Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Rutland, Vermont (VT)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 220ft / 67.4mTotal length
  • $20,854,000Total costs
  • 140,665Total average daily traffic
  • 13,646Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Rutland
  • No street view available for this location

New bridges in West Rutland, VT - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11950-1959
  • 101960-1969
  • 11970-1979
  • 61980-1989
  • 11990-1999
Average Bridge Daily Traffic in West Rutland, VT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 21.4%Very good
  • 21.4%Good
  • 28.6%Satisfactory
  • 28.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.4%Very good
  • 71.4%Good
  • 7.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Good
  • 50.0%Satisfactory
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 62.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101128001411281,  Location: 0.1 MI TO JCT W VT133 (Lat: 43.574411,  Lng: -73.032708),  Route carried "on" structure: Other road C3017,  Year Built: 1977,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2029),  Design Load: H 20,  Features Intersected: CLARENDON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $261,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 101128001511281,  Location: 0.05 MI TO JCT W VT4-A (Lat: 43.605703,  Lng: -73.065153),  Route carried "on" structure: Other road C3006,  Year Built: 1919,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 420 (year 2029),  Design Load: H 15,  Features Intersected: CASTLETON RIVER,  Facility Carried by Structure: C2004
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $423,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101128001611281,  Location: 0.01 MI TO JCT W US4 (Lat: 43.593097,  Lng: -73.033683),  Route carried "on" structure: Other road C3005,  Year Built: 1988,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 75 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 79 (year 2029),  Design Load: HS 20,  Features Intersected: CLARENDON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101128002611281,  Location: 0.1 MI TO JCT W US4 (Lat: 43.587403,  Lng: -73.039028),  Route carried "on" structure: Other road C3005,  Year Built: 1986,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 105 (year 2029),  Design Load: HS 20,  Features Intersected: CLARENDON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 103408001311282,  Location: 0.2 MI TO JCT W CL3 TH6 (Lat: 43.610558,  Lng: -73.058092),  Route carried "on" structure: City street WATER,  Year Built: 1992,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 60 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 63 (year 2026),  Design Load: HS 20,  Features Intersected: CASTLETON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $223,000 ( Estimate for 2020),  Deck Structure Type: Aluminum,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 200020013E11282,  Location: 2.3 MI W EXIT 6 VT.4A (Lat: 43.605303,  Lng: -73.066603),  Route carried "on" structure: US 4,  Year Built: 1968,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 13,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,070 (year 2028),  Design Load: HS 20,  Features Intersected: CLARENDON PITTSFORD R.R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.657,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,109,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $5,159,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200020013W11282,  Location: 2.3 MI W EXIT 6 VT.4A (Lat: 43.605403,  Lng: -73.066317),  Route carried "on" structure: US 4,  Year Built: 1968,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 13,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,070 (year 2028),  Design Load: HS 20,  Features Intersected: CLARENDON PITTSFORD R.R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.657,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.60m (31.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,925,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $3,975,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200020014E11282,  Location: 2.1 MI W EXIT 6 VT.4A (Lat: 43.604372,  Lng: -73.065108),  Route carried "on" structure: US 4,  Year Built: 1968,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 13,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,070 (year 2028),  Design Load: HS 20,  Features Intersected: US 4 OVER VT 4A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.850,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.0m (118.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,653,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $3,703,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200020014W11282,  Location: 2.1 MI W EXIT 6 VT.4A (Lat: 43.604375,  Lng: -73.064669),  Route carried "on" structure: US 4,  Year Built: 1968,  Status: Open,  Structure Length: 10.39m (34.09ft),  Average Daily Traffic: 13,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,070 (year 2028),  Design Load: HS 20,  Features Intersected: US 4 OVER VT 4A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.850,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.39m (34.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,237,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $4,287,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200020015E11282,  Location: 0.6 MI W EXIT 6 VT.4A (Lat: 43.587869,  Lng: -73.045475),  Route carried "on" structure: US 4,  Year Built: 1968,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 13,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,070 (year 2028),  Design Load: HS 20,  Features Intersected: US 4 OVER VT 133
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.328,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200020015W11282,  Location: 0.6 MI W EXIT 6 VT.4A (Lat: 43.588100,  Lng: -73.045492),  Route carried "on" structure: US 4,  Year Built: 1968,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 13,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,070 (year 2028),  Design Load: HS 20,  Features Intersected: US 4 OVER VT133
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.183,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200020016E11282,  Location: US 4 EXIT 6 (Lat: 43.588367,  Lng: -73.039836),  Route carried "on" structure: US 4,  Year Built: 1986,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 13,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,070 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: US 4 OVER BR US 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.795,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200020016W11282,  Location: US 4 EXIT 6 (Lat: 43.588611,  Lng: -73.039911),  Route carried "on" structure: US 4,  Year Built: 1986,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 13,400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,070 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: US 4 OVER BR US 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.795,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 203200B4-311202,  Location: 0.5 MI W JCT. VT.3 (Lat: 43.600883,  Lng: -73.018778),  Route carried "on" structure: Business US BR4,  Year Built: 1959,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 12,200 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 12,810 (year 2028),  Design Load: HS 20,  Features Intersected: CLARENDON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.327,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.54m (11.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,773,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $2,823,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200020014E11282,  Location: 2.1 MI W EXIT 6 VT.4A (Lat: 43.604372,  Lng: -73.065108),  Route carried "under" structure: Alternate State highway 4A,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 1998),  Truck Traffic: 6%,  Features Intersected: US 4 OVER VT 4A,  Facility Carried by Structure: US 00004 ML
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 200020014W11282,  Location: 2.1 MI W EXIT 6 VT.4A (Lat: 43.604375,  Lng: -73.064669),  Route carried "under" structure: Alternate State highway 4A,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 1998),  Truck Traffic: 6%,  Features Intersected: US 4 OVER VT 4A,  Facility Carried by Structure: US 00004 ML
Minimum Vertical Clearance: 5.68m (18.64ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 200020015E11282,  Location: 0.6 MI W EXIT 6 VT.4A (Lat: 43.587869,  Lng: -73.045475),  Route carried "under" structure: State highway 133,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 4,100 (year 1998),  Truck Traffic: 6%,  Features Intersected: US 4 OVER VT 133,  Facility Carried by Structure: US 00004 ML
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 200020015W11282,  Location: 0.6 MI W EXIT 6 VT.4A (Lat: 43.588100,  Lng: -73.045492),  Route carried "under" structure: State highway 133,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 4,100 (year 1998),  Truck Traffic: 6%,  Features Intersected: US 4 OVER VT 133,  Facility Carried by Structure: US 00004 ML
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 200020016E11282,  Location: US 4 EXIT 6 (Lat: 43.588367,  Lng: -73.039836),  Route carried "under" structure: Business US BR4,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 4,200 (year 1998),  Truck Traffic: 10%,  Features Intersected: US 4 OVER BR US 4,  Facility Carried by Structure: US 00004 ML
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 200020016W11282,  Location: US 4 EXIT 6 (Lat: 43.588611,  Lng: -73.039911),  Route carried "under" structure: Business US BR4,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 4,200 (year 1998),  Truck Traffic: 10%,  Features Intersected: US 4 OVER BR US 4,  Facility Carried by Structure: US 00004 ML
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Discuss West Rutland, Vermont (VT) on our hugely popular Vermont forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.