Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Whitesboro, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 125ft / 38.5mTotal length
  • $26,256,000Total costs
  • 110,614Total average daily traffic
  • 12,840Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Whitesboro
  • No street view available for this location

New bridges in Whitesboro, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 41950-1959
  • 31960-1969
  • 11970-1979
  • 11980-1989
Reconstructed bridges in Whitesboro, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Whitesboro, NY
Average Bridge Truck Traffic in Whitesboro, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Good
  • 33.3%Satisfactory
  • 33.3%Fair
  • 16.7%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 16.7%Fair
  • 16.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
  • 16.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 1009919,  Location: .4 MI W JCT SH 69 & SH 5A (Lat: 43.115606,  Lng: -75.288094),  Route carried "on" structure: State highway 69,  Year Built: 1937,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 14,809 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,989 (year 2040),  Design Load: H 20,  Features Intersected: SAUQUOIT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.616,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,202,000,  Roadway Improvement Cost: $704,000,  Total Project Cost: $1,906,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1051429,  Location: JCT RTS 5A+69 (Lat: 43.115383,  Lng: -75.287442),  Route carried "on" structure: State highway 5A,  Year Built: 1969,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 3,032 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,046 (year 2040),  Design Load: HS 20,  Features Intersected: 69 6926023111 Westbound,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 17.9m (58.7ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,727,000,  Roadway Improvement Cost: $1,011,000,  Total Project Cost: $2,739,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105198,  Location: 02MI W JCT RTS 69+5A (Lat: 43.114839,  Lng: -75.289594),  Route carried "on" structure: Ramp State highway ,  Year Built: 1970,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 3,285 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,300 (year 2040),  Design Load: HS 20,  Features Intersected: SAUQUOIT CREEK,  Facility Carried by Structure: RAMP FM 69 TO 5A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $908,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 108001,  Location: 1 mi South of NYS Rte 49 (Lat: 43.127411,  Lng: -75.283233),  Route carried "on" structure: State highway 922,  Year Built: 1980,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 10,519 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,778 (year 2040),  Design Load: H 20,  Features Intersected: Equalizer
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.158,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: December 2017,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $542,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220591,  Location: IN WHITESBORO (Lat: 43.124672,  Lng: -75.288778),  Route carried "on" structure: State highway 922A,  Year Built: 1968,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 10,519 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,778 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $970,000,  Roadway Improvement Cost: $568,000,  Total Project Cost: $1,539,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5009929,  Location: 3.0MI W INT 31 UTICA NY (Lat: 43.129800,  Lng: -75.300736),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 19,195 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 22,116 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 69
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.252,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 32.7m (107.3ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,568,000,  Roadway Improvement Cost: $1,504,000,  Total Project Cost: $4,073,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5512999,  Location: 5.24 MI W INT 31 ON I-90 (Lat: 43.130708,  Lng: -75.298006),  Route carried "on" structure: Interstate 90,  Year Built: 1955,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 17.62m (57.81ft),  Average Daily Traffic: 19,195 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 22,116 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MAIN ST EXTENSION, CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.477,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 34.4m (112.9ft),  Out-to-Out Width: 34.7m (113.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.61m (57.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $9,176,000,  Roadway Improvement Cost: $5,373,000,  Total Project Cost: $14,549,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1051429,  Location: JCT RTS 5A+69 (Lat: 43.115383,  Lng: -75.287442),  Route carried "under" structure: State highway 69,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 14,700 (year 1970),  Features Intersected: 69 6926023111 Westbound,,  Facility Carried by Structure: RTE 5A
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 58.905,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 5009929,  Location: 3.0MI W INT 31 UTICA NY (Lat: 43.129800,  Lng: -75.300736),  Route carried "under" structure: State highway 69,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 14,700 (year 1971),  Features Intersected: RTE 69,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 5512999,  Location: 5.24 MI W INT 31 ON I-90 (Lat: 43.130708,  Lng: -75.298006),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 660 (year 2019),  Truck Traffic: 7%,  Features Intersected: MAIN ST EXTENSION, CSX,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 7.04m (23.10ft),  Kilometerpoint: 0.193,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Discuss Whitesboro, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.