Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wind Ridge, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 167ft / 51.4mTotal length
  • $1,305,000Total costs
  • 12,516Total average daily traffic
  • 1,945Total average daily truck traffic
  • 13,473Total future (year 1991) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wind Ridge
  • No street view available for this location

New bridges in Wind Ridge, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 31910-1919
  • 41930-1939
  • 21940-1949
  • 21950-1959
  • 91960-1969
  • 31990-1999
  • 12000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Wind Ridge, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 41950-1959
  • 01960-1969
  • 21970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Truck Traffic in Wind Ridge, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.0%Very good
  • 13.0%Good
  • 56.5%Satisfactory
  • 13.0%Fair
  • 4.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.0%Very good
  • 12.0%Good
  • 36.0%Satisfactory
  • 32.0%Fair
  • 4.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.0%Very good
  • 12.0%Good
  • 40.0%Satisfactory
  • 32.0%Fair
  • 8.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.3%Very good
  • 6.9%Good
  • 24.1%Satisfactory
  • 44.8%Fair
  • 13.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Excellent
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 18072,  Location: RICHHILL TOWNSHIP (Lat: 39.890775,  Lng: -80.477011),  Route carried "on" structure: State highway 21,  Year Built: 1930,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,728 (year 2021),  Truck Traffic: 31%,  Average Future Daily Traffic: 1,937 (year 2032),  Design Load: H 20,  Features Intersected: SOUTH FORK WHEELING CK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.080,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $279,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18073,  Location: RICHHILL TOWNSHIP (Lat: 39.891956,  Lng: -80.475828),  Route carried "on" structure: State highway 21,  Year Built: 1930,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 1,728 (year 2021),  Truck Traffic: 31%,  Average Future Daily Traffic: 1,937 (year 2032),  Design Load: H 20,  Features Intersected: NORTH FORK WHEELING CK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.080,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $408,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18334,  Location: ALEPP0 TOWNSHIP (Lat: 39.847264,  Lng: -80.457086),  Route carried "on" structure: State highway ,  Year Built: 1941,  Year Reconstructed: 1956,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 286 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 649 (year 2032),  Design Load: HS 20,  Features Intersected: BLACKS CREEK,  Facility Carried by Structure: SR 3001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.193,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18341,  Location: RICHHILL TOWNSHIP (Lat: 39.904781,  Lng: -80.487967),  Route carried "on" structure: State highway ,  Year Built: 1960,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 110 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 193 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DUNKARD FORK WHEELING CK,  Facility Carried by Structure: SR 3001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.035,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 18342,  Location: RICHHILL TOWNSHIP (Lat: 39.917622,  Lng: -80.485008),  Route carried "on" structure: State highway ,  Year Built: 1966,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 110 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 193 (year 2032),  Design Load: HS 20,  Features Intersected: CRABAPPLE CREEK,  Facility Carried by Structure: SR 3001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.330,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18343,  Location: RICHILL TOWNSHIP (Lat: 39.919094,  Lng: -80.475700),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 237 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 135 (year 2032),  Design Load: HS 20,  Features Intersected: CRABAPPLE CREEK,  Facility Carried by Structure: SR 3001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.099,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 18344,  Location: RICHHILL TOWNSHIP (Lat: 39.920003,  Lng: -80.474928),  Route carried "on" structure: State highway ,  Year Built: 1945,  Year Reconstructed: 1962,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 173 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 170 (year 2032),  Design Load: HS 20,  Features Intersected: CRABAPPLE CREEK,  Facility Carried by Structure: SR 3001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.165,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18347,  Location: RICHHILL TOWNSHIP (Lat: 39.860906,  Lng: -80.407344),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 152 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 458 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LONG RUN,  Facility Carried by Structure: SR 3005
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.086,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 18349,  Location: RICHHILL TOWNSHIP (Lat: 39.867806,  Lng: -80.415203),  Route carried "on" structure: State highway ,  Year Built: 1961,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 313 (year 2022),  Truck Traffic: 17%,  Average Future Daily Traffic: 585 (year 2032),  Design Load: HL 93,  Features Intersected: NORTH FORK WHEELING CK.,  Facility Carried by Structure: SR 3005
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.831,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18362,  Location: JACKSON TOWNSHIP (Lat: 39.863492,  Lng: -80.386017),  Route carried "on" structure: State highway ,  Year Built: 1910,  Year Reconstructed: 1962,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 46 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 95 (year 2032),  Design Load: HS 20,  Features Intersected: WEBSTER RUN,  Facility Carried by Structure: SR 3007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.326,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $54,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 18365,  Location: RICHHILL TOWNSHIP (Lat: 39.874047,  Lng: -80.408250),  Route carried "on" structure: State highway ,  Year Built: 1915,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 378 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 52 (year 2032),  Design Load: H 20,  Features Intersected: WHITETHORN RUN,  Facility Carried by Structure: SR 3007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.110,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $126,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18367,  Location: RICHHILL TOWNSHIP (Lat: 39.892083,  Lng: -80.401856),  Route carried "on" structure: State highway ,  Year Built: 1916,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 41 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 27 (year 2032),  Design Load: HS 20,  Features Intersected: WHITETHORN RUN,  Facility Carried by Structure: SR 3007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.120,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 18417,  Location: RICHHILL TOWNSHIP (Lat: 39.860436,  Lng: -80.474025),  Route carried "on" structure: State highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 93 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 192 (year 2032),  Design Load: HS 20,  Features Intersected: SOUTH FORK WHEELING CK.,  Facility Carried by Structure: SR 3016
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.475,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18425,  Location: RICHHILL TOWNSHIP (Lat: 39.878517,  Lng: -80.428053),  Route carried "on" structure: State highway ,  Year Built: 1938,  Year Reconstructed: 1951,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 94 (year 2021),  Truck Traffic: 24%,  Average Future Daily Traffic: 403 (year 2032),  Design Load: H 20,  Features Intersected: POLEN RUN,  Facility Carried by Structure: SR 3022
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.038,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1843,  Location: RICHHILL TOWNSHIP (Lat: 39.917639,  Lng: -80.485811),  Route carried "on" structure: State highway ,  Year Built: 1956,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 241 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 119 (year 2032),  Design Load: HS 20,  Features Intersected: DUNKARD FORK,  Facility Carried by Structure: SR 4003
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18431,  Location: RICHHILL TOWNSHIP (Lat: 39.919736,  Lng: -80.494089),  Route carried "on" structure: State highway ,  Year Built: 1960,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 121 (year 2022),  Truck Traffic: 24%,  Average Future Daily Traffic: 89 (year 2032),  Design Load: H 20,  Features Intersected: DUNKARD BR WHEELING CK,  Facility Carried by Structure: SR 4003
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.752,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18476,  Location: VILLAGE OF MCCRACKEN (Lat: 39.853539,  Lng: -80.476964),  Route carried "on" structure: City street T463,  Year Built: 1968,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 30 (year 1991),  Truck Traffic: 13%,  Average Future Daily Traffic: 30 (year 1991),  Design Load: HS 20,  Features Intersected: HEWITT RUN,  Facility Carried by Structure: TOWNSHIP ROAD 463
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18507,  Location: EAST OF GRAYSVILLE (Lat: 39.928761,  Lng: -80.381692),  Route carried "on" structure: City street T390,  Year Built: 1961,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 20 (year 1993),  Truck Traffic: 10%,  Average Future Daily Traffic: 30 (year 1992),  Design Load: HS 20,  Features Intersected: GRAYS FORK,  Facility Carried by Structure: TOWNSHIP ROAD 390
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35078,  Location: WEST FINLEY TOWNSHIP (Lat: 39.977778,  Lng: -80.433897),  Route carried "on" structure: State highway ,  Year Built: 1963,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 447 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 628 (year 2032),  Design Load: HS 20,  Features Intersected: ENLOW FORK WHEELING CK.,  Facility Carried by Structure: SR 3026
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.982,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $171,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 35089,  Location: RICHHILL & W. FINLEY TWP. (Lat: 39.968331,  Lng: -80.447611),  Route carried "on" structure: State highway ,  Year Built: 1938,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 469 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 349 (year 2032),  Design Load: H 15,  Features Intersected: ENLOW FORK WHEELING CK.,  Facility Carried by Structure: SR 3037
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35353,  Location: INTERSECTION W/T414 (Lat: 39.977906,  Lng: -80.446175),  Route carried "on" structure: City street T362,  Year Built: 1887,  Year Reconstructed: 2000,  Status: Posted for load,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 50 (year 2007),  Average Future Daily Traffic: 20 (year 2027),  Design Load: HS 15,  Features Intersected: WHEELING CREEK TRIB,  Facility Carried by Structure: T-414
Minimum Vertical Clearance: 2.77m (9.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.2m (10.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $117,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 399,  Location: GRAY TOWNSHIP (Lat: 39.925967,  Lng: -80.371025),  Route carried "on" structure: State highway 21,  Year Built: 1998,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 2,592 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,038 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: GRAYS FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.949,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018
Find on map >>   Show street view

Structure Number: 40381,  Location: RYERSON STATE PARK (Lat: 39.878483,  Lng: -80.428594),  Route carried "on" structure: City street T505,  Year Built: 1998,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 30 (year 1993),  Average Future Daily Traffic: 42 (year 2013),  Design Load: HL 93,  Features Intersected: NORT FK. OF WHEELING CK.,  Facility Carried by Structure: TWP RD 505
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 41213,  Location: MORRIS @ E.FINLEY TWP. (Lat: 39.978006,  Lng: -80.396342),  Route carried "on" structure: State highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 289 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 131 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: ENLOW FORK WHEELING CK.,  Facility Carried by Structure: SR 4013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.008,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 42148,  Location: AT SR 3022 INTERSECT (Lat: 39.891197,  Lng: -80.449700),  Route carried "on" structure: State lands road ,  Year Built: 1998,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 105 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 145 (year 2032),  Design Load: HS 20,  Features Intersected: N FORK WHEELING CREEK,  Facility Carried by Structure: DAY USE ACCESS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48755,  Location: 0.8 mi E from SR 4009 (Lat: 39.928006,  Lng: -80.377947),  Route carried "on" structure: State highway 21,  Year Built: 2014,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 2,592 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,649 (year 2036),  Design Load: HL 93,  Features Intersected: Grays Fork
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.949,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 53656,  Location: GRAY TOWNSHIP (Lat: 39.931036,  Lng: -80.385725),  Route carried "on" structure: Alternate County highway T880,  Year Built: 2016,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 20 (year 2015),  Average Future Daily Traffic: 25 (year 2036),  Design Load: HL 93,  Features Intersected: GRAYS FORK,  Facility Carried by Structure: Township Road 880
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54495,  Location: North of Nebo (Lat: 39.968314,  Lng: -80.447619),  Route carried "on" structure: City street T342,  Year Built: 2017,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 1 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 2 (year 2020),  Design Load: HL 93,  Features Intersected: Owens Run,  Facility Carried by Structure: T-342
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 67774,  Location: EAST OF GRAYSVILLE (Lat: 39.923656,  Lng: -80.367972),  Route carried "on" structure: City street T392,  Year Built: 2020,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 20 (year 2006),  Average Future Daily Traffic: 150 (year 2026),  Design Load: HL 93,  Features Intersected: Grays Fork,  Facility Carried by Structure: TOWNSHIP ROAD 392
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Discuss Wind Ridge, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.