Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Brantley, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 184ft / 55.7mTotal length
  • $23,664,000Total costs
  • 33,172Total average daily traffic
  • 4,413Total average daily truck traffic
  • 45,016Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brantley
  • No street view available for this location

New bridges in Brantley, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 11940-1949
  • 31950-1959
  • 21960-1969
  • 21970-1979
  • 31980-1989
  • 61990-1999
Reconstructed bridges in Brantley, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Brantley, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 60.0%Good
  • 40.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 20.0%Good
  • 60.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.0%Very good
  • 30.0%Good
  • 25.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 46.7%Good
  • 53.3%Satisfactory
Find on map >>   Show street view

Structure Number: 1683,  Location: 0.5 MI.S. SR 106 (Lat: 31.557667,  Lng: -86.301017),  Route carried "on" structure: US 29,  Year Built: 1923,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,980 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,698 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.339,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1747,  Location: 0.7 MI.N. SR 106 (Lat: 31.569967,  Lng: -86.289017),  Route carried "on" structure: US 29,  Year Built: 1938,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 1,980 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,698 (year 2033),  Design Load: H 15,  Features Intersected: BUSHY CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.150,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $762,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $838,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2131,  Location: BURNOUT RD. (Lat: 31.541728,  Lng: -86.267622),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 4 (year 2011),  Average Future Daily Traffic: 7 (year 2033),  Features Intersected: MORGAN BRANCH,  Facility Carried by Structure: BURNOUT RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 7.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 5.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $155,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5256,  Location: S. GLENWOOD RD. (Lat: 31.591586,  Lng: -86.239042),  Route carried "on" structure: County highway 57,  Year Built: 1955,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 700 (year 1993),  Truck Traffic: 12%,  Average Future Daily Traffic: 770 (year 2033),  Design Load: H 10,  Features Intersected: SPINCER BRANCH TRIBUTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $266,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5257,  Location: S. GLENWOOD RD. (Lat: 31.595186,  Lng: -86.220706),  Route carried "on" structure: County highway 57,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 640 (year 1993),  Truck Traffic: 12%,  Average Future Daily Traffic: 704 (year 2033),  Design Load: H 10,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8336,  Location: MT. IDA RD. (Lat: 31.620675,  Lng: -86.282508),  Route carried "on" structure: County highway 41,  Year Built: 1964,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 118 (year 2010),  Truck Traffic: 9%,  Average Future Daily Traffic: 350 (year 2034),  Design Load: H 10,  Features Intersected: SHINGLEPILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $518,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8337,  Location: MT. IDA RD. (Lat: 31.620339,  Lng: -86.270606),  Route carried "on" structure: County highway 41,  Year Built: 1964,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 320 (year 1993),  Truck Traffic: 3%,  Average Future Daily Traffic: 350 (year 2034),  Design Load: H 10,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 41.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $615,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11193,  Location: .5 MI.N.JCT.SR 189 (Lat: 31.572883,  Lng: -86.252283),  Route carried "on" structure: US 331,  Year Built: 1974,  Status: Open,  Structure Length: 25.57m (83.89ft),  Average Daily Traffic: 6,100 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,479 (year 2033),  Design Load: HS 20,  Features Intersected: CONECUH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 70.468,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 17,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.57m (83.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $8,241,000,  Roadway Improvement Cost: $824,000,  Total Project Cost: $9,065,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11728,  Location: 2 MI. N. OF BRANTLEY (Lat: 31.624917,  Lng: -86.265083),  Route carried "on" structure: US 331,  Year Built: 1938,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 6,190 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 8,604 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 76.542,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,245,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,370,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11942,  Location: CLUB POND RD. (Lat: 31.563597,  Lng: -86.237869),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 100 (year 1993),  Average Future Daily Traffic: 110 (year 2034),  Features Intersected: MOODY MILL CREEK,  Facility Carried by Structure: CLUB POND RD.
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $486,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12332,  Location: CLUB POND RD. (Lat: 31.570717,  Lng: -86.211983),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 50 (year 1993),  Average Future Daily Traffic: 55 (year 2034),  Design Load: H 15,  Features Intersected: BRYAN MILL CREEK,  Facility Carried by Structure: CLUB POND RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $652,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $717,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13788,  Location: S. GLENWOOD RD. (Lat: 31.589933,  Lng: -86.247825),  Route carried "on" structure: County highway 57,  Year Built: 1986,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 840 (year 1993),  Truck Traffic: 12%,  Average Future Daily Traffic: 924 (year 2033),  Design Load: H 10,  Features Intersected: SPINCER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $344,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $378,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14475,  Location: TURNER HILL RD. (Lat: 31.576631,  Lng: -86.299306),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 60 (year 1993),  Average Future Daily Traffic: 66 (year 2034),  Design Load: HS 20,  Features Intersected: BRUSHY CREEK,  Facility Carried by Structure: TURNER HILL RD.
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $355,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15243,  Location: 1.0 MI. S. U.S. 331 (Lat: 31.557567,  Lng: -86.234383),  Route carried "on" structure: State highway 189,  Year Built: 1990,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 910 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,211 (year 2033),  Design Load: HS 20,  Features Intersected: MOODY'S MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.784,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $460,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $506,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15511,  Location: MITCHELL RD. (Lat: 31.608903,  Lng: -86.306561),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 30 (year 1993),  Average Future Daily Traffic: 35 (year 2034),  Design Load: HS 20,  Features Intersected: BUSHY CREEK TRIBUTARY,  Facility Carried by Structure: MITCHELL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $297,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1649,  Location: 1.9 MI.N. SR.106 (Lat: 31.580400,  Lng: -86.274983),  Route carried "on" structure: US 29,  Year Built: 1996,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,980 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,698 (year 2033),  Design Load: HS 20,  Features Intersected: DRY CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.972,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $728,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $801,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16491,  Location: S CITY LIMITS BRANTLEY (Lat: 31.580983,  Lng: -86.271917),  Route carried "on" structure: US 29,  Year Built: 1996,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 2,560 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,489 (year 2033),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 115.274,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,454,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,699,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 166,  Location: 0.5 MI N JCT SR 106 (Lat: 31.567150,  Lng: -86.291817),  Route carried "on" structure: State highway 15,  Year Built: 1998,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,980 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,698 (year 2033),  Design Load: HS 20,  Features Intersected: BUSHY CREEK,  Facility Carried by Structure: US 29 MP 70.029
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 112.701,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $959,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,055,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17584,  Location: 2.4 MI.N. OF BRANTLEY (Lat: 31.630317,  Lng: -86.265200),  Route carried "on" structure: US 331,  Year Built: 1999,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 6,190 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 8,604 (year 2033),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.218,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,306,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $2,537,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19966,  Location: S. GLENWOOD RD (Lat: 31.604842,  Lng: -86.205803),  Route carried "on" structure: County highway 57,  Year Built: 1955,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 440 (year 1993),  Truck Traffic: 12%,  Average Future Daily Traffic: 466 (year 2033),  Design Load: HS 20,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $332,000 ( Estimate for 2022)
Discuss Brantley, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.