Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for White Hall, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 302ft / 92.1mTotal length
  • $27,866,000Total costs
  • 44,400Total average daily traffic
  • 5,276Total average daily truck traffic
  • 59,625Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for White Hall
  • No street view available for this location

New bridges in White Hall, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41940-1949
  • 11960-1969
  • 51970-1979
  • 12020-2022
Average Bridge Daily Traffic in White Hall, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 16.7%Good
  • 58.3%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 8.3%Good
  • 75.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 41.7%Good
  • 41.7%Satisfactory
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 58.3%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 292,  Location: BROAD ST 400'E OF US 11 (Lat: 34.263200,  Lng: -85.862100),  Route carried "on" structure: City street ,  Year Built: 1925,  Status: Posted for load,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 70 (year 2021),  Average Future Daily Traffic: 90 (year 2041),  Design Load: H 10,  Features Intersected: LITTLE WILLS CREEK,  Facility Carried by Structure: BROAD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.3m (10.8ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $343,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $377,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2918,  Location: 5.3 MI. W. OF LOWNDESBORO (Lat: 32.265781,  Lng: -86.692128),  Route carried "on" structure: US 80,  Year Built: 1946,  Status: Closed,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: H 20,  Features Intersected: BIG SWAMP CREEK RELIEF 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.851,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $1,394,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $1,533,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2919,  Location: 5.0 MI. W. OF LOWNDESBORO (Lat: 32.264500,  Lng: -86.688283),  Route carried "on" structure: US 80,  Year Built: 1946,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: H 20,  Features Intersected: BIG SWAMP CREEK RELIEF 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.244,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,394,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $1,533,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 292,  Location: 4.7 MI. W. OF LOWNDESBORO (Lat: 32.262872,  Lng: -86.683306),  Route carried "on" structure: US 80,  Year Built: 1946,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: H 20,  Features Intersected: BIG SWAMP CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.747,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: December 2021,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,310,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2921,  Location: 4.5 MI. W. OF LOWNDESBORO (Lat: 32.261878,  Lng: -86.680203),  Route carried "on" structure: US 80,  Year Built: 1946,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: H 20,  Features Intersected: BIG SWAMP CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.064,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,310,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7028,  Location: 2MI EAST OF CO23 CO40 INT (Lat: 32.328158,  Lng: -86.675808),  Route carried "on" structure: County highway 40,  Year Built: 1960,  Status: Posted for load,  Structure Length: 4.14m (13.58ft),  Average Daily Traffic: 610 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 650 (year 2035),  Design Load: H 20,  Features Intersected: CYPRESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $804,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $884,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11603,  Location: 5.5 MI.W.OF LOWNDESBORO (Lat: 32.266839,  Lng: -86.694075),  Route carried "on" structure: US 80,  Year Built: 1976,  Status: Open,  Structure Length: 18.01m (59.09ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: HS 20,  Features Intersected: BIG SWAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.516,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 15,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.69m (61.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $5,383,000,  Roadway Improvement Cost: $538,000,  Total Project Cost: $5,921,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11604,  Location: 5.3 MI. W. OF LOWNDESBORO (Lat: 32.266158,  Lng: -86.691903),  Route carried "on" structure: US 80,  Year Built: 1976,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: HS 20,  Features Intersected: BIG SWAMP CREEK RELIEF 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.851,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,091,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $2,300,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11605,  Location: 5.0 MI. W. OF LOWNDESBORO (Lat: 32.264878,  Lng: -86.687986),  Route carried "on" structure: US 80,  Year Built: 1976,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: HS 20,  Features Intersected: BIG SWAMP CREEK RELIEF 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.232,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,675,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $2,943,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11606,  Location: 4.7 MI. W. OF LOWNDESBORO (Lat: 32.263242,  Lng: -86.683083),  Route carried "on" structure: US 80,  Year Built: 1976,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: HS 20,  Features Intersected: BIG SWAMP CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.747,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,786,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $1,965,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11607,  Location: 4.5 MI. W. OF LOWNDESBORO (Lat: 32.262364,  Lng: -86.679925),  Route carried "on" structure: US 80,  Year Built: 1976,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 4,275 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,590 (year 2033),  Design Load: HS 20,  Features Intersected: BIG SWAMP CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.064,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,091,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $2,300,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21427,  Location: 5.5mi.W of Lowndesborrow (Lat: 34.621992,  Lng: -86.587492),  Route carried "on" structure: US 80,  Year Built: 2020,  Status: Open,  Structure Length: 17.98m (58.99ft),  Average Daily Traffic: 5,245 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,575 (year 2039),  Design Load: HL 93,  Features Intersected: Big Swamp Creek
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 173.515,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 58.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.66m (61.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,991,000,  Roadway Improvement Cost: $499,000,  Total Project Cost: $5,490,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss White Hall, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.