Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Westport, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 449ft / 137mTotal length
  • $43,320,000Total costs
  • 200,242Total average daily traffic
  • 45,532Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Westport
  • No street view available for this location

New bridges in Westport, OK - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 21960-1969
  • 281970-1979
  • 11980-1989
  • 12010-2019
Average Bridge Daily Traffic in Westport, OK
Average Bridge Truck Traffic in Westport, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.3%Excellent
  • 6.3%Very good
  • 18.8%Good
  • 37.5%Satisfactory
  • 31.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Excellent
  • 12.5%Very good
  • 37.5%Good
  • 18.8%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 43.8%Good
  • 6.3%Satisfactory
  • 43.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Very good
  • 42.9%Good
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 50.0%Satisfactory
  • 25.0%Critical
Find on map >>   Show street view

Structure Number: 13916,  Location: 2.5E 1.4S OF TERLTON (Lat: 36.170661,  Lng: -96.447258),  Route carried "on" structure: County highway N3680,  Year Built: 1957,  Status: Posted for load,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 292 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 467 (year 2040),  Design Load: HS 20,  Features Intersected: HOUSE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 17.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 11.21m (36.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $896,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 15577,  Location: 7.6 MI S JCT SH 99 (Lat: 36.228672,  Lng: -96.391336),  Route carried "on" structure: US 64,  Year Built: 1962,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 5,800 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 9,280 (year 2040),  Design Load: H 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.255,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 47.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.75m (41.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,713,000,  Roadway Improvement Cost: $2,826,000,  Total Project Cost: $4,795,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15868,  Location: OSAGE-PAWNEE C/L (Lat: 36.183714,  Lng: -96.268389),  Route carried "on" structure: US 64,  Year Built: 1963,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 30.36m (99.61ft),  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 25,600 (year 2040),  Design Load: H 20,  Features Intersected: ARKANSAS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.527,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 11.0m (36.1ft), Horizontal Clearance: 48.8m (160.1ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 50.6m (166.0ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 31.06m (101.90ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: October 2017,  Bridge Improvement Cost: $10,359,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $15,700,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17674,  Location: .25S 1W OF SH48/CIM TPK (Lat: 36.215797,  Lng: -96.406542),  Route carried "on" structure: County highway D0550,  Year Built: 1970,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: COWSKIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Critical,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 6 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 18519,  Location: 3 MI'S W JCT SH 48 (Lat: 36.219781,  Lng: -96.446108),  Route carried "on" structure: County highway N3680,  Year Built: 1973,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 5,700 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 9,120 (year 2040),  Design Load: HS 20,  Features Intersected: CIMARRON TP UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.742,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $890,000,  Total Project Cost: $1,699,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18557,  Location: .5 MI W. JCT SH 48 (Lat: 36.218267,  Lng: -96.400394),  Route carried "on" structure: US 412,  Year Built: 1973,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 8,600 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 13,760 (year 2040),  Design Load: HS 20,  Features Intersected: COWSKIN CREEK,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.876,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 25.3m (83.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.78m (28.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,097,000,  Roadway Improvement Cost: $1,646,000,  Total Project Cost: $3,129,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18747,  Location: 3.8 MI N CREEK CO (Lat: 36.217411,  Lng: -96.392553),  Route carried "on" structure: Other road 412,  Year Built: 1974,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 8,600 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 13,760 (year 2040),  Design Load: HS 20,  Features Intersected: S.H. 48 UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.294,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 23 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 26.2m (86.0ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $981,000,  Total Project Cost: $1,873,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19033,  Location: 18.5 MI E SH 99 (Lat: 36.216339,  Lng: -96.305078),  Route carried "on" structure: US 64,  Year Built: 1975,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 7,100 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 11,360 (year 2040),  Design Load: HS 20,  Features Intersected: CO. RD. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.056,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5900006H,  Subroute: 38),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $487,000,  Roadway Improvement Cost: $803,000,  Total Project Cost: $1,363,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19034,  Location: 18.5 MI E SH 99 (Lat: 36.216033,  Lng: -96.305081),  Route carried "on" structure: US 64,  Year Built: 1975,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 7,000 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 11,200 (year 2040),  Design Load: HS 20,  Features Intersected: CO. RD. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.056,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $487,000,  Roadway Improvement Cost: $803,000,  Total Project Cost: $1,363,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19038,  Location: 14.0 MI E SH 99 (Lat: 36.217086,  Lng: -96.386475),  Route carried "on" structure: Other road 412,  Year Built: 1975,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 7,200 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.616,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $393,000,  Total Project Cost: $761,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19039,  Location: 14.0 MI E SH 99 (Lat: 36.216814,  Lng: -96.386292),  Route carried "on" structure: Other road 412,  Year Built: 1975,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 4,300 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 6,880 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.616,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $393,000,  Total Project Cost: $761,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19065,  Location: 21.3 MI E SH 99 (Lat: 36.186808,  Lng: -96.271206),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: BEAR GLEN RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.689,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1907,  Location: 16.0 MI E SH 99 (Lat: 36.216283,  Lng: -96.349461),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: WESTPORT RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.050,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.66m (28.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $707,000,  Roadway Improvement Cost: $1,166,000,  Total Project Cost: $1,979,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19071,  Location: 16.5 MI E SH 99 (Lat: 36.216208,  Lng: -96.340667),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: COWSKIN BAY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.837,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19072,  Location: 17.5 MI E SH 99 (Lat: 36.216072,  Lng: -96.322822),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: 296TH W.AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.463,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 19083,  Location: 19.5 MI E SH 99 (Lat: 36.209167,  Lng: -96.290097),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: KEYSTONE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.682,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.38m (34.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $827,000,  Roadway Improvement Cost: $1,364,000,  Total Project Cost: $2,314,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20369,  Location: .6E 1N .8E OF TERLTON (Lat: 36.202717,  Lng: -96.466725),  Route carried "on" structure: County highway E0560,  Year Built: 1983,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27174,  Location: 54.64 (Lat: 36.218514,  Lng: -96.410572),  Route carried "on" structure: Other road N3670,  Year Built: 1973,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,600 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 13,760 (year 2040),  Design Load: HS 20,  Features Intersected: CO. RD. N3670 UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.894,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 26.5m (86.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 32.3m (106.0ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27175,  Location: 57.51 (Lat: 36.219800,  Lng: -96.462831),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,600 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 13,760 (year 2040),  Design Load: HS 20,  Features Intersected: CO. RD. UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.243,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 33.5m (109.9ft)

Condition: Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 31951,  Location: .3 S PAWNEE C/L (Lat: 36.159167,  Lng: -96.400556),  Route carried "on" structure: State highway 48,  Year Built: 2019,  Status: Open,  Structure Length: 24.43m (80.15ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,700 (year 2040),  Design Load: HL 93,  Features Intersected: CIMMARON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.193,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 36.8m (120.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18519,  Location: 3 MI'S W JCT SH 48 (Lat: 36.219781,  Lng: -96.446108),  Route carried "under" structure: Other road 412,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 8,600 (year 2020),  Truck Traffic: 25%,  Features Intersected: CIMARRON TP UNDER,  Facility Carried by Structure: CO. RD. N3680
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 33.742,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 18747,  Location: 3.8 MI N CREEK CO (Lat: 36.217411,  Lng: -96.392553),  Route carried "under" structure: State highway 48,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 2,800 (year 2020),  Truck Traffic: 15%,  Features Intersected: S.H. 48 UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 6.210,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 19033,  Location: 18.5 MI E SH 99 (Lat: 36.216339,  Lng: -96.305078),  Route carried "under" structure: County highway ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: CO. RD. UNDER,  Facility Carried by Structure: U.S. 64
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 30.056,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 19034,  Location: 18.5 MI E SH 99 (Lat: 36.216033,  Lng: -96.305081),  Route carried "under" structure: County highway ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: CO. RD. UNDER,  Facility Carried by Structure: U.S. 64
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 30.056,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 19038,  Location: 14.0 MI E SH 99 (Lat: 36.217086,  Lng: -96.386475),  Route carried "under" structure: US 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 16%,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 22.623,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 19039,  Location: 14.0 MI E SH 99 (Lat: 36.216814,  Lng: -96.386292),  Route carried "under" structure: US 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 16%,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 22.655,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 19065,  Location: 21.3 MI E SH 99 (Lat: 36.186808,  Lng: -96.271206),  Route carried "under" structure: US 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: BEAR GLEN RD.
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 55.828,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 1907,  Location: 16.0 MI E SH 99 (Lat: 36.216283,  Lng: -96.349461),  Route carried "under" structure: US 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: WESTPORT RD.
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 26.050,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 19071,  Location: 16.5 MI E SH 99 (Lat: 36.216208,  Lng: -96.340667),  Route carried "under" structure: US 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: COWSKIN BAY RD.
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 43.192,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 19072,  Location: 17.5 MI E SH 99 (Lat: 36.216072,  Lng: -96.322822),  Route carried "under" structure: US 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: 296TH W.AVE.
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 28.463,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 19083,  Location: 19.5 MI E SH 99 (Lat: 36.209167,  Lng: -96.290097),  Route carried "under" structure: US 64,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 64 UNDER,  Facility Carried by Structure: KEYSTONE RD.
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 50.986,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 27174,  Location: 54.64 (Lat: 36.218514,  Lng: -96.410572),  Route carried "under" structure: County highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: CO. RD. N3670 UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 36.894,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 6.1m (20.0ft)

Find on map >>   Show street view

Structure Number: 27175,  Location: 57.51 (Lat: 36.219800,  Lng: -96.462831),  Route carried "under" structure: County highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Features Intersected: CO. RD. UNDER,  Facility Carried by Structure: CIMARRON TP
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 32.243,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 6.1m (20.0ft)

Discuss Westport, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.