Bridge Statistics for Crowder, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 246ft / 74.9mTotal length
  • $16,922,000Total costs
  • 66,030Total average daily traffic
  • 16,365Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Crowder
  • No street view available for this location

New bridges in Crowder, OK - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 121960-1969
  • 22000-2009
Average Bridge Daily Traffic in Crowder, OK
Average Bridge Truck Traffic in Crowder, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Good
  • 54.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 45.5%Good
  • 45.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 36.4%Good
  • 27.3%Satisfactory
  • 36.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Excellent
  • 33.3%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 5968,  Location: 1.5 N .9 W OF CROWDER (Lat: 35.144892,  Lng: -95.690244),  Route carried "on" structure: County highway E1290,  Year Built: 1938,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 15582,  Location: 2. E 1.2 S OF CROWDER (Lat: 35.106297,  Lng: -95.642969),  Route carried "on" structure: County highway 6110C,  Year Built: 1962,  Status: Open,  Structure Length: 16.46m (54.00ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: EUFAULA LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.494,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.46m (54.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $841,000,  Roadway Improvement Cost: $462,000,  Total Project Cost: $1,324,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16055,  Location: 4.07 N JCT SH 113 (Lat: 35.058056,  Lng: -95.706667),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 5.22m (17.13ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: COAL CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.548,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $698,000,  Roadway Improvement Cost: $1,152,000,  Total Project Cost: $1,954,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16056,  Location: 7.12 N JCT SH 113 (Lat: 35.101389,  Lng: -95.696389),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: ROCK CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.455,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 16059,  Location: 9.6 N JCT SH 113 (Lat: 35.131331,  Lng: -95.672533),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: CROWDER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.446,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $1,929,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1618,  Location: 7.5 MI N JCT SH 113 (Lat: 35.105569,  Lng: -95.694619),  Route carried "on" structure: US 69,  Year Built: 1964,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 12.89m (42.29ft),  Average Daily Traffic: 7,500 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 20,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.240,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.39m (43.93ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: October 2017,  Bridge Improvement Cost: $1,029,000,  Roadway Improvement Cost: $1,698,000,  Total Project Cost: $2,881,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16181,  Location: 7.5 MI N JCT SH 113 (Lat: 35.105647,  Lng: -95.694897),  Route carried "on" structure: US 69,  Year Built: 1964,  Status: Open,  Structure Length: 12.89m (42.29ft),  Average Daily Traffic: 7,900 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,640 (year 2040),  Design Load: HS 20,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.240,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.39m (43.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,029,000,  Roadway Improvement Cost: $1,698,000,  Total Project Cost: $2,881,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2417,  Location: 0.6 MI. N. OF CROWER (Lat: 35.131919,  Lng: -95.674047),  Route carried "on" structure: County highway 6108C,  Year Built: 1960,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 130 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 208 (year 2040),  Features Intersected: U.P. R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $371,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24171,  Location: 1.5S.&1.5W.OF CROWDER (Lat: 35.101950,  Lng: -95.698128),  Route carried "on" structure: County highway E1318,  Year Built: 1960,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 15,  Features Intersected: U.P. R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $371,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24173,  Location: 2.0W.&4.5S. OF CROWDER (Lat: 35.057964,  Lng: -95.708353),  Route carried "on" structure: County highway E1350,  Year Built: 1960,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: H 15,  Features Intersected: U.P. R.R. UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $371,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26151,  Location: .5 E & .1 N. CROWDER (Lat: 35.125081,  Lng: -95.665842),  Route carried "on" structure: County highway N4130,  Year Built: 2002,  Status: Open,  Structure Length: 2.30m (7.55ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.1m (72.5ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,592,000,  Roadway Improvement Cost: $625,000,  Total Project Cost: $2,461,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 27401,  Location: 2W OF CROWDER 1.5N US69 (Lat: 35.124036,  Lng: -95.701292),  Route carried "on" structure: County highway N4110,  Year Built: 2006,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 16055,  Location: 4.07 N JCT SH 113 (Lat: 35.058056,  Lng: -95.706667),  Route carried "under" structure: US 69,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 15,800 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: COAL CREEK RD.
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 6.548,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 16056,  Location: 7.12 N JCT SH 113 (Lat: 35.101389,  Lng: -95.696389),  Route carried "under" structure: US 69,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 15,800 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: ROCK CREEK RD
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 11.455,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 16059,  Location: 9.6 N JCT SH 113 (Lat: 35.131331,  Lng: -95.672533),  Route carried "under" structure: US 69,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 17,900 (year 2020),  Truck Traffic: 25%,  Features Intersected: U.S. 69 UNDER,  Facility Carried by Structure: CROWDER RD.
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 15.446,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.7m (44.9ft)