Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Volney, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 69ft / 21.4mTotal length
  • $13,971,000Total costs
  • 41,349Total average daily traffic
  • 1,504Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Volney
  • No street view available for this location

New bridges in Volney, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 31920-1929
  • 41970-1979
  • 31990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Volney, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Volney, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 28.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Excellent
  • 28.6%Good
  • 28.6%Satisfactory
  • 28.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 33.3%Satisfactory
  • 33.3%Fair
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 102744,  Location: 2 MI N JCT RT 57 & FULTON (Lat: 43.364539,  Lng: -76.429717),  Route carried "on" structure: State highway 481,  Year Built: 1994,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 7,674 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,710 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.411,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,727,000,  Roadway Improvement Cost: $1,011,000,  Total Project Cost: $2,738,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103933,  Location: 6.2 MI NORTH OF FULTON (Lat: 43.405306,  Lng: -76.400878),  Route carried "on" structure: County highway ,  Year Built: 1929,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,314 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,840 (year 2040),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: WHITAKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.319,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $633,000,  Roadway Improvement Cost: $371,000,  Total Project Cost: $1,004,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106474,  Location: 3.9 MI NW JCT RTS 481+264 (Lat: 43.298086,  Lng: -76.350372),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 277 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 388 (year 2039),  Design Load: H 20,  Features Intersected: 481 481 34021075, RTE 48,  Facility Carried by Structure: OWEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,681,000,  Roadway Improvement Cost: $985,000,  Total Project Cost: $2,666,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1064751,  Location: .2 MI E JCT SH481 & CR57 (Lat: 43.306300,  Lng: -76.382033),  Route carried "on" structure: State highway 481,  Year Built: 1970,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 4,664 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,812 (year 2040),  Design Load: H 20,  Features Intersected: CSX TRANSPRTATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.851,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,625,000,  Roadway Improvement Cost: $952,000,  Total Project Cost: $2,577,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1064752,  Location: .2 MI E JCT SH481 & CR57 (Lat: 43.306489,  Lng: -76.382222),  Route carried "on" structure: State highway 481,  Year Built: 1970,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 4,664 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,812 (year 2040),  Design Load: H 20,  Features Intersected: CSX TRANSPRTATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.851,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,625,000,  Roadway Improvement Cost: $952,000,  Total Project Cost: $2,577,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 320934,  Location: 4.0 MI E OF MINETTO (Lat: 43.406081,  Lng: -76.407553),  Route carried "on" structure: Other road ,  Year Built: 2013,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 215 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 301 (year 2038),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $511,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331334,  Location: 3.7 MI N OF FULTON (Lat: 43.368847,  Lng: -76.426181),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,097 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,357 (year 2040),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: COUNTY ROAD 57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.572,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $630,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331357,  Location: 2.5 MI E OF MINETTO (Lat: 43.401928,  Lng: -76.429656),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 296 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 414 (year 2037),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: SUCKERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.492,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $303,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33668,  Location: 6.5 MILES SW OF MEXICO (Lat: 43.423294,  Lng: -76.361456),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,761 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,465 (year 2037),  Features Intersected: SWAMP CREEK,  Facility Carried by Structure: COUNTY ROAD 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.944,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $609,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $965,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106474,  Location: 3.9 MI NW JCT RTS 481+264 (Lat: 43.298086,  Lng: -76.350372),  Route carried "under" structure: State highway 481,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 14,887 (year 2002),  Features Intersected: 481 481 34021075, RTE 48,  Facility Carried by Structure: OWEN ROAD
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 12.068,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 700031,  Location: .6 MI NE JCT SH 3 & CR 9 (Lat: 43.330322,  Lng: -76.399500),  Route carried "under" structure: State highway 3,  Year Built: 1928,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 1972),  Features Intersected: RTE 3,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.161,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.0m (55.8ft)

Find on map >>   Show street view

Structure Number: 703932,  Location: 1.1 MI NE BARGE CNL & SH3 (Lat: 43.333014,  Lng: -76.403814),  Route carried "under" structure: County highway ,  Year Built: 1928,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 1972),  Features Intersected: COUNTY ROAD 176,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 770229,  Location: 1.0 MI E OF FULTON (Lat: 43.326206,  Lng: -76.394097),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2021),  Features Intersected: EMERY STREET-CR 9,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 3.93m (12.89ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.2m (59.7ft)

Discuss Volney, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.