Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Whitney Point, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 344ft / 105mTotal length
  • $56,400,000Total costs
  • 158,876Total average daily traffic
  • 23,287Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Whitney Point
  • No street view available for this location

New bridges in Whitney Point, NY - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 171960-1969
  • 11990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Whitney Point, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in Whitney Point, NY
Average Bridge Truck Traffic in Whitney Point, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Very good
  • 70.6%Good
  • 17.6%Satisfactory
  • 5.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 5.9%Very good
  • 76.5%Good
  • 5.9%Satisfactory
  • 5.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 17.6%Very good
  • 64.7%Good
  • 5.9%Satisfactory
  • 5.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 25.0%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 100832,  Location: JCT US11 & TIOUGHNIOGA RV (Lat: 42.331008,  Lng: -75.967778),  Route carried "on" structure: US 11,  Year Built: 1947,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 8,797 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,880 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.348,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.18m (33.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $5,191,000,  Roadway Improvement Cost: $3,040,000,  Total Project Cost: $8,230,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101858,  Location: JCT RTS 26 + I-81 (Lat: 42.320878,  Lng: -75.971400),  Route carried "on" structure: State highway 26,  Year Built: 1965,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 2,988 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,016 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 81I 81I91013157, RTE I81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.183,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.55m (24.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,207,000,  Roadway Improvement Cost: $1,292,000,  Total Project Cost: $3,499,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101859,  Location: .4 MI N JCT SH 26 & I81 (Lat: 42.325831,  Lng: -75.967653),  Route carried "on" structure: State highway 26,  Year Built: 1965,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 8,851 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,935 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NY SUSQUEHNNA & WESTERN,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.795,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.18m (20.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,366,000,  Roadway Improvement Cost: $800,000,  Total Project Cost: $2,165,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 10186,  Location: JCT RTE 26+TIOUGHNIOGA R (Lat: 42.329194,  Lng: -75.965100),  Route carried "on" structure: State highway 26,  Year Built: 2017,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 6,617 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,658 (year 2040),  Design Load: HL 93,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.374,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.5m (44.3ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 8.13m (26.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,982,000,  Roadway Improvement Cost: $2,332,000,  Total Project Cost: $6,313,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10305,  Location: 3.3 MI SE JCT 79 & 206 (Lat: 42.302122,  Lng: -75.912842),  Route carried "on" structure: State highway 79,  Year Built: 2007,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,233 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,726 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BULL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.414,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $695,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103051,  Location: 0.6MI SE JCT RTS 79 + 206 (Lat: 42.324722,  Lng: -75.954811),  Route carried "on" structure: State highway 79,  Year Built: 2007,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,233 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,726 (year 2040),  Design Load: HL 93,  Features Intersected: MOSS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.775,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.4m (60.4ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 81.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $852,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103123,  Location: 2.5 MI N EXIT 7 OF I81 (Lat: 42.286931,  Lng: -75.924642),  Route carried "on" structure: Other road ,  Year Built: 1969,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 176 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 246 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RTE I81,  Facility Carried by Structure: JOYNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.269,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.35m (14.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,017,000,  Roadway Improvement Cost: $595,000,  Total Project Cost: $1,612,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1031241,  Location: 1.0MI S JCT RTS I-81 + 26 (Lat: 42.313858,  Lng: -75.954472),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 12,949 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 18,128 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: PEASE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.052,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,294,000,  Roadway Improvement Cost: $758,000,  Total Project Cost: $2,052,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031242,  Location: 1.0MI S JCT RTS I-81 + 26 (Lat: 42.314008,  Lng: -75.954167),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 10,676 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 12,715 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: PEASE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.052,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,294,000,  Roadway Improvement Cost: $758,000,  Total Project Cost: $2,052,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031261,  Location: 0.9MI N JCT RTS I-81 + 26 (Lat: 42.333728,  Lng: -75.978978),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 8,018 (year 2009),  Truck Traffic: 36%,  Average Future Daily Traffic: 11,225 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: NY SUSQ & WESTERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.367,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,857,000,  Roadway Improvement Cost: $1,087,000,  Total Project Cost: $2,944,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1031262,  Location: 0.9MI N JCT RTS I-81 + 26 (Lat: 42.333572,  Lng: -75.978769),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 6,935 (year 2019),  Truck Traffic: 30%,  Average Future Daily Traffic: 8,259 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NY SUSQ & WESTERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.367,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,861,000,  Roadway Improvement Cost: $1,090,000,  Total Project Cost: $2,951,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1031271,  Location: JCT I-81 + TIOUGHNIOGA R (Lat: 42.336589,  Lng: -75.978725),  Route carried "on" structure: Interstate 81,  Year Built: 2008,  Status: Open,  Structure Length: 11.13m (36.52ft),  Average Daily Traffic: 8,018 (year 2009),  Truck Traffic: 36%,  Average Future Daily Traffic: 11,225 (year 2029),  Design Load: HL 93,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.608,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 54.4m (178.5ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.12m (36.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $4,125,000,  Roadway Improvement Cost: $2,415,000,  Total Project Cost: $6,540,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031272,  Location: JCT I-81 + TIOUGHNIOGA R (Lat: 42.335772,  Lng: -75.978572),  Route carried "on" structure: Interstate 81,  Year Built: 2009,  Status: Open,  Structure Length: 11.13m (36.52ft),  Average Daily Traffic: 6,935 (year 2019),  Truck Traffic: 30%,  Average Future Daily Traffic: 8,259 (year 2040),  Design Load: HL 93,  Features Intersected: TIOUGHNIOGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.640,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 54.3m (178.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.12m (36.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $4,101,000,  Roadway Improvement Cost: $2,402,000,  Total Project Cost: $6,503,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1060751,  Location: 0.7MI N JCT RTS I-81 + 26 (Lat: 42.331194,  Lng: -75.979206),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 8,018 (year 2009),  Truck Traffic: 36%,  Average Future Daily Traffic: 11,225 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: OLD ROUTE 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.093,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,255,000,  Roadway Improvement Cost: $735,000,  Total Project Cost: $1,990,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1060752,  Location: 0.7MI N JCT RTS I-81 + 26 (Lat: 42.331092,  Lng: -75.978992),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 6,935 (year 2019),  Truck Traffic: 30%,  Average Future Daily Traffic: 8,259 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: OLD ROUTE 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.093,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,369,000,  Roadway Improvement Cost: $802,000,  Total Project Cost: $2,171,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109407,  Location: 2.5 MI N EXIT 7 OF I81 (Lat: 42.286878,  Lng: -75.925981),  Route carried "on" structure: Other road ,  Year Built: 1969,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 176 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 246 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: RTE I81,  Facility Carried by Structure: JOYNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,019,000,  Roadway Improvement Cost: $597,000,  Total Project Cost: $1,616,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222531,  Location: HAMLET OF ITASKA (Lat: 42.298697,  Lng: -75.908300),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 449 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 629 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: TIOUGHNIOGA RIVER,  Facility Carried by Structure: BARKER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $2,658,000,  Roadway Improvement Cost: $1,557,000,  Total Project Cost: $4,215,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101858,  Location: JCT RTS 26 + I-81 (Lat: 42.320878,  Lng: -75.971400),  Route carried "under" structure: Interstate 81,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 12,600 (year 1972),  Features Intersected: 81I 81I91013157, RTE I81,  Facility Carried by Structure: RTE 26
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 120.675,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.1m (52.8ft)

Find on map >>   Show street view

Structure Number: 103123,  Location: 2.5 MI N EXIT 7 OF I81 (Lat: 42.286931,  Lng: -75.924642),  Route carried "under" structure: Interstate 81,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 23,636 (year 2000),  Features Intersected: RTE I81,  Facility Carried by Structure: JOYNER ROAD
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 19.437,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.7m (54.8ft)

Find on map >>   Show street view

Structure Number: 1031241,  Location: 1.0MI S JCT RTS I-81 + 26 (Lat: 42.313858,  Lng: -75.954472),  Route carried "under" structure: Other road ,  Year Built: 1969,  Structure Length: 0. m,  Features Intersected: PEASE HILL ROAD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 1.818,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 1031242,  Location: 1.0MI S JCT RTS I-81 + 26 (Lat: 42.314008,  Lng: -75.954167),  Route carried "under" structure: Other road ,  Year Built: 1969,  Structure Length: 0. m,  Features Intersected: PEASE HILL ROAD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 3.234,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 1060751,  Location: 0.7MI N JCT RTS I-81 + 26 (Lat: 42.331194,  Lng: -75.979206),  Route carried "under" structure: Bypass County highway ,  Year Built: 1969,  Structure Length: 0. m,  Features Intersected: OLD ROUTE 26,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 1060752,  Location: 0.7MI N JCT RTS I-81 + 26 (Lat: 42.331092,  Lng: -75.978992),  Route carried "under" structure: Bypass County highway ,  Year Built: 1969,  Structure Length: 0. m,  Features Intersected: OLD ROUTE 26,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.4m (53.8ft)

Find on map >>   Show street view

Structure Number: 109407,  Location: 2.5 MI N EXIT 7 OF I81 (Lat: 42.286878,  Lng: -75.925981),  Route carried "under" structure: Interstate 81,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 23,636 (year 2000),  Features Intersected: RTE I81,  Facility Carried by Structure: JOYNER ROAD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 19.308,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.3m (56.8ft)

Discuss Whitney Point, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.