Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Milford, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 131ft / 40.3mTotal length
  • $4,460,000Total costs
  • 16,150Total average daily traffic
  • 960Total average daily truck traffic
  • 21,205Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Milford
  • No street view available for this location

New bridges in West Milford, WV - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11940-1949
  • 21970-1979
  • 11980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in West Milford, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 12.5%Satisfactory
  • 37.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 30.0%Good
  • 10.0%Satisfactory
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Fair
  • 50.0%Poor
Find on map >>   Show street view

Structure Number: 17A069,  Location: 0.07 MI NORTH CO RT 19/17 (Lat: 39.176581,  Lng: -80.438969),  Route carried "on" structure: US 1900,  Year Built: 1988,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,625 (year 2038),  Design Load: HS 20,  Features Intersected: WEST FORK RIVER,  Facility Carried by Structure: US ROUTE 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.226,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A072,  Location: 0.17 MI NORTH CO RT 19/62 (Lat: 39.183111,  Lng: -80.439600),  Route carried "on" structure: US 1900,  Year Built: 1924,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 2,700 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,525 (year 2038),  Features Intersected: BR. OF WEST FORK RIVER,  Facility Carried by Structure: US ROUTE 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.095,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $453,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A073,  Location: 0.02 MI SOUTH CO RT 33 (Lat: 39.226369,  Lng: -80.406781),  Route carried "on" structure: US 1900,  Year Built: 1925,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 3,100 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,050 (year 2038),  Features Intersected: SYCAMORE CREEK,  Facility Carried by Structure: US ROUTE 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.498,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.1m (26.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $362,000,  Total Project Cost: $924,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 17A153,  Location: 0.11 MI EAST CO RT 36 (Lat: 39.198981,  Lng: -80.404139),  Route carried "on" structure: State highway 27000,  Year Built: 1979,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 3,100 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,050 (year 2038),  Design Load: HS 20,  Features Intersected: WEST FORK RIVER,  Facility Carried by Structure: WV 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A154,  Location: 0.02 MI EAST CO RT 27/4 (Lat: 39.192819,  Lng: -80.398061),  Route carried "on" structure: State highway 27000,  Year Built: 1994,  Status: Open,  Structure Length: 5.01m (16.44ft),  Average Daily Traffic: 2,850 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,725 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: LOST CREEK,  Facility Carried by Structure: WV 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.140,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $989,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A172,  Location: 0.07 MI WEST CO RT 36/4 (Lat: 39.210781,  Lng: -80.383689),  Route carried "on" structure: County highway 3600,  Year Built: 1976,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 800 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,050 (year 2038),  Design Load: HS 20,  Features Intersected: West Fork River,  Facility Carried by Structure: HARRISON CO RT 36
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 36.2m (118.8ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: June 2017,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $567,000,  Total Project Cost: $1,438,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A296,  Location: 0.01 MI EAST US ROUTE 19 (Lat: 39.236531,  Lng: -80.396539),  Route carried "on" structure: County highway 3400,  Year Built: 1996,  Status: Open,  Structure Length: 7.58m (24.87ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,640 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: WEST FORK RIVER,  Facility Carried by Structure: HARRISON CO RT 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.0m (121.4ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: Febuary 2021,  Underwater Inspection Date: July 2019,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A298,  Location: 0.01 MI WEST US ROUTE 19 (Lat: 39.163500,  Lng: -80.452000),  Route carried "on" structure: County highway 1918,  Year Built: 1997,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 300 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 410 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: WEST FORK RIVER,  Facility Carried by Structure: HARR CO RT 19/18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.971,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $315,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A3,  Location: 0.10 MI WEST CO RT 33/2 (Lat: 39.232811,  Lng: -80.440769),  Route carried "on" structure: County highway 3103,  Year Built: 1949,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2018),  Average Future Daily Traffic: 65 (year 2038),  Features Intersected: BRANCH SYCAMORE CREEK,  Facility Carried by Structure: HARR CO RT 31/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.538,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 17A336,  Location: 0.15 MI SOUTH WV RT 270 (Lat: 39.185589,  Lng: -80.390111),  Route carried "on" structure: Other road 99700,  Year Built: 2004,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 50 (year 2018),  Average Future Daily Traffic: 65 (year 2038),  Features Intersected: LOST CREEK,  Facility Carried by Structure: HRR CO RT 997 HARP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $341,000 ( Estimate for 2020)
Discuss West Milford, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.