Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Walton, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 138ft / 41.7mTotal length
  • $21,644,000Total costs
  • 24,568Total average daily traffic
  • 2,044Total average daily truck traffic
  • 26,298Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Walton
  • No street view available for this location

New bridges in Walton, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 31950-1959
  • 21960-1969
  • 11970-1979
  • 11980-1989
  • 81990-1999
  • 32000-2009
  • 22020-2022
Reconstructed bridges in Walton, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Walton, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.5%Excellent
  • 31.6%Very good
  • 21.1%Good
  • 26.3%Satisfactory
  • 10.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.8%Excellent
  • 26.3%Very good
  • 31.6%Good
  • 5.3%Satisfactory
  • 15.8%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.8%Excellent
  • 10.5%Very good
  • 21.1%Good
  • 31.6%Satisfactory
  • 15.8%Fair
  • 5.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.3%Excellent
  • 21.7%Good
  • 47.8%Satisfactory
  • 26.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 10077,  Location: 4.7 MI S JCT SH10 & SH206 (Lat: 42.129022,  Lng: -75.160467),  Route carried "on" structure: State highway 10,  Year Built: 1988,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 2,144 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,236 (year 2040),  Design Load: HS 20,  Features Intersected: W BR DELAWARE RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.285,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.8m (143.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,390,000,  Roadway Improvement Cost: $1,399,000,  Total Project Cost: $3,789,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100771,  Location: 2 MI S JCT SH 10 & SH 206 (Lat: 42.154356,  Lng: -75.165278),  Route carried "on" structure: State highway 10,  Year Built: 2021,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,144 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,236 (year 2040),  Features Intersected: PINES BROOK
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 39.630,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 100772,  Location: JCT RTS 10+206 AT WALTON (Lat: 42.169381,  Lng: -75.134328),  Route carried "on" structure: State highway 10,  Year Built: 1940,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 6,482 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,522 (year 2040),  Design Load: H 20,  Features Intersected: WEST BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.250,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,010,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100773,  Location: 0.1 MI SE JCT RTS 10 +206 (Lat: 42.167561,  Lng: -75.128086),  Route carried "on" structure: State highway 10,  Year Built: 1957,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,761 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,778 (year 2040),  Design Load: H 20,  Features Intersected: EAST BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.733,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $741,000,  Roadway Improvement Cost: $434,000,  Total Project Cost: $1,175,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100774,  Location: 1.1 MI SE JCT RTS 10 +206 (Lat: 42.158511,  Lng: -75.113497),  Route carried "on" structure: State highway 10,  Year Built: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,761 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,880 (year 2040),  Features Intersected: MARVIN HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.358,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $773,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104043,  Location: JCT RTE206+WBR DELAWARE R (Lat: 42.166781,  Lng: -75.129953),  Route carried "on" structure: State highway 206,  Year Built: 1957,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 1,565 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,574 (year 2040),  Design Load: H 20,  Features Intersected: W BR DELAWARE RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.525,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.97m (22.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,089,000,  Roadway Improvement Cost: $1,223,000,  Total Project Cost: $3,313,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 222721,  Location: 0.5 MI E OF NYS RT 10 (Lat: 42.123622,  Lng: -75.156569),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BEERS BROOK,  Facility Carried by Structure: BEERS BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $848,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222723,  Location: 2.1 MI NE JCT SH 10 & 206 (Lat: 42.186853,  Lng: -75.099108),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 42 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 59 (year 2037),  Features Intersected: EAST BROOK,  Facility Carried by Structure: NICHOLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Very good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $314,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222725,  Location: 1.6 MI NE JCT RTS 10 &206 (Lat: 42.179706,  Lng: -75.111014),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 23 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 32 (year 2037),  Design Load: HS 20,  Features Intersected: EAST BROOK,  Facility Carried by Structure: E BROOK DAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $436,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222726,  Location: 1.7 MI N JCT SH10 & SH206 (Lat: 42.192150,  Lng: -75.125653),  Route carried "on" structure: Other road ,  Year Built: 1975,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 11 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 15 (year 2040),  Features Intersected: WEST BROOK,  Facility Carried by Structure: BOB GOULD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $305,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 222734,  Location: 0.2 MI NW JCT RTS 10<206 (Lat: 42.172994,  Lng: -75.139106),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 570 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 798 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: THIRD BROOK,  Facility Carried by Structure: OGDEN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $361,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 322727,  Location: 1 MILE EAST OF WALTON (Lat: 42.160050,  Lng: -75.166706),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 467 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 654 (year 2038),  Design Load: HS 20,  Features Intersected: PINES BROOK,  Facility Carried by Structure: PINES BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $729,000,  Roadway Improvement Cost: $427,000,  Total Project Cost: $1,155,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335343,  Location: 4.5 MI N OF WALTON (Lat: 42.231231,  Lng: -75.124533),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,461 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,524 (year 2040),  Design Load: HS 20,  Features Intersected: FREER HOLLOW BRK,  Facility Carried by Structure: WALTON-FRANKLN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.760,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $413,000,  Total Project Cost: $1,119,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335344,  Location: 3.5 MILES NE OF WALTON (Lat: 42.205619,  Lng: -75.085778),  Route carried "on" structure: County highway ,  Year Built: 1953,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 388 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 543 (year 2036),  Design Load: HS 20,  Features Intersected: EAST BROOK,  Facility Carried by Structure: COUNTY ROAD 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.586,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $693,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335345,  Location: 2.2 MI N OF WALTON (Lat: 42.198528,  Lng: -75.121242),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 390 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 406 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WEST BROOK,  Facility Carried by Structure: CR 23 WALTON/SID
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.141,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $577,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $915,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3353462,  Location: VILLAGE OF WALTON (Lat: 42.169206,  Lng: -75.126442),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 166 (year 2017),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: EAST BROOK,  Facility Carried by Structure: BENTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $637,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335347,  Location: DOWNTOWN WALTON (Lat: 42.171500,  Lng: -75.131261),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,419 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,987 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WEST BROOK,  Facility Carried by Structure: MEAD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $804,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 3353482,  Location: VILLAGE OF WALTON (Lat: 42.170286,  Lng: -75.124661),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 308 (year 2020),  Truck Traffic: 3%,  Features Intersected: EAST BROOK,  Facility Carried by Structure: GRISWOLD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $483,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $767,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335349,  Location: INTERSECTION OF EAST&FLYN (Lat: 42.175078,  Lng: -75.129244),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 650 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 910 (year 2040),  Design Load: HS 20,  Features Intersected: WEST BROOK,  Facility Carried by Structure: EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $692,000,  Roadway Improvement Cost: $405,000,  Total Project Cost: $1,098,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 336042,  Location: 2 MI NW OF WALTON (Lat: 42.194792,  Lng: -75.155075),  Route carried "on" structure: Other road ,  Year Built: 2021,  Status: Open,  Structure Length: 1.04m (3.41ft),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: THIRD BROOK,  Facility Carried by Structure: LOWR THIRD BRK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $635,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 336933,  Location: 3 MI S OF WALTON (Lat: 42.122633,  Lng: -75.153294),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BEERS BROOK,  Facility Carried by Structure: BEERS BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $348,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336934,  Location: 3.0 M SOUTH OF WALTON (Lat: 42.125236,  Lng: -75.139614),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BEERS BROOK,  Facility Carried by Structure: BEERS BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.108,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $388,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336935,  Location: 3.0 MI SOUTH OF WALTON (Lat: 42.124133,  Lng: -75.141850),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BEERS BROOK,  Facility Carried by Structure: BEERS BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $761,000 ( Estimate for 2021)
Discuss Walton, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.