Bridge Statistics for Wilder, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 56ft / 17.5mTotal length
  • $802,000Total costs
  • 20,175Total average daily traffic
  • 2,117Total average daily truck traffic
  • 30,263Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wilder
  • No street view available for this location

New bridges in Wilder, ID - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 11960-1969
  • 21970-1979
  • 11980-1989
  • 61990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Wilder, ID
Average Bridge Truck Traffic in Wilder, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.3%Very good
  • 25.0%Good
  • 62.5%Satisfactory
  • 6.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 18.8%Good
  • 68.8%Satisfactory
  • 6.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 50.0%Good
  • 31.3%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 31.3%Very good
  • 56.3%Good
  • 6.3%Satisfactory
Find on map >>   Show street view

Structure Number: 12175,  Location: 0.7 SE WILDER SCL (Lat: 43.668778,  Lng: -116.899417),  Route carried "on" structure: State highway 19,  Year Built: 1976,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 6,900 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,350 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.611,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: IB0,  Subroute: 5),  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.6m (28.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18055,  Location: WILDER SCL (Lat: 43.671861,  Lng: -116.912000),  Route carried "on" structure: US 95,  Year Built: 1956,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 6,600 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,900 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.201,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $316,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1806,  Location: 4 N. WILDER (Lat: 43.730389,  Lng: -116.915889),  Route carried "on" structure: US 95,  Year Built: 1964,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,250 (year 2039),  Design Load: HS 20,  Features Intersected: RIVERSIDE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.740,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26731,  Location: 3.8 N. WILDER (Lat: 43.730472,  Lng: -116.911778),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 375 (year 2039),  Design Load: HS 20,  Features Intersected: RIVERSIDE CANAL,  Facility Carried by Structure: RUDD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.945,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $98,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2678,  Location: 0.5 N. 1.2 W. WILDER (Lat: 43.683250,  Lng: -116.937278),  Route carried "on" structure: County highway ,  Year Built: 1935,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 20 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 30 (year 2039),  Design Load: H 10,  Features Intersected: GOLDEN GATE CANAL,  Facility Carried by Structure: PENNY LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.315,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $320,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2689,  Location: 2.8 N. 1.4 E. WILDER (Lat: 43.716211,  Lng: -116.883439),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 75 (year 2039),  Design Load: H 15,  Features Intersected: RIVERSIDE CANAL,  Facility Carried by Structure: BLUFF LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.960,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27051,  Location: 2.4 S. 2.0 E. WILDER (Lat: 43.641528,  Lng: -116.871750),  Route carried "on" structure: County highway 3790,  Year Built: 1998,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 220 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 330 (year 2039),  Design Load: HS 20,  Features Intersected: LOW LINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.595,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27111,  Location: 0.2 S. 1.0 W. WILDER (Lat: 43.673531,  Lng: -116.931931),  Route carried "on" structure: County highway 3031,  Year Built: 1991,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 32%,  Average Future Daily Traffic: 375 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.023,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27136,  Location: 2.6 N. 2.0 W. WILDER (Lat: 43.713778,  Lng: -116.952000),  Route carried "on" structure: County highway 3742,  Year Built: 1993,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 80 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 120 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.724,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $45,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $68,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27151,  Location: 4 N. 3 W. WILDER (Lat: 43.706972,  Lng: -116.942111),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 375 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: GOLDEN GATE CANAL,  Facility Carried by Structure: RODEO LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.826,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27165,  Location: 1.5 N. 1.2 W. WILDER (Lat: 43.697917,  Lng: -116.938250),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 20 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 30 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL,  Facility Carried by Structure: FERN LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.265,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27216,  Location: 0.6 S. 2.0 E. WILDER (Lat: 43.666500,  Lng: -116.871750),  Route carried "on" structure: County highway 3790,  Year Built: 1992,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 220 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 330 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.380,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Excellent,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27231,  Location: 2.5 S. 1.5 E. WILDER (Lat: 43.639667,  Lng: -116.883583),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 25 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 38 (year 2039),  Design Load: HS 20,  Features Intersected: DEER FLAT CANAL,  Facility Carried by Structure: BOEHNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.464,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27256,  Location: 0.2 S. 0.5 W. WILDER (Lat: 43.672139,  Lng: -116.921972),  Route carried "on" structure: County highway 3839,  Year Built: 2000,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 200 (year 2019),  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.680,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27391,  Location: 3.8 N 1.1 E WILDER (Lat: 43.730694,  Lng: -116.889111),  Route carried "on" structure: County highway 3866,  Year Built: 2010,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 790 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,185 (year 2039),  Design Load: HL 93,  Features Intersected: DIXIE SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.062,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27425,  Location: 1.1 W. WILDER (Lat: 43.675881,  Lng: -116.934319),  Route carried "on" structure: County highway 3798,  Year Built: 1990,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,200 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.435,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous