Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Uriah, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 92ft / 27.8mTotal length
  • $7,893,000Total costs
  • 2,591Total average daily traffic
  • 754Total average daily truck traffic
  • 3,737Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Uriah
  • No street view available for this location

New bridges in Uriah, AL - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 31950-1959
  • 21960-1969
  • 31970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Truck Traffic in Uriah, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Very good
  • 14.3%Good
  • 57.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 61.5%Good
  • 23.1%Satisfactory
  • 15.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 2639,  Location: .07 MI. S.JAYS COTTON HS. (Lat: 31.328967,  Lng: -87.604550),  Route carried "on" structure: County highway 3,  Year Built: 1942,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 70 (year 1993),  Average Future Daily Traffic: 125 (year 2030),  Features Intersected: BRANCH,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $187,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5424,  Location: 2.5 MI.N.E. ROCKY HILL (Lat: 31.411486,  Lng: -87.591031),  Route carried "on" structure: County highway 4,  Year Built: 1956,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 75 (year 1990),  Average Future Daily Traffic: 125 (year 2033),  Features Intersected: BRANCH,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 31.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $254,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5438,  Location: .05 MI. S.E. ELISKA (Lat: 31.379067,  Lng: -87.655042),  Route carried "on" structure: County highway 1,  Year Built: 1956,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 36 (year 1993),  Average Future Daily Traffic: 72 (year 2033),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $166,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $183,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5449,  Location: .03 MI. N.W. URIAH (Lat: 32.258333,  Lng: -87.480000),  Route carried "on" structure: County highway 1,  Year Built: 1956,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 300 (year 1993),  Truck Traffic: 15%,  Average Future Daily Traffic: 350 (year 2033),  Design Load: HS 20,  Features Intersected: BUTTER FORK BRANCH,  Facility Carried by Structure: COUNTY ROUTE 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $341,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7301,  Location: 4 MI. S.E. ELISKA (Lat: 31.309042,  Lng: -87.665308),  Route carried "on" structure: County highway 3,  Year Built: 1961,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 235 (year 1993),  Truck Traffic: 25%,  Average Future Daily Traffic: 300 (year 2033),  Design Load: HS 15,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: COUNTY ROUTE 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $515,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9312,  Location: 3.5 MI. S.E. ELISKA (Lat: 31.318647,  Lng: -87.670931),  Route carried "on" structure: County highway 1,  Year Built: 1967,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 235 (year 1993),  Truck Traffic: 25%,  Average Future Daily Traffic: 300 (year 2030),  Design Load: HS 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $411,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $452,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10534,  Location: 3.5 MI. N. ELISKA (Lat: 31.366906,  Lng: -87.627619),  Route carried "on" structure: County highway 1,  Year Built: 1971,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 375 (year 1993),  Truck Traffic: 40%,  Average Future Daily Traffic: 500 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,053,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,158,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10535,  Location: 5 MI. N. ELISKA (Lat: 31.370519,  Lng: -87.592492),  Route carried "on" structure: County highway 1,  Year Built: 1971,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 375 (year 1993),  Truck Traffic: 50%,  Average Future Daily Traffic: 600 (year 2033),  Design Load: H 20,  Features Intersected: BAILEYS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $652,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11372,  Location: 4 MI. S.E. GOODWAY (Lat: 31.311186,  Lng: -87.374844),  Route carried "on" structure: County highway 1,  Year Built: 1975,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 30 (year 1993),  Truck Traffic: 5%,  Average Future Daily Traffic: 40 (year 2033),  Features Intersected: BRANCH,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 25.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $218,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 12269,  Location: 1.5 MI. W. JAMES BROOKS (Lat: 31.314919,  Lng: -87.448667),  Route carried "on" structure: County highway 4,  Year Built: 1948,  Year Reconstructed: 1993,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 85 (year 1993),  Average Future Daily Traffic: 150 (year 2029),  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 31.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $329,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 13638,  Location: .05 MI. N. PETERMAN (Lat: 31.592764,  Lng: -87.256786),  Route carried "on" structure: County highway 30,  Year Built: 1985,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 250 (year 1993),  Truck Traffic: 30%,  Average Future Daily Traffic: 500 (year 2033),  Design Load: HS 20,  Features Intersected: ROILEY CREEK,  Facility Carried by Structure: COUNTY ROAD NO. 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 83.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $473,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13873,  Location: 1 MI. N. ROCKY HILL (Lat: 31.397589,  Lng: -87.556869),  Route carried "on" structure: County highway 1,  Year Built: 1986,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 375 (year 1993),  Truck Traffic: 40%,  Average Future Daily Traffic: 450 (year 2033),  Design Load: HS 20,  Features Intersected: JAYE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $724,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15133,  Location: 3 MI. SE GOODWAY (Lat: 31.311814,  Lng: -87.373736),  Route carried "on" structure: County highway 4,  Year Built: 1990,  Status: Open,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 150 (year 1993),  Truck Traffic: 20%,  Average Future Daily Traffic: 225 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: CO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.27m (40.26ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: December 2021,  Bridge Improvement Cost: $2,188,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $2,407,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Uriah, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.