Bridge Statistics for Broxton, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 112ft / 33.8mTotal length
  • $6,502,000Total costs
  • 11,610Total average daily traffic
  • 662Total average daily truck traffic
  • 17,415Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Broxton
  • No street view available for this location

New bridges in Broxton, GA - historical statistics
  • New bridges - historical statistics
  • 71950-1959
  • 41960-1969
  • 21970-1979
  • 11980-1989
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Broxton, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Truck Traffic in Broxton, GA
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 85.7%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.6%Very good
  • 64.7%Good
  • 17.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 69005,  Location: APP 2.5 MI W OF BROXTON (Lat: 31.648158,  Lng: -82.936547),  Route carried "on" structure: County highway 1689,  Year Built: 1956,  Year Reconstructed: 1957,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 550 (year 2012),  Truck Traffic: 15%,  Average Future Daily Traffic: 825 (year 2032),  Design Load: H 15,  Features Intersected: ROSES CREEK,  Facility Carried by Structure: FITZGERALD HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 690051,  Location: APP 2.5 MI W OF BROXTON (Lat: 31.648058,  Lng: -82.935878),  Route carried "on" structure: County highway 1689,  Year Built: 1956,  Year Reconstructed: 1957,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 550 (year 2012),  Truck Traffic: 15%,  Average Future Daily Traffic: 825 (year 2032),  Design Load: H 15,  Features Intersected: ROSES CREEK OVERFLOW,  Facility Carried by Structure: FITZGERALD HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 690055,  Location: APP .5 MI N OF BROXTON (Lat: 31.643169,  Lng: -82.879319),  Route carried "on" structure: State highway 268,  Year Built: 1958,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 790 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,185 (year 2032),  Design Load: H 15,  Features Intersected: 9 MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 690056,  Location: APP 2.5 MI NE OF BROXTON (Lat: 31.653419,  Lng: -82.858158),  Route carried "on" structure: State highway 268,  Year Built: 1959,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 790 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,185 (year 2032),  Design Load: H 15,  Features Intersected: BROXTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.48m (31.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $598,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 690059,  Location: APP 6 MI N OF DOUGLAS (Lat: 31.588369,  Lng: -82.927147),  Route carried "on" structure: State highway 206,  Year Built: 1962,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 2,130 (year 2012),  Truck Traffic: 17%,  Average Future Daily Traffic: 3,195 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: 17 MILE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $598,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 69007,  Location: APP 2 MI E OF BROXTON (Lat: 31.610358,  Lng: -82.855561),  Route carried "on" structure: County highway 1948,  Year Built: 1968,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 480 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 720 (year 2032),  Design Load: H 15,  Features Intersected: 9 MILE CREEK,  Facility Carried by Structure: BROXTON-WESTGREEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 690071,  Location: APP 2.5 MI E OF BROXTON (Lat: 31.608108,  Lng: -82.844719),  Route carried "on" structure: County highway 1948,  Year Built: 1968,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 480 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 720 (year 2032),  Design Load: HS 15,  Features Intersected: BROXTON CREEK,  Facility Carried by Structure: BROXTON-WESTGREEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $879,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 695006,  Location: APP 1.8 MI S OF BROXTON (Lat: 31.604689,  Lng: -82.900778),  Route carried "on" structure: County highway 143,  Year Built: 1980,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: ROSES CREEK,  Facility Carried by Structure: MOSLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.93m (29.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $481,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 695007,  Location: 3.2 MI SW OF BROXTON (Lat: 31.584339,  Lng: -82.907158),  Route carried "on" structure: County highway 143,  Year Built: 1960,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: 17 MILE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.54m (31.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $598,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 695009,  Location: 1.3 MI E OF BROXTON (Lat: 31.633658,  Lng: -82.868508),  Route carried "on" structure: County highway 167,  Year Built: 1954,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 14%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: 9 MILE CREEK,  Facility Carried by Structure: GEORGE DEEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 69501,  Location: 2.6 MI E OF BROXTON (Lat: 31.637069,  Lng: -82.845039),  Route carried "on" structure: County highway 167,  Year Built: 1954,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: BROXTON CREEK,  Facility Carried by Structure: GEORGE DEEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 43.04m (141.21ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $539,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 695011,  Location: 3.8 MI E OF BROXTON (Lat: 31.645847,  Lng: -82.825128),  Route carried "on" structure: County highway 167,  Year Built: 1954,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: SEVEN CREEK,  Facility Carried by Structure: GEORGE DEEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 695013,  Location: 2 MI N OF BROXTON (Lat: 31.654739,  Lng: -82.881569),  Route carried "on" structure: County highway 169,  Year Built: 1971,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: 9 MILE CREEK,  Facility Carried by Structure: OLD RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 695014,  Location: 3.4 MI N OF BROXTON (Lat: 31.672869,  Lng: -82.878739),  Route carried "on" structure: County highway 169,  Year Built: 1971,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BROXTON CREEK,  Facility Carried by Structure: OLD RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 695045,  Location: APP 3 MI W OF BROXTON (Lat: 31.608608,  Lng: -82.927758),  Route carried "on" structure: County highway 104,  Year Built: 1990,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HALLS CREEK,  Facility Carried by Structure: NOAH MANCIL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 69506,  Location: APP 2 MI OF BROXTON (Lat: 31.616689,  Lng: -82.937047),  Route carried "on" structure: State highway 268,  Year Built: 2006,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 960 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,440 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HALLS CREEK,  Facility Carried by Structure: AMBROSE-BROXTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 695061,  Location: APP 1.1 MI W OF BROXTON (Lat: 31.624639,  Lng: -82.911789),  Route carried "on" structure: State highway 268,  Year Built: 2006,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 960 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,440 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ROSES CREEK,  Facility Carried by Structure: AMBROSE-BROXTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place