Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Westover, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 148ft / 45.4mTotal length
  • $25,796,000Total costs
  • 120,718Total average daily traffic
  • 16,337Total average daily truck traffic
  • 159,585Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Westover
  • No street view available for this location

New bridges in Westover, AL - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 81970-1979
  • 11980-1989
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Westover, AL
Average Bridge Truck Traffic in Westover, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Good
  • 75.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 75.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Good
  • 27.8%Satisfactory
  • 33.3%Fair
  • 16.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Very good
  • 20.0%Good
  • 50.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 94,  Location: .3 MI W JCT CO RD 55 (Lat: 33.356889,  Lng: -86.541128),  Route carried "on" structure: County highway 280,  Year Built: 1931,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 600 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 840 (year 2040),  Design Load: H 15,  Features Intersected: N. FORK OF MUDDY PRONG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 78.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $370,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 941,  Location: 0.5 MI E OF CO. 55 (Lat: 33.356278,  Lng: -86.526614),  Route carried "on" structure: County highway 280,  Year Built: 1931,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 599 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 850 (year 2040),  Design Load: H 15,  Features Intersected: MUDDY PRONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $876,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $964,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2488,  Location: HARPERSVILLE END-OLD 280 (Lat: 33.364000,  Lng: -86.497767),  Route carried "on" structure: County highway 280,  Year Built: 1940,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 700 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 980 (year 2041),  Design Load: H 15,  Features Intersected: CLEAR PRONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $575,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $633,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 408,  Location: 2 MI. N. U.S. 280 (Lat: 33.379703,  Lng: -86.524697),  Route carried "on" structure: County highway 55,  Year Built: 1951,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,017 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,425 (year 2040),  Design Load: H 20,  Features Intersected: MUDDY PRONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $479,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7594,  Location: 1.9MI E JCT CO 450*CO 55 (Lat: 33.335303,  Lng: -86.517167),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 280 (year 2040),  Features Intersected: MUDDY PRONG CREEK,  Facility Carried by Structure: CO. HWY. 450 EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 14.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $331,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 11378,  Location: 2.5MI E JCT CO 450*55 (Lat: 33.337397,  Lng: -86.508283),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2040),  Design Load: H 15,  Features Intersected: CLEAR PRONG CREEK,  Facility Carried by Structure: CO. HWY. 450 EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 14.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.05m (6.73ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $337,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $371,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1165,  Location: 2 TH MI E CO RD 51 (Lat: 33.349008,  Lng: -86.556878),  Route carried "on" structure: US 280,  Year Built: 1976,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 19,210 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 25,268 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.658,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $2,359,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $2,595,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11651,  Location: .4 MI. W. CO RD 51 (Lat: 33.349933,  Lng: -86.542883),  Route carried "on" structure: US 280,  Year Built: 1976,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 19,210 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 25,268 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.918,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,266,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,393,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11652,  Location: .3 MI. W CO RD 55 (Lat: 33.350000,  Lng: -86.541633),  Route carried "on" structure: US 280,  Year Built: 1976,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 19,210 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 25,268 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.040,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,893,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,082,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11653,  Location: US 280 * MUDDY PRONG CK (Lat: 33.352900,  Lng: -86.526383),  Route carried "on" structure: US 280,  Year Built: 1976,  Status: Open,  Structure Length: 7.24m (23.75ft),  Average Daily Traffic: 9,075 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 11,937 (year 2042),  Design Load: HS 20,  Features Intersected: MUDDY PRONG CREEK,  Facility Carried by Structure: AL - 38 WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.555,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.27m (27.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,381,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,619,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11654,  Location: US 280 * MUDDY PRONG CK (Lat: 33.350000,  Lng: -86.526383),  Route carried "on" structure: US 280,  Year Built: 1976,  Status: Open,  Structure Length: 7.24m (23.75ft),  Average Daily Traffic: 9,075 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 11,937 (year 2042),  Design Load: HS 20,  Features Intersected: MUDDY PRONG CREEK,  Facility Carried by Structure: AL - 38 EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.555,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.27m (27.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,381,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,619,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11655,  Location: 1.8 MI. E CO RD 55 (Lat: 33.357367,  Lng: -86.499700),  Route carried "on" structure: US 280,  Year Built: 1976,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 18,150 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 23,874 (year 2041),  Design Load: HS 20,  Features Intersected: CLEAR PRONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.993,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,383,000,  Roadway Improvement Cost: $438,000,  Total Project Cost: $4,821,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11656,  Location: 2.2 MI. E. CO RD 55 (Lat: 33.357561,  Lng: -86.499589),  Route carried "on" structure: US 280,  Year Built: 1976,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 18,150 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 23,874 (year 2041),  Design Load: HS 20,  Features Intersected: POPULAR SPRINGS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.637,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,386,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,625,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13032,  Location: 6.6 MI N HWY 25 INT (Lat: 33.306808,  Lng: -86.552294),  Route carried "on" structure: County highway 55,  Year Built: 1983,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 1,400 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,960 (year 2039),  Design Load: HS 20,  Features Intersected: YELLOWLEAF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.77m (25.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,652,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $1,817,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14984,  Location: 1 MI E JCT CO 55 (Lat: 33.321025,  Lng: -86.535797),  Route carried "on" structure: County highway 51,  Year Built: 1935,  Status: Posted for load,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 566 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,093 (year 2041),  Features Intersected: YELLOWLEAF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.5m (14.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 15.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Underwater Inspection Date: June 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $345,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $380,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 19262,  Location: .3 MILES FROM CR 43 (Lat: 33.397875,  Lng: -86.601133),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 50 (year 2022),  Average Future Daily Traffic: 70 (year 2042),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: CROSS CREEK DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $341,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2042,  Location: 0.2 MILES SOUTH CR 55 (Lat: 33.368806,  Lng: -86.536619),  Route carried "on" structure: County highway 51,  Year Built: 2010,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: HS 20,  Features Intersected: UT MUDDY PRONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.2m (7.2ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $589,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $648,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20795,  Location: 1150' south US 280 (Lat: 33.346606,  Lng: -86.537044),  Route carried "on" structure: County highway 55,  Year Built: 2016,  Status: Open,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 2,356 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,051 (year 2040),  Design Load: HS 20,  Features Intersected: Muddy Prong Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $708,000 ( Estimate for 2022)
Discuss Westover, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.