Bridge Statistics for Webb, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 171ft / 52.5mTotal length
  • $13,544,000Total costs
  • 10,224Total average daily traffic
  • 851Total average daily truck traffic
  • 14,339Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Webb
  • No street view available for this location

New bridges in Webb, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21950-1959
  • 21960-1969
  • 41990-1999
  • 32000-2009
Average Bridge Daily Traffic in Webb, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Very good
  • 33.3%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 44.4%Very good
  • 33.3%Good
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 44.4%Very good
  • 11.1%Good
  • 11.1%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 53.8%Good
  • 46.2%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 44,  Location: 1 1/2 MI NE OF EASLEY (Lat: 33.971025,  Lng: -86.518353),  Route carried "on" structure: County highway 208,  Year Built: 1927,  Status: Posted for load,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 162 (year 2021),  Average Future Daily Traffic: 241 (year 2041),  Features Intersected: LITTLE WARRIOR RIVER,  Facility Carried by Structure: EASLEY BRIDGE RD
Minimum Vertical Clearance: 2.74m (8.99ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 3.3m (10.8ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.42m (11.22ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $305,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $336,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3792,  Location: AL 52 TO CO RD 48 (Lat: 31.289161,  Lng: -85.264097),  Route carried "on" structure: County highway 54,  Year Built: 1950,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 660 (year 1993),  Truck Traffic: 7%,  Average Future Daily Traffic: 800 (year 2033),  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $347,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4634,  Location: AL 52 TO CO RD 48 (Lat: 31.286447,  Lng: -85.212142),  Route carried "on" structure: County highway 54,  Year Built: 1953,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 655 (year 1992),  Truck Traffic: 7%,  Average Future Daily Traffic: 800 (year 2033),  Features Intersected: SMITH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $268,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8377,  Location: CO RD 105 TO CO RD 26 (Lat: 31.290908,  Lng: -85.296617),  Route carried "on" structure: County highway 57,  Year Built: 1964,  Status: Posted for load,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 337 (year 1992),  Truck Traffic: 7%,  Average Future Daily Traffic: 600 (year 2034),  Features Intersected: OMUSEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 36 months,  Inspection Date: March 2021,  Other Special Inspection Date: May 2020,  Bridge Improvement Cost: $1,306,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,437,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12256,  Location: 1.3 MI.W.HOUSTON 55 (Lat: 31.256067,  Lng: -85.246233),  Route carried "on" structure: State highway 52,  Year Built: 1928,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,320 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,911 (year 2033),  Design Load: H 15,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 117.814,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $396,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15077,  Location: CO RD 22 TO CO RD 44 (Lat: 31.307864,  Lng: -85.273089),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Posted for load,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 95 (year 1992),  Average Future Daily Traffic: 110 (year 2033),  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: WILLIE RALEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 12.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.07m (13.35ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $725,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $798,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15704,  Location: HENRY CO LINE TO AL 52 (Lat: 31.310467,  Lng: -85.274214),  Route carried "on" structure: County highway 22,  Year Built: 1993,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 700 (year 1993),  Truck Traffic: 15%,  Average Future Daily Traffic: 980 (year 2033),  Design Load: HS 20,  Features Intersected: 0MUSSEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,938,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $3,232,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17267,  Location: AL 52 TO THE CIRCLE (Lat: 31.252878,  Lng: -85.324194),  Route carried "on" structure: County highway 46,  Year Built: 1998,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,442 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,900 (year 2033),  Design Load: HS 20,  Features Intersected: OMUSEE CREEK,  Facility Carried by Structure: WEBB RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 17486,  Location: CIRCLE TO GENEVA CO (Lat: 31.095581,  Lng: -85.480450),  Route carried "on" structure: County highway 15,  Year Built: 1998,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 790 (year 1997),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,170 (year 2033),  Design Load: HS 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: SOUTH PARK RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 17814,  Location: CIRCLE TO CO RD 55 (Lat: 31.263997,  Lng: -85.318014),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 603 (year 1900),  Truck Traffic: 4%,  Average Future Daily Traffic: 980 (year 2033),  Design Load: HS 20,  Features Intersected: OMUSSE CREEK,  Facility Carried by Structure: WATSON BRIDGE RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,720,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,892,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 18582,  Location: CO RD 57 TO CO RD 22 (Lat: 31.305614,  Lng: -85.280544),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 230 (year 1993),  Truck Traffic: 7%,  Average Future Daily Traffic: 600 (year 2033),  Design Load: HS 20,  Features Intersected: OMUSSEE CREEK,  Facility Carried by Structure: GILLEY MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,720,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,892,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19782,  Location: NORTH OF OLD WEBB RD. (Lat: 31.176736,  Lng: -85.298178),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 202 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 202 (year 2034),  Design Load: HS 20,  Features Intersected: GOLF CREEK,  Facility Carried by Structure: PEACOCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $255,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20117,  Location: CO. RD. 63 TO CO. RD. 55 (Lat: 31.269003,  Lng: -85.215775),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 28 (year 2008),  Average Future Daily Traffic: 45 (year 2033),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: WALLACE BUIE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels