Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Beechwood, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 141ft / 43.1mTotal length
  • $1,892,296,000Total costs
  • 71,878Total average daily traffic
  • 15,663Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Beechwood
  • No street view available for this location

New bridges in Beechwood, MS - historical statistics
  • New bridges - historical statistics
  • 91960-1969
  • 11970-1979
  • 21990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Beechwood, MS
Average Bridge Truck Traffic in Beechwood, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 50.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 60.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 40.0%Good
  • 50.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Excellent
  • 25.0%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 11000200750095,  Location: 2.0 MI E Mt Albin Rd (Lat: 32.353275,  Lng: -90.766911),  Route carried "on" structure: Interstate 20,  Year Built: 1960,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 35,000 (year 2040),  Design Load: HS 20,  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.548,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 31000270751265,  Location: 1.4 MI S US 80 (Lat: 32.326503,  Lng: -90.817153),  Route carried "on" structure: State highway 27,  Year Built: 1962,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,900 (year 2040),  Design Load: HS 20,  Features Intersected: KCS RR / STENSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.647,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $91,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $337,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000270751269,  Location: 1.0 MI S US 80 (Lat: 32.331342,  Lng: -90.820469),  Route carried "on" structure: State highway 27,  Year Built: 1962,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,900 (year 2040),  Design Load: HS 20,  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.276,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $68,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $311,000,000
Find on map >>   Show street view

Structure Number: 41000200750072A,  Location: 1.7 MI E US 61 (Lat: 32.352075,  Lng: -90.800650),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 740 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 740 (year 2040),  Design Load: HS 15,  Features Intersected: I 20,  Facility Carried by Structure: MT ALBAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.311,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $316,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $620,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 41000200750072B,  Location: 1.7 MI E US 61 (Lat: 32.351369,  Lng: -90.799847),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 740 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 740 (year 2040),  Design Load: HS 15,  Features Intersected: I 20,  Facility Carried by Structure: MT ALBAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.202,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $316,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $620,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA7500000000026,  Location: SEC 5 T15N R 4E B (Lat: 32.309028,  Lng: -90.831611),  Route carried "on" structure: County highway 153,  Year Built: 1967,  Status: Posted for load,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 993 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,291 (year 2042),  Design Load: H 15,  Features Intersected: HATCHERS BAYOU,  Facility Carried by Structure: LEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 5.31m (17.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $376,000,  Total Project Cost: $846,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA7500000000027,  Location: SEC 5 T15N R 4E B (Lat: 32.305139,  Lng: -90.828056),  Route carried "on" structure: County highway 153,  Year Built: 1967,  Status: Open,  Structure Length: 3.25m (10.66ft),  Average Daily Traffic: 1,523 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,285 (year 2043),  Design Load: H 15,  Features Intersected: LOCAL CREEK,  Facility Carried by Structure: LEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 17.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.12m (13.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $293,000,  Total Project Cost: $659,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA7500000000031,  Location: SEC 22 T15N R 4E (Lat: 32.261972,  Lng: -90.791833),  Route carried "on" structure: County highway 375,  Year Built: 2007,  Status: Open,  Structure Length: 2.91m (9.55ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 130 (year 2043),  Design Load: HS 20,  Features Intersected: LOCAL CREEK,  Facility Carried by Structure: TIMBERLANE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.82m (12.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $641,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA7500000000071,  Location: SEC 28 T16N R 4E B (Lat: 32.336944,  Lng: -90.788583),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 660 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 900 (year 2042),  Design Load: HS 20,  Features Intersected: KANSAS CITY SOUTHERN RR,  Facility Carried by Structure: WARRIOR TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA7500000000073,  Location: SEC 29 T16N R 4E B (Lat: 32.337472,  Lng: -90.793417),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 660 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 900 (year 2042),  Design Load: HS 20,  Features Intersected: KANSAS CITY SOUTHERN RR,  Facility Carried by Structure: MT ALBAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.379,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $407,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA7500000000075,  Location: SEC 34 T16N R 4E B (Lat: 32.321667,  Lng: -90.828333),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Posted for load,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 1,874 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,811 (year 2043),  Design Load: H 15,  Features Intersected: LOCAL CREEK,  Facility Carried by Structure: OLD HWY 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.88m (9.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $468,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA750000000A067,  Location: SEC 12 T16N R 4E B (Lat: 32.382419,  Lng: -90.759017),  Route carried "on" structure: County highway 15,  Year Built: 2020,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 537 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 806 (year 2043),  Design Load: HL 93,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: FREETOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.277,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $464,000,  Total Project Cost: $1,044,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA750000000A076,  Location: SEC 35 T16N R 4E B (Lat: 32.318611,  Lng: -90.823528),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,001 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,502 (year 2043),  Design Load: HL 93,  Features Intersected: LOCAL CREEK,  Facility Carried by Structure: OLD HWY 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.300,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $128,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $231,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 41000200750072A,  Location: 1.7 MI E US 61 (Lat: 32.352075,  Lng: -90.800650),  Route carried "under" structure: Interstate 20,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 15,500 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 20,  Facility Carried by Structure: MT ALBAN ROAD
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 2.309,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 41000200750072B,  Location: 1.7 MI E US 61 (Lat: 32.351550,  Lng: -90.800050),  Route carried "under" structure: Interstate 20,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 7,750 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 20,  Facility Carried by Structure: MT ALBAN ROAD
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 14.417,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.4m (80.1ft)

Discuss Beechwood, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.