Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Virgil, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 141ft / 43.4mTotal length
  • $16,367,000Total costs
  • 27,735Total average daily traffic
  • 5,646Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Virgil
  • No street view available for this location

New bridges in Virgil, NY - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 61960-1969
  • 31970-1979
  • 11980-1989
  • 31990-1999
  • 22000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Virgil, NY
Average Bridge Truck Traffic in Virgil, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 27.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Very good
  • 9.1%Good
  • 27.3%Satisfactory
  • 18.2%Fair
  • 18.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 18.2%Very good
  • 18.2%Good
  • 18.2%Satisfactory
  • 36.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 23.5%Good
  • 23.5%Satisfactory
  • 29.4%Fair
  • 17.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Excellent
  • 16.7%Very good
  • 33.3%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 1031321,  Location: 3.4 MI N JCT I81 & SH 221 (Lat: 42.485706,  Lng: -76.065067),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 9,861 (year 2009),  Truck Traffic: 30%,  Design Load: HS 20,  Features Intersected: RUSSELL ROAD, TIOUGHNIOG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.590,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,467,000,  Roadway Improvement Cost: $859,000,  Total Project Cost: $2,326,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031322,  Location: 3.4 MI N JCT I81 & SH 221 (Lat: 42.486308,  Lng: -76.064769),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 7,486 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 8,391 (year 2040),  Design Load: HS 20,  Features Intersected: RUSSELL ROAD, TIOUGHNIOG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.590,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Very good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,852,000,  Roadway Improvement Cost: $1,085,000,  Total Project Cost: $2,937,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 103435,  Location: 1.6 MI W JCT RTS 90 & 11 (Lat: 42.490783,  Lng: -76.098136),  Route carried "on" structure: State highway 392,  Year Built: 1996,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 1,240 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,733 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GRIDLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.060,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $808,000,  Roadway Improvement Cost: $473,000,  Total Project Cost: $1,281,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103436,  Location: 2.0 MI W JCT RTS 90 + 11 (Lat: 42.493581,  Lng: -76.103203),  Route carried "on" structure: State highway 392,  Year Built: 2005,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,240 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,733 (year 2040),  Design Load: HL 93,  Features Intersected: GRIDLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.545,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.2m (66.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 97.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $404,000,  Total Project Cost: $1,093,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103437,  Location: 2.3 MI E OF VIRGIL - SH 9 (Lat: 42.510628,  Lng: -76.151175),  Route carried "on" structure: State highway 392,  Year Built: 2015,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,240 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,733 (year 2040),  Design Load: HL 93,  Features Intersected: EXT GRIDLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.557,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Fair,  Culverts: Excellent,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $372,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $590,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103438,  Location: 0.1 MI E OF VIRGIL RTE90 (Lat: 42.510636,  Lng: -76.192481),  Route carried "on" structure: State highway 392,  Year Built: 2005,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,240 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,733 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: VIRGIL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.420,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $779,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109375,  Location: 0.4 MI N VIRGIL ON RTE 90 (Lat: 42.515603,  Lng: -76.195597),  Route carried "on" structure: State highway 215,  Year Built: 1970,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,371 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,919 (year 2040),  Design Load: HS 20,  Features Intersected: VIRGIL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $393,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 22076,  Location: 0.5 MI S OF VIRGIL (Lat: 42.503736,  Lng: -76.196283),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 20 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 28 (year 2038),  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: TIMMERMAN HILL ROA
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 220763,  Location: 3.7 MILES EAST OF VIRGIL (Lat: 42.501447,  Lng: -76.127411),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 6 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 8 (year 2037),  Features Intersected: GRIDLEY CREEK,  Facility Carried by Structure: TONE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $264,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220766,  Location: 0.2 MI SE OF MESSENGERVIL (Lat: 42.488678,  Lng: -76.073544),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 24 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 34 (year 2039),  Design Load: HS 20,  Features Intersected: GRIDLEY CREEK,  Facility Carried by Structure: FRANCIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $380,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 320762,  Location: 3.8 MILES SW OF VIRGIL (Lat: 42.479450,  Lng: -76.238889),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 115 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 161 (year 2039),  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: VIRGIL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $757,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 320765,  Location: 1.4 MI W JCT SH392 & US11 (Lat: 42.489239,  Lng: -76.089342),  Route carried "on" structure: Other road ,  Year Built: 1971,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 147 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 206 (year 2037),  Features Intersected: GRIDLEY CREEK,  Facility Carried by Structure: MUCKEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $321,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33119,  Location: 0.8 MI SW OF VIRGIL (Lat: 42.501619,  Lng: -76.203533),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 441 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 617 (year 2037),  Design Load: HS 20,  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: OWEGO HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.464,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $763,000,  Roadway Improvement Cost: $447,000,  Total Project Cost: $1,210,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331191,  Location: 1.4 MI SW JCT SH392 &SH90 (Lat: 42.501258,  Lng: -76.213419),  Route carried "on" structure: State highway 392,  Year Built: 1950,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,092 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,526 (year 2040),  Features Intersected: VIRGIL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.151,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $379,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $601,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331192,  Location: 2.5 MILES SW OF VIRGIL (Lat: 42.490103,  Lng: -76.223167),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 164 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 230 (year 2038),  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: W MEETNG HOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $379,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331253,  Location: JCT OF RTS 392 & 11 (Lat: 42.490917,  Lng: -76.074658),  Route carried "on" structure: State highway 392,  Year Built: 1995,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 1,240 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,733 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.490,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,516,000,  Roadway Improvement Cost: $888,000,  Total Project Cost: $2,404,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 337055,  Location: .1 mi N SH 392 (Lat: 42.536467,  Lng: -76.162789),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 808 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,129 (year 2040),  Features Intersected: GRIDLEY CREEK,  Facility Carried by Structure: CR122
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $411,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $652,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1031321,  Location: 3.4 MI N JCT I81 & SH 221 (Lat: 42.485706,  Lng: -76.065067),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Features Intersected: RUSSELL ROAD, TIOUGHNIOG,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 10.99m (36.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.8m (97.8ft)

Find on map >>   Show street view

Structure Number: 1031322,  Location: 3.4 MI N JCT I81 & SH 221 (Lat: 42.486308,  Lng: -76.064769),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Features Intersected: RUSSELL ROAD, TIOUGHNIOG,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 16.99m (55.74ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.8m (97.8ft)

Discuss Virgil, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.