  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 125ft / 37.6mTotal length
  • $11,945,000Total costs
  • 18,051Total average daily traffic
  • 1,152Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Webb
  • No street view available for this location

New bridges in Webb, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11910-1919
  • 11940-1949
  • 11950-1959
  • 11980-1989
  • 21990-1999
  • 32000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Webb, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
Average Bridge Daily Traffic in Webb, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 20.0%Very good
  • 40.0%Good
  • 30.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 40.0%Very good
  • 40.0%Good
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Excellent
  • 20.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Excellent
  • 27.3%Very good
  • 45.5%Good
  • 18.2%Satisfactory
Find on map >>   Show street view

Structure Number: 102023,  Location: 7 MI SW OF THENDARA (Lat: 43.612700,  Lng: -75.102428),  Route carried "on" structure: State highway 28,  Year Built: 1947,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 15.03m (49.31ft),  Average Daily Traffic: 3,568 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,590 (year 2040),  Design Load: HS 20,  Features Intersected: MOOSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.02m (49.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,532,000,  Roadway Improvement Cost: $1,483,000,  Total Project Cost: $4,014,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102025,  Location: 2.7 MI NE JCT SH12 & SH28 (Lat: 43.703628,  Lng: -74.984469),  Route carried "on" structure: State highway 28,  Year Built: 1991,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 4,683 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,712 (year 2040),  Design Load: HS 20,  Features Intersected: M BR MOOSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.718,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $768,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $1,218,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102026,  Location: 27.6MI NW JCT RTS 12 & 28 (Lat: 43.712767,  Lng: -74.969686),  Route carried "on" structure: State highway 28,  Year Built: 2000,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 4,134 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,159 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MOOSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.343,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $863,000,  Roadway Improvement Cost: $506,000,  Total Project Cost: $1,369,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220492,  Location: 4 MILES SW OF BRANDRETH (Lat: 43.904675,  Lng: -74.906717),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 3.08m (10.10ft),  Truck Traffic: 4%,  Features Intersected: BEAVER RIVER,  Facility Carried by Structure: BULLOCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $437,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220493,  Location: .5 MI SW OF OLD FORGE (Lat: 43.694903,  Lng: -74.998606),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 177 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 248 (year 2036),  Design Load: HS 20,  Features Intersected: M BR MOOSE RIVER,  Facility Carried by Structure: GREENBRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $570,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220494,  Location: 4 MI NE OF OLD FORGE (Lat: 43.763119,  Lng: -74.920481),  Route carried "on" structure: Other road ,  Year Built: 1910,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 39 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 55 (year 2038),  Design Load: H 20,  Features Intersected: N BR MOOSE RIVER,  Facility Carried by Structure: RONDAXE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $455,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 220495,  Location: 3.5 MI NW EAGLE BAY (Lat: 43.816789,  Lng: -74.856142),  Route carried "on" structure: Other road ,  Year Built: 1950,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 91 (year 2017),  Average Future Daily Traffic: 127 (year 2037),  Features Intersected: OUTLET SOUTH BAY,  Facility Carried by Structure: COVEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $299,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 226357,  Location: 1.5 MILES SE OF CARTER (Lat: 43.758506,  Lng: -74.933539),  Route carried "on" structure: Other road ,  Year Built: 1895,  Year Reconstructed: 2003,  Status: Posted for load,  Structure Length: 3.20m (10.50ft),  Truck Traffic: 10%,  Features Intersected: N BR MOOSE RIVER,  Facility Carried by Structure: SNOWMOBILE TRAIL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 1.303,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $1,251,000,  Roadway Improvement Cost: $733,000,  Total Project Cost: $1,984,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 227134,  Location: 19 Miles NW of Eagle Bay (Lat: 43.895342,  Lng: -75.047519),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 1.13m (3.71ft),  Design Load: HS 25 or greater,  Features Intersected: Stillwater Spillway Chan,  Facility Carried by Structure: Necessary Dam Rd
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 81.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $373,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 330821,  Location: 3 MILES EAST OF BIG MOOSE (Lat: 43.809808,  Lng: -74.854200),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 449 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 629 (year 2037),  Design Load: HL 93,  Features Intersected: N BR MOOSE RIVER,  Facility Carried by Structure: CR1 BIG MOOSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.259,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $556,000,  Roadway Improvement Cost: $325,000,  Total Project Cost: $881,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330822,  Location: 2.5 MI E OLD FORGE (Lat: 43.710339,  Lng: -74.950511),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,346 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,884 (year 2037),  Design Load: HL 93,  Features Intersected: TWIN POND OUTLET,  Facility Carried by Structure: CR118 SOUTH SHORE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $345,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 702024,  Location: THENDARA (Lat: 43.700636,  Lng: -75.003494),  Route carried "under" structure: State highway 28,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 3,564 (year 2000),  Features Intersected: RTE 28,  Facility Carried by Structure: ADIRONDACK SCENIC
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 14.626,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 31.5m (103.3ft)