Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Brooksville, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 157ft / 47.8mTotal length
  • $3,515,000Total costs
  • 24,220Total average daily traffic
  • 3,682Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brooksville
  • No street view available for this location

New bridges in Brooksville, MS - historical statistics
  • New bridges - historical statistics
  • 11970-1979
  • 31980-1989
  • 51990-1999
  • 12000-2009
  • 52010-2019
  • 12020-2022
Average Bridge Daily Traffic in Brooksville, MS
Average Bridge Truck Traffic in Brooksville, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 30.0%Very good
  • 50.0%Good
  • 10.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 30.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Excellent
  • 40.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Excellent
  • 23.1%Very good
  • 30.8%Good
  • 23.1%Satisfactory
  • 15.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Very good
  • 25.0%Good
Find on map >>   Show street view

Structure Number: 21000450441454A,  Location: 0.4 MI N NOXUBEE CL (Lat: 33.293956,  Lng: -88.554819),  Route carried "on" structure: US 45,  Year Built: 2013,  Status: Open,  Structure Length: 4.32m (14.17ft),  Average Daily Traffic: 2,650 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,000 (year 2040),  Design Load: HS 20,  Features Intersected: JAMES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.586,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450441454B,  Location: 0.4 MI N NOXUBEE CL (Lat: 33.293617,  Lng: -88.554497),  Route carried "on" structure: US 45,  Year Built: 2014,  Status: Open,  Structure Length: 4.32m (14.17ft),  Average Daily Traffic: 2,650 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,000 (year 2040),  Design Load: HS 20,  Features Intersected: JAMES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450521418,  Location: US 45 OVER US 45A (Lat: 33.240758,  Lng: -88.572661),  Route carried "on" structure: US 45,  Year Built: 1999,  Status: Open,  Structure Length: 18.07m (59.28ft),  Average Daily Traffic: 5,200 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 5,500 (year 2040),  Design Load: HS 20,  Features Intersected: US 45A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.390,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 43.5m (142.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Inventory Rating: 70.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 27000450441455,  Location: 0.4 MI N NOXUBEE CL (Lat: 33.294372,  Lng: -88.554847),  Route carried "on" structure: ServiceOther road ,  Year Built: 2013,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 5,300 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 6,000 (year 2040),  Design Load: HS 20,  Features Intersected: DITCH,  Facility Carried by Structure: US 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.541,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 31003880520026,  Location: 2.6 MI E US 45 (Lat: 33.240061,  Lng: -88.537122),  Route carried "on" structure: State highway 388,  Year Built: 1978,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,600 (year 2020),  Truck Traffic: 23%,  Average Future Daily Traffic: 1,600 (year 2040),  Design Load: HS 20,  Features Intersected: HORSE HUNTERS TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.827,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: SA5200000000126,  Location: SEC 18 T16N R17E B (Lat: 33.234444,  Lng: -88.592944),  Route carried "on" structure: County highway 659,  Year Built: 1990,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 630 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 15,  Features Intersected: DITCH,  Facility Carried by Structure: LYNN CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.997,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $115,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $265,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5200000000127,  Location: SEC 18 T16N R17E B (Lat: 33.234453,  Lng: -88.591608),  Route carried "on" structure: County highway 659,  Year Built: 1990,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 630 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 15,  Features Intersected: JOES CREEK,  Facility Carried by Structure: LYNN CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $300,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5200000000128,  Location: SEC 18 T16N R17E (Lat: 33.239444,  Lng: -88.595611),  Route carried "on" structure: County highway 270,  Year Built: 2002,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 55 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: JOES CREEK,  Facility Carried by Structure: HINES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $225,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: SA5200000000129,  Location: SEC 23 T16N R17E (Lat: 33.227722,  Lng: -88.530667),  Route carried "on" structure: County highway 128,  Year Built: 1980,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 90 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 135 (year 2040),  Design Load: H 15,  Features Intersected: HORSE HUNTER CREEK,  Facility Carried by Structure: PILGRIM REST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.933,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $270,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA520000000013,  Location: SEC 26 T16N R17E B (Lat: 33.205686,  Lng: -88.534047),  Route carried "on" structure: County highway 310,  Year Built: 1984,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 60 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 90 (year 2040),  Design Load: H 15,  Features Intersected: HORSE HUNTER CREEK,  Facility Carried by Structure: BALDWYN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.170,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $500,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5200000000131,  Location: SEC 27 T16N R17E B (Lat: 33.205611,  Lng: -88.544786),  Route carried "on" structure: County highway 310,  Year Built: 1984,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 60 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 90 (year 2020),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: BALDYWN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.205,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.67m (8.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $325,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA520000000A115,  Location: SEC 14 T16N R16E B (Lat: 33.234311,  Lng: -88.626383),  Route carried "on" structure: County highway 659,  Year Built: 2016,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 640 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 960 (year 2040),  Design Load: HL 93,  Features Intersected: WET WATER CREEK,  Facility Carried by Structure: LYNN CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 199.560,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 5.0m (16.4ft),  Right: 5.0m (16.4ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $790,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA520000000A124,  Location: SEC 36 T16N R16E (Lat: 33.204442,  Lng: -88.624056),  Route carried "on" structure: County highway 22,  Year Built: 2019,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 55 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 90 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: WEST WATER CREEK,  Facility Carried by Structure: HARRISON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $390,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA520000000A16,  Location: SEC 33 T16N R17E (Lat: 33.190819,  Lng: -88.560378),  Route carried "on" structure: County highway 310,  Year Built: 2021,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2041),  Design Load: HL 93,  Features Intersected: BRANCH OF HORSE CREEK,  Facility Carried by Structure: HOPEWELL ROAD
Minimum Vertical Clearance: 9.99m (32.78ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $450,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 21000450521418,  Location: US 45 OVER US 45A (Lat: 33.239981,  Lng: -88.573119),  Route carried "under" structure: US 45,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: US 45A
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 5.979,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 43.6m (143.0ft)

Find on map >>   Show street view

Structure Number: 21000450521418,  Location: US 45 OVER US 45A (Lat: 33.240311,  Lng: -88.572961),  Route carried "under" structure: US 45,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2017),  Truck Traffic: 8%,  Features Intersected: US 45A
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.433,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 43.6m (143.0ft)

Discuss Brooksville, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.