  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 417ft / 127mTotal length
  • $96,358,000Total costs
  • 275,673Total average daily traffic
  • 38,969Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Woodland
  • No street view available for this location

New bridges in Woodland, WA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 61960-1969
  • 31970-1979
  • 11980-1989
Average Bridge Daily Traffic in Woodland, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 62.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 87.5%Good
  • 12.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 2559A,  Location: 5.8 N JCT SR 501 (Lat: 45.888736,  Lng: -122.732633),  Route carried "on" structure: Interstate 5,  Year Built: 1940,  Status: Posted for load,  Structure Length: 39.93m (131.00ft),  Average Daily Traffic: 41,714 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 60,401 (year 2039),  Design Load: H 15,  Features Intersected: LEWIS RIVER
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 31.913,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Navigation Control: Yes ( Vertical Clearance: 9.8m (32.2ft), Horizontal Clearance: 65.8m (215.9ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 98.8m (324.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 39.93m (131.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $15,556,000,  Roadway Improvement Cost: $3,111,000,  Total Project Cost: $31,112,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4885A,  Location: 1.6 N JCT SR 503 (Lat: 45.927539,  Lng: -122.756017),  Route carried "on" structure: Interstate 5,  Year Built: 1955,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 33,399 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 44,621 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: LOG DUMP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.564,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,123,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $2,246,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7064A,  Location: 0.4 N CLARK CO (Lat: 45.905556,  Lng: -122.742194),  Route carried "on" structure: Interstate 5,  Year Built: 1963,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 32,604 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 43,558 (year 2039),  Design Load: HS 20,  Features Intersected: SR 503
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.925,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,882,000,  Roadway Improvement Cost: $376,000,  Total Project Cost: $3,763,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7064B,  Location: 0.4 N CLARK CO (Lat: 45.905472,  Lng: -122.742389),  Route carried "on" structure: Interstate 5,  Year Built: 1963,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 32,604 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 43,558 (year 2039),  Design Load: HS 20,  Features Intersected: SR 503
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.925,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,882,000,  Roadway Improvement Cost: $376,000,  Total Project Cost: $3,763,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8264C,  Location: 5.8 N JCT SR 501 (Lat: 45.889358,  Lng: -122.732636),  Route carried "on" structure: Interstate 5,  Year Built: 1968,  Status: Open,  Structure Length: 32.80m (107.61ft),  Average Daily Traffic: 41,714 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 60,401 (year 2039),  Design Load: HS 20,  Features Intersected: LEWIS RIVER
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 31.978,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 9 degrees,  Navigation Control: Yes ( Vertical Clearance: 9.4m (30.8ft), Horizontal Clearance: 65.8m (215.9ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 98.8m (324.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.80m (107.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $14,822,000,  Roadway Improvement Cost: $2,964,000,  Total Project Cost: $29,644,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8952A,  Location: 1.6 N JCT SR 503 (Lat: 45.926808,  Lng: -122.756417),  Route carried "on" structure: Interstate 5,  Year Built: 1972,  Status: Open,  Structure Length: 20.57m (67.49ft),  Average Daily Traffic: 33,399 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 44,621 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: LOG DUMP RD & BN RY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.516,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 84.4m (276.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.57m (67.49ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $8,910,000,  Roadway Improvement Cost: $1,782,000,  Total Project Cost: $17,820,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13373A,  Location: 23.2 N CLARK CO (Lat: 45.935194,  Lng: -122.707278),  Route carried "on" structure: State highway 503,  Year Built: 1989,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 5,089 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,798 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: ROSS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.334,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $870,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82302,  Location: 0.14 E SR 503 (MP 54.31) (Lat: 45.905833,  Lng: -122.737222),  Route carried "on" structure: County highway 30300,  Year Built: 1966,  Status: Open,  Structure Length: 18.14m (59.51ft),  Average Daily Traffic: 6,628 (year 2015),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,500 (year 2035),  Design Load: HS 20,  Features Intersected: LEWIS RIVER,  Facility Carried by Structure: EAST CC ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 68.0m (223.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 18.14m (59.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: September 2017,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $3,570,000,  Roadway Improvement Cost: $714,000,  Total Project Cost: $7,140,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7064A,  Location: 26.5 N CLARK CO (Lat: 45.905556,  Lng: -122.742194),  Route carried "under" structure: State highway 503,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 19,327 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 503,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 87.500,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 7064B,  Location: 26.5 N CLARK CO (Lat: 45.905472,  Lng: -122.742389),  Route carried "under" structure: State highway 503,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 19,327 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 503,  Facility Carried by Structure: I-5
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 87.516,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 8952B,  Location: 1.6 N JCT SR 503 (Lat: 45.926139,  Lng: -122.756861),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,772 (year 2019),  Truck Traffic: 10%,  Features Intersected: W-S RAMP TO I-5,  Facility Carried by Structure: BN RY (NP)
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.129,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 8952C,  Location: 1.6 N JCT SR 503 (Lat: 45.927256,  Lng: -122.756953),  Route carried "under" structure: County highway 5,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 6,096 (year 2016),  Truck Traffic: 10%,  Features Intersected: DIKE ACCESS ROAD,  Facility Carried by Structure: BNRR
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.129,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)