.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 10.16m (33.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,603,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,763,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 7386,  Location: 4.8 MI EAST OF MLK HWY (Lat: 32.412086,  Lng: -85.615142),  Route carried "on" structure: County highway 26,  Year Built: 1961,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 535 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 590 (year 2036),  Design Load: H 15,  Features Intersected: OPINTLOCCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $422,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 7387,  Location: 4.7 MI EAST W-MLK HWY (Lat: 32.411222,  Lng: -85.611583),  Route carried "on" structure: County highway 26,  Year Built: 1961,  Status: Posted for load,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 536 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 590 (year 2036),  Design Load: H 15,  Features Intersected: OPINTLOCCO CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,081,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 7685,  Location: 6.6 MI. WEST-WMLK HWY (Lat: 32.412750,  Lng: -85.586617),  Route carried "on" structure: County highway 22,  Year Built: 1962,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 325 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 350 (year 2036),  Design Load: H 15,  Features Intersected: CAMPGROUND BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $688,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8263,  Location: 2.3 MI EAST OF SR229 (Lat: 32.447053,  Lng: -85.869517),  Route carried "on" structure: County highway 9,  Year Built: 1964,  Status: Posted for load,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 268 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 320 (year 2036),  Design Load: H 15,  Features Intersected: WALKER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 16.7m (54.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.75m (18.86ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,861,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,047,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 8307,  Location: 0.9 MI. N, US80N/SR8 (Lat: 32.394781,  Lng: -85.829467),  Route carried "on" structure: County highway 29,  Year Built: 1964,  Status: Posted for load,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 160 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 175 (year 2036),  Design Load: H 15,  Features Intersected: HOG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Serious,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $627,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $690,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 9384,  Location: 0.4 MI. NO. US80W/SR8 (Lat: 32.408189,  Lng: -85.734081),  Route carried "on" structure: County highway 51,  Year Built: 1967,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 600 (year 2015),  Truck Traffic: 20%,  Average Future Daily Traffic: 800 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,410,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $1,551,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9385,  Location: 1.0 MILE NO. HWY80W/SR8 (Lat: 32.413186,  Lng: -85.742947),  Route carried "on" structure: County highway 51,  Year Built: 1967,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 600 (year 2015),  Truck Traffic: 20%,  Average Future Daily Traffic: 800 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,177,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,295,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9386,  Location: 3 Miles South I-85 (Lat: 32.419847,  Lng: -85.754606),  Route carried "on" structure: County highway 51,  Year Built: 1967,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 600 (year 2015),  Truck Traffic: 20%,  Average Future Daily Traffic: 700 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $731,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $804,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10977,  Location: 0.14 MI SO WIRE RD (Lat: 32.451408,  Lng: -85.654453),  Route carried "on" structure: County highway 53,  Year Built: 1973,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 25%,  Average Future Daily Traffic: 450 (year 2036),  Design Load: H 15,  Features Intersected: UPHAPEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,106,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12407,  Location: 0.43 MI NO HWY80W/SR8 (Lat: 32.389833,  Lng: -85.766075),  Route carried "on" structure: County highway 81,  Year Built: 1980,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 110 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 125 (year 2035),  Design Load: H 15,  Features Intersected: LITTLE CALEBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $694,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13943,  Location: 2.5 MILES SO. SR 56 (Lat: 32.475900,  Lng: -85.780892),  Route carried "on" structure: County highway 36,  Year Built: 1986,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 385 (year 2015),  Truck Traffic: 20%,  Average Future Daily Traffic: 500 (year 2035),  Design Load: HS 20,  Features Intersected: COOPER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $556,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19295,  Location: S1/2 S36 T17 R24 (Lat: 32.415828,  Lng: -85.599394),  Route carried "on" structure: County highway 63,  Year Built: 1991,  Status: Closed,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 115 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2030),  Design Load: HS 20,  Features Intersected: CHEWACLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $652,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $717,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19574,  Location: 0.14 MI NO OF CO RD 67 (Lat: 32.357597,  Lng: -85.700219),  Route carried "on" structure: County highway 45,  Year Built: 2006,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 341 (year 2016),  Average Future Daily Traffic: 375 (year 2036),  Design Load: HS 20,  Features Intersected: PERSIMMON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,959,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,155,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels