Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Winlock, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 121ft / 37.4mTotal length
  • $14,846,000Total costs
  • 103,945Total average daily traffic
  • 18,397Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Winlock
  • No street view available for this location

New bridges in Winlock, WA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 61950-1959
  • 51970-1979
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Winlock, WA
Average Bridge Truck Traffic in Winlock, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 66.7%Good
  • 25.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 41.7%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 54.5%Very good
  • 18.2%Good
  • 9.1%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 3055A,  Location: 3.7 N JCT SR 5 (Lat: 46.500569,  Lng: -122.937283),  Route carried "on" structure: County highway 93006,  Year Built: 1945,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 2,052 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,706 (year 2039),  Design Load: HS 15,  Features Intersected: OLEQUA CR,  Facility Carried by Structure: HWY 603
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $666,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,333,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4485A,  Location: JCT I-5 (Lat: 46.475750,  Lng: -122.883556),  Route carried "on" structure: State highway 505,  Year Built: 1954,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 4,257 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,483 (year 2039),  Design Load: HS 20,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.731,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.31m (20.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,656,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $3,312,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 10411A,  Location: 3.0 N JCT SR 505 (Lat: 46.517917,  Lng: -122.876972),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 100 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 137 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-5,  Facility Carried by Structure: PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.06m (16.60ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $996,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $1,992,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80898,  Location: 0.5 SE EVELINE (Lat: 46.532486,  Lng: -122.928850),  Route carried "on" structure: County highway 30701,  Year Built: 1958,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 324 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 586 (year 2039),  Features Intersected: OLEQUA CREEK,  Facility Carried by Structure: ANTRIM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $312,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8173,  Location: 2.0 SE EVELINE (Lat: 46.518053,  Lng: -122.904450),  Route carried "on" structure: County highway 30501,  Year Built: 1972,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 581 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,050 (year 2039),  Design Load: HS 20,  Features Intersected: OLEQUA CREEK,  Facility Carried by Structure: SARGENT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $414,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $829,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82928,  Location: 1.0 W ST. URBAN (Lat: 46.517500,  Lng: -122.906875),  Route carried "on" structure: County highway 30170,  Year Built: 1951,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 606 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,095 (year 2039),  Features Intersected: OLEQUA CREEK,  Facility Carried by Structure: MINKLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $291,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83943,  Location: 1.6 W WINLOCK (Lat: 46.497289,  Lng: -122.969933),  Route carried "on" structure: County highway 38329,  Year Built: 1958,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 235 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 425 (year 2039),  Design Load: H 15,  Features Intersected: KING CREEK,  Facility Carried by Structure: KING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $298,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84446,  Location: S. C/L WINLOCK (Lat: 46.481389,  Lng: -122.945667),  Route carried "on" structure: County highway 37100,  Year Built: 1957,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 49 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 89 (year 2037),  Design Load: H 15,  Features Intersected: OLEQUA CREEK,  Facility Carried by Structure: HINING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $760,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84451,  Location: 0.26 S JCT SR 603 (Lat: 46.488181,  Lng: -122.941033),  Route carried "on" structure: County highway 93000,  Year Built: 1928,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 1,887 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,409 (year 2038),  Design Load: H 15,  Features Intersected: OLEQUA CREEK,  Facility Carried by Structure: WINLOCK VADER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.54m (11.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,206,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8547,  Location: 0.02 W SR 603 (Lat: 46.500000,  Lng: -122.940000),  Route carried "on" structure: City street 1455,  Year Built: 1973,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 1,555 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,893 (year 2036),  Design Load: HS 20,  Features Intersected: OLEQUA CREEK,  Facility Carried by Structure: WALNUT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $576,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,152,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85475,  Location: 0.5 NW WINLOCK (Lat: 46.498056,  Lng: -122.945722),  Route carried "on" structure: County highway 14550,  Year Built: 1970,  Status: Posted for load-capacity,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 302 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 562 (year 2036),  Design Load: H 15,  Features Intersected: KING CREEK,  Facility Carried by Structure: TENNESSEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $1,560,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 88343,  Location: 3.8 SW WINLOCK (Lat: 46.473250,  Lng: -122.959417),  Route carried "on" structure: County highway 37250,  Year Built: 2009,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 28 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 51 (year 2038),  Design Load: HS 20,  Features Intersected: CURTIS CREEK,  Facility Carried by Structure: ANDERSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $229,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 89042,  Location: 0.02 W SR 603 (Lat: 46.493278,  Lng: -122.939194),  Route carried "on" structure: City street 93193,  Year Built: 2018,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 1,199 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,297 (year 2039),  Design Load: HL 93,  Features Intersected: OLEQUA CREEK,  Facility Carried by Structure: FIR STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $786,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $1,572,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4485A,  Location: JCT SR 505 (Lat: 46.475750,  Lng: -122.883556),  Route carried "under" structure: Interstate 5,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 42,758 (year 2019),  Truck Traffic: 19%,  Features Intersected: I-5
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 102.065,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 10411A,  Location: 3.0 N JCT SR 505 (Lat: 46.517917,  Lng: -122.876972),  Route carried "under" structure: Interstate 5,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 48,012 (year 2019),  Truck Traffic: 19%,  Features Intersected: I-5,  Facility Carried by Structure: PARK RD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 106.812,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Discuss Winlock, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.