Bridge Statistics for Wawarsing, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 377ft / 115mTotal length
  • $101,576,000Total costs
  • 70,421Total average daily traffic
  • 5,065Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wawarsing
  • No street view available for this location

New bridges in Wawarsing, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11910-1919
  • 21920-1929
  • 41930-1939
  • 51950-1959
  • 41960-1969
  • 31970-1979
  • 11980-1989
  • 71990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Wawarsing, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 61980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Wawarsing, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Excellent
  • 25.0%Good
  • 46.4%Satisfactory
  • 17.9%Fair
  • 3.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.4%Excellent
  • 17.2%Very good
  • 27.6%Good
  • 24.1%Satisfactory
  • 20.7%Fair
  • 3.4%Serious
  • 3.4%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.4%Excellent
  • 6.9%Very good
  • 20.7%Good
  • 41.4%Satisfactory
  • 17.2%Fair
  • 6.9%Poor
  • 3.4%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.1%Very good
  • 31.3%Good
  • 37.5%Satisfactory
  • 15.6%Fair
  • 12.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 102541,  Location: JCT RTE 44+RONDOUT CR (Lat: 41.770100,  Lng: -74.311361),  Route carried "on" structure: US 44,  Year Built: 1957,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 3,177 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,191 (year 2040),  Design Load: HS 20,  Features Intersected: RONDOUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.07m (26.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,646,000,  Roadway Improvement Cost: $2,135,000,  Total Project Cost: $5,780,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102542,  Location: 0.6 MI E JCT RTS 44+209 (Lat: 41.767494,  Lng: -74.303372),  Route carried "on" structure: US 44,  Year Built: 1957,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,177 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,191 (year 2040),  Design Load: H 20,  Features Intersected: KERHONKSON RESERVOIR OUT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $956,000,  Roadway Improvement Cost: $560,000,  Total Project Cost: $1,516,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 102543,  Location: 0.8 MI E JCT RTS 44+209 (Lat: 41.766633,  Lng: -74.299728),  Route carried "on" structure: US 44,  Year Built: 1957,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,177 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,191 (year 2040),  Design Load: H 20,  Features Intersected: KERHONKSON RES IN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Fair,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $705,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 102544,  Location: 2.9 MI E JCT RTS 44 & 209 (Lat: 41.745725,  Lng: -74.281206),  Route carried "on" structure: US 44,  Year Built: 1997,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 3,177 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,191 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: STONY KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.650,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,055,000,  Roadway Improvement Cost: $618,000,  Total Project Cost: $1,673,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 102659,  Location: 5.2 MI W JCT SH 52 + US 2 (Lat: 41.726703,  Lng: -74.487675),  Route carried "on" structure: State highway 52,  Year Built: 1950,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 3,869 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,905 (year 2040),  Design Load: HS 20,  Features Intersected: WEST BRANCH BEER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.176,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.18m (20.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,335,000,  Roadway Improvement Cost: $2,538,000,  Total Project Cost: $6,873,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10266,  Location: 1.3 MI W JCT SH 52 & US 2 (Lat: 41.725617,  Lng: -74.415228),  Route carried "on" structure: State highway 52,  Year Built: 1998,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 3,869 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,887 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: N. OLD GREENFIELD RD - C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.403,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,389,000,  Roadway Improvement Cost: $813,000,  Total Project Cost: $2,202,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102663,  Location: 1.8 MI E JCT SH 52 & US 2 (Lat: 41.694164,  Lng: -74.392658),  Route carried "on" structure: State highway 52,  Year Built: 1991,  Status: Open,  Structure Length: 13.14m (43.11ft),  Average Daily Traffic: 2,513 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,052 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SOUTH GULLY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.407,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.0m (160.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.13m (43.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,398,000,  Roadway Improvement Cost: $3,747,000,  Total Project Cost: $10,145,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102708,  Location: 5.4 MI W JCT RTS 55+209 (Lat: 41.791769,  Lng: -74.414072),  Route carried "on" structure: State highway 55,  Year Built: 1939,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 785 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 818 (year 2040),  Design Load: H 20,  Features Intersected: RONDOUT CREEK
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 8.302,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 54.8m (179.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $6,714,000,  Roadway Improvement Cost: $3,932,000,  Total Project Cost: $10,646,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102709,  Location: 1.8 MI W JCT RTS 55+209 (Lat: 41.757475,  Lng: -74.381128),  Route carried "on" structure: State highway 55,  Year Built: 2017,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 1,917 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,371 (year 2040),  Design Load: HL 93,  Features Intersected: RONDOUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.143,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.2m (158.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.99m (16.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,850,000,  Roadway Improvement Cost: $1,669,000,  Total Project Cost: $4,519,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10271,  Location: 0.9 MI W JCT RTS 55+209 (Lat: 41.746125,  Lng: -74.384247),  Route carried "on" structure: State highway 55,  Year Built: 1969,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 1,917 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,371 (year 2040),  Design Load: H 20,  Features Intersected: RONDOUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.639,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,498,000,  Roadway Improvement Cost: $1,463,000,  Total Project Cost: $3,960,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102711,  Location: 1.6 MI N JCT RTS 209+55 (Lat: 41.757544,  Lng: -74.358728),  Route carried "on" structure: US 209,  Year Built: 1933,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 9,022 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,064 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: VER NOOY KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.049,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 79.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,435,000,  Roadway Improvement Cost: $1,426,000,  Total Project Cost: $3,861,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104071,  Location: 4.5 MI S JCT RTS 209+52 (Lat: 41.661806,  Lng: -74.425281),  Route carried "on" structure: US 209,  Year Built: 1961,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 4,887 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,909 (year 2040),  Design Load: HS 20,  Features Intersected: HOMOWACK KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,739,000,  Roadway Improvement Cost: $1,018,000,  Total Project Cost: $2,757,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104072,  Location: 1.7 MI S JCT RTS 209 + 52 (Lat: 41.696497,  Lng: -74.409711),  Route carried "on" structure: US 209,  Year Built: 1993,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 4,887 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,909 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LEUREN KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.618,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $935,000,  Roadway Improvement Cost: $548,000,  Total Project Cost: $1,483,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104074,  Location: JCT RTE 209 & ROUNDOUT CR (Lat: 41.738208,  Lng: -74.376794),  Route carried "on" structure: US 209,  Year Built: 1991,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 11,922 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,978 (year 2040),  Design Load: HS 20,  Features Intersected: RONDOUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.249,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 95.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 73.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,651,000,  Roadway Improvement Cost: $2,138,000,  Total Project Cost: $5,788,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109134,  Location: 4.3 MI S JCT RTS 209+52 (Lat: 41.665617,  Lng: -74.424939),  Route carried "on" structure: US 209,  Year Built: 1961,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 4,887 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,909 (year 2040),  Design Load: HS 20,  Features Intersected: SANDBURG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,694,000,  Roadway Improvement Cost: $992,000,  Total Project Cost: $2,686,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 202723,  Location: 3.4 MI NW OF LACKAWACK (Lat: 41.822756,  Lng: -74.453822),  Route carried "on" structure: Other road 55A,  Year Built: 2000,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 697 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 976 (year 2036),  Features Intersected: TROUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.186,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.76m (22.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,772,000,  Roadway Improvement Cost: $2,209,000,  Total Project Cost: $5,982,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222476,  Location: AT SPRING GLEN (Lat: 41.665808,  Lng: -74.429500),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 416 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 582 (year 2037),  Design Load: HS 20,  Features Intersected: SANDBURG CREEK,  Facility Carried by Structure: OLD ROUTE 209
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,138,000,  Roadway Improvement Cost: $667,000,  Total Project Cost: $1,805,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222479,  Location: .7 MI SE OF WAWARSING (Lat: 41.750361,  Lng: -74.350189),  Route carried "on" structure: Other road ,  Year Built: 1915,  Year Reconstructed: 2001,  Status: Closed,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 233 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 326 (year 2037),  Features Intersected: RONDOUT CREEK,  Facility Carried by Structure: PORT BEN ROAD
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 1.062,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 60.4m (198.2ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.09m (19.98ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $2,475,000,  Roadway Improvement Cost: $1,449,000,  Total Project Cost: $3,924,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 226444,  Location: 2.7 MI NE OF DAIRYLAND (Lat: 41.759700,  Lng: -74.490339),  Route carried "on" structure: Other road ,  Year Built: 1979,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 127 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 178 (year 2037),  Features Intersected: BEER KILL,  Facility Carried by Structure: GEIGER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $660,000,  Roadway Improvement Cost: $387,000,  Total Project Cost: $1,047,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226445,  Location: 1.7 MI E OF GREENFIELD PK (Lat: 41.725022,  Lng: -74.454142),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 1.22m (4.00ft),  Truck Traffic: 10%,  Features Intersected: WEST BRANCH BEER KILL,  Facility Carried by Structure: BARBARA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $670,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $1,063,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 226446,  Location: 1.1 MI SW OF KERHONKSON (Lat: 41.760381,  Lng: -74.310233),  Route carried "on" structure: Other road ,  Year Built: 1976,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 292 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 409 (year 2040),  Features Intersected: TRIBUTARY to RONDOUT CRE,  Facility Carried by Structure: FORDEMOOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $693,000,  Roadway Improvement Cost: $406,000,  Total Project Cost: $1,098,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227014,  Location: .5 MI JCT Rt.209 & Plank (Lat: 41.744389,  Lng: -74.360819),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 0.70m (2.30ft),  Features Intersected: Criminal Creek,  Facility Carried by Structure: Berme Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.475,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $592,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334638,  Location: 1.8 MI SW OF ELLENVILLE (Lat: 41.689311,  Lng: -74.408706),  Route carried "on" structure: Other road ,  Year Built: 1929,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 40 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 56 (year 2037),  Design Load: HS 20,  Features Intersected: SANDBURG CREEK,  Facility Carried by Structure: HANG GLIDER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Critical,  Channel: Poor,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $513,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $813,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334643,  Location: 1.9 MI SE JCT RTS 55A&55 (Lat: 41.773242,  Lng: -74.400697),  Route carried "on" structure: ServiceOther road ,  Year Built: 1931,  Year Reconstructed: 1993,  Status: Closed,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 151 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 211 (year 2039),  Features Intersected: RONDOUT CREEK,  Facility Carried by Structure: SPORTSMANS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.154,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Critical,  Substructure: Satisfactory,  Channel: Satisfactory,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $1,636,000,  Roadway Improvement Cost: $958,000,  Total Project Cost: $2,595,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334648,  Location: AT NAPANOCH (Lat: 41.743242,  Lng: -74.366500),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 1,637 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,292 (year 2038),  Design Load: HS 20,  Features Intersected: RONDOUT CREEK,  Facility Carried by Structure: INSTITUTION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $2,572,000,  Roadway Improvement Cost: $1,506,000,  Total Project Cost: $4,077,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334653,  Location: 1 MI NE JCT Rts. 44 & 209 (Lat: 41.773064,  Lng: -74.297175),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 2,344 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,282 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: RONDOUT CREEK,  Facility Carried by Structure: COUNTY ROAD 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.5m (80.4ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.99m (16.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,200,000,  Roadway Improvement Cost: $1,288,000,  Total Project Cost: $3,488,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334661,  Location: 2 MI NW JCT 55 & 209 (Lat: 41.767483,  Lng: -74.371267),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 23 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 32 (year 2038),  Design Load: HS 20,  Features Intersected: VERNOOY KILL,  Facility Carried by Structure: Cutler Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.303,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $656,000,  Roadway Improvement Cost: $384,000,  Total Project Cost: $1,039,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334687,  Location: 2.9 MI N OF GREENFIELD PK (Lat: 41.769617,  Lng: -74.486467),  Route carried "on" structure: County highway ,  Year Built: 1953,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 175 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 245 (year 2035),  Design Load: H 20,  Features Intersected: BOTSFORD BROOK,  Facility Carried by Structure: ULSTER HEIGHTS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.602,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,383,000,  Roadway Improvement Cost: $810,000,  Total Project Cost: $2,193,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334705,  Location: 2.9 MI NW OF ELLENVILLE (Lat: 41.744942,  Lng: -74.431086),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 102 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 143 (year 2037),  Design Load: HS 20,  Features Intersected: BEER KILL,  Facility Carried by Structure: MARCUS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $461,000,  Total Project Cost: $1,250,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334723,  Location: 1.4 MI E OF WAWARSING (Lat: 41.763028,  Lng: -74.333556),  Route carried "on" structure: Other road ,  Year Built: 1896,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 292 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 409 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RONDOUT CREEK,  Facility Carried by Structure: FOORDMORE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,648,000,  Roadway Improvement Cost: $965,000,  Total Project Cost: $2,612,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334787,  Location: 1.0 MI SW OF ELLENVILLE (Lat: 41.701989,  Lng: -74.404428),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 329 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 461 (year 2037),  Design Load: HS 20,  Features Intersected: SANDBURG CREEK,  Facility Carried by Structure: ARROWHEAD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 86.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 66.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,161,000,  Roadway Improvement Cost: $680,000,  Total Project Cost: $1,840,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336519,  Location: 1.3 MI NW OF ELLENVILLE (Lat: 41.725103,  Lng: -74.415756),  Route carried "on" structure: County highway ,  Year Built: 1924,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 80 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 112 (year 2039),  Features Intersected: WEST BRNCH BEER KILL,  Facility Carried by Structure: OLD GREENFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $986,000,  Roadway Improvement Cost: $578,000,  Total Project Cost: $1,564,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10266,  Location: 1.3 MI W JCT SH 52 & US 2 (Lat: 41.725617,  Lng: -74.415228),  Route carried "under" structure: County highway ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 1980),  Features Intersected: N. OLD GREENFIELD RD - C,  Facility Carried by Structure: RTE 52
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.0m (91.9ft)