Bridge Statistics for Walden, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 98ft / 29.6mTotal length
  • $34,876,000Total costs
  • 49,361Total average daily traffic
  • 2,916Total average daily truck traffic
  • 58,544Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Walden
  • No street view available for this location

New bridges in Walden, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 11940-1949
  • 11950-1959
  • 11980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Walden, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Walden, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 30.0%Good
  • 30.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Good
  • 50.0%Satisfactory
  • 10.0%Fair
  • 20.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Good
  • 50.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Very good
  • 11.1%Good
  • 55.6%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Find on map >>   Show street view

Structure Number: 101451,  Location: .9 MI E JCT SH17K & SH208 (Lat: 41.524592,  Lng: -74.182772),  Route carried "on" structure: State highway 17K,  Year Built: 1935,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 7,182 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,215 (year 2040),  Features Intersected: EX-NEW HAV RR ROW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.898,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 86.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 66.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,049,000,  Roadway Improvement Cost: $1,200,000,  Total Project Cost: $3,248,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102668,  Location: IN WALDEN (Lat: 41.561308,  Lng: -74.194289),  Route carried "on" structure: State highway 52,  Year Built: 2004,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 5,046 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,129 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WALLKILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.665,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.85m (22.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $9,276,000,  Roadway Improvement Cost: $5,432,000,  Total Project Cost: $14,709,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10267,  Location: .2 MI E JCT RTS 52 & 208 (Lat: 41.561036,  Lng: -74.183269),  Route carried "on" structure: State highway 52,  Year Built: 1993,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 6,719 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,162 (year 2040),  Design Load: HS 20,  Features Intersected: TIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.647,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $772,000,  Roadway Improvement Cost: $452,000,  Total Project Cost: $1,224,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 102671,  Location: 0.4 MI E JCT RTS 52+208 (Lat: 41.562206,  Lng: -74.180956),  Route carried "on" structure: State highway 52,  Year Built: 1931,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 6,719 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,162 (year 2040),  Features Intersected: TIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.872,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $590,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $936,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102673,  Location: 1.6 MI E JCT SH 52 & SH 2 (Lat: 41.558631,  Lng: -74.158067),  Route carried "on" structure: State highway 52,  Year Built: 1994,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 6,719 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,162 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.915,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $561,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $890,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104061,  Location: 2.1 MI N JCT SH208 &SH17K (Lat: 41.552531,  Lng: -74.188783),  Route carried "on" structure: State highway 208,  Year Built: 1950,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 9,543 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,592 (year 2040),  Design Load: H 20,  Features Intersected: MIDDLETOWN & NJ R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.314,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $2,789,000,  Roadway Improvement Cost: $1,633,000,  Total Project Cost: $4,422,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 104062,  Location: .9 MI N JCT RT 208 & 52 (Lat: 41.573242,  Lng: -74.183569),  Route carried "on" structure: State highway 208,  Year Built: 1994,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 4,330 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,260 (year 2040),  Design Load: HS 20,  Features Intersected: TIN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.791,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $674,000,  Roadway Improvement Cost: $395,000,  Total Project Cost: $1,068,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222325,  Location: 0.5 mi So Rt 52 (Lat: 41.549681,  Lng: -74.151361),  Route carried "on" structure: Other road ,  Year Built: 2013,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 147 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 206 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: Tin Brook,  Facility Carried by Structure: Harts Lane
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.77m (2.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $315,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 226208,  Location: AT WALDEN (Lat: 41.560164,  Lng: -74.183206),  Route carried "on" structure: Other road ,  Year Built: 1928,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 3 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 4 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: TIN BROOK,  Facility Carried by Structure: HILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $382,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 22621,  Location: AT WALDEN (Lat: 41.561119,  Lng: -74.184186),  Route carried "on" structure: Other road ,  Year Built: 1945,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 522 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 645 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TIN BROOK,  Facility Carried by Structure: HIGHLAND AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $631,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334489,  Location: EAST OF RT 52 AT WALDEN (Lat: 41.563761,  Lng: -74.193339),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 10.58m (34.71ft),  Average Daily Traffic: 2,431 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,007 (year 2040),  Design Load: HS 20,  Features Intersected: WALLKILL RIVER,  Facility Carried by Structure: OAK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 52.7m (172.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.57m (34.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,447,000,  Roadway Improvement Cost: $2,604,000,  Total Project Cost: $7,051,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing