Bridge Statistics for Waddington, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 105ft / 31.9mTotal length
  • $14,161,000Total costs
  • 12,479Total average daily traffic
  • 1,844Total average daily truck traffic
  • 14,009Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Waddington
  • No street view available for this location

New bridges in Waddington, NY - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 41950-1959
  • 31960-1969
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Waddington, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 22010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Excellent
  • 8.3%Very good
  • 41.7%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Excellent
  • 41.7%Good
  • 8.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Excellent
  • 8.3%Very good
  • 58.3%Good
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Excellent
  • 23.1%Very good
  • 38.5%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 102386,  Location: 0.3 MI NE JCT 37 + 345 (Lat: 44.867297,  Lng: -75.192286),  Route carried "on" structure: State highway 37,  Year Built: 1957,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 2,754 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 2,780 (year 2040),  Design Load: H 20,  Features Intersected: BIG SUCKER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 76.492,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $1,285,000,  Roadway Improvement Cost: $752,000,  Total Project Cost: $2,037,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102387,  Location: 1.8 MI NE JCT SH37 &SH345 (Lat: 44.873069,  Lng: -75.162408),  Route carried "on" structure: State highway 37,  Year Built: 1957,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 9.72m (31.89ft),  Average Daily Traffic: 2,754 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 2,780 (year 2040),  Design Load: HS 20,  Features Intersected: BRANDY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.195,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.72m (31.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $2,923,000,  Roadway Improvement Cost: $1,711,000,  Total Project Cost: $4,634,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104622,  Location: 1.6 MI SE JCT SH345 &SH37 (Lat: 44.841011,  Lng: -75.190875),  Route carried "on" structure: State highway 345,  Year Built: 1935,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,221 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,273 (year 2040),  Design Load: H 20,  Features Intersected: LITTLE SUCKER BRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.098,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $553,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104623,  Location: 0.4 MI SE JCT RTS 345+ 37 (Lat: 44.856733,  Lng: -75.198594),  Route carried "on" structure: State highway 345,  Year Built: 2008,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 1,221 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,273 (year 2040),  Design Load: HL 93,  Features Intersected: BIG SUCKER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.948,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.0m (124.7ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $922,000,  Roadway Improvement Cost: $540,000,  Total Project Cost: $1,462,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109472,  Location: 3.4 MI SE JCT RTS 345+ 37 (Lat: 44.805336,  Lng: -75.169714),  Route carried "on" structure: State highway 345,  Year Built: 1961,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,221 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,273 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BRANDY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.770,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.7m (18.7ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $414,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 322185,  Location: 3.0 MI NE OF CHIPMAN (Lat: 44.812569,  Lng: -75.163336),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 42 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 59 (year 2038),  Design Load: HL 93,  Features Intersected: BRANDY BROOK,  Facility Carried by Structure: WAYNE HUNTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $265,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334201,  Location: 3.0 MI N OF CHIPMAN (Lat: 44.823658,  Lng: -75.207083),  Route carried "on" structure: County highway ,  Year Built: 1931,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 231 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 323 (year 2038),  Features Intersected: LITTLE SUCKER BRK,  Facility Carried by Structure: CR 33, Chip-Wadd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.875,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $558,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334202,  Location: .75 MI SE OF WADDINGTON (Lat: 44.854219,  Lng: -75.176506),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 698 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 977 (year 2037),  Features Intersected: LITT SUCKER BROOK,  Facility Carried by Structure: CR44 NRFK-WADD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.596,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $665,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334203,  Location: 2.5 MI SE OF WADDINGTON (Lat: 44.849561,  Lng: -75.164256),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 698 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 977 (year 2037),  Features Intersected: BRANDY BROOK,  Facility Carried by Structure: NORFOLK-WADDNG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.502,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $598,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334205,  Location: 3.5 MI NE OF PINE GROVE (Lat: 44.811497,  Lng: -75.253550),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 178 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 249 (year 2038),  Features Intersected: BIG SUCKER BROOK,  Facility Carried by Structure: COUNTY ROAD 31A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.055,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $205,000,  Total Project Cost: $554,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334207,  Location: 3.0 MI SW OF WADDINGTON (Lat: 44.837725,  Lng: -75.222303),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 271 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 379 (year 2038),  Features Intersected: BIG SUCKER BROOK,  Facility Carried by Structure: BUCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $533,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334208,  Location: 5.0 MI SE OF WADDINGTON. (Lat: 44.828394,  Lng: -75.158775),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 88 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 123 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BRANDY BROOK,  Facility Carried by Structure: HALFWAY HOUSE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.767,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $337,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $534,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334209,  Location: LOCATED IN WADDINGTON (Lat: 44.860356,  Lng: -75.192053),  Route carried "on" structure: County highway ,  Year Built: 1956,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 1,102 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,543 (year 2037),  Features Intersected: BIG SUCKER BROOK,  Facility Carried by Structure: CR 44, FRANKLIN R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 84.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.35m (14.27ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $854,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,354,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing