Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Equality, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 89ft / 27.4mTotal length
  • $863,000Total costs
  • 11,335Total average daily traffic
  • 1,175Total average daily truck traffic
  • 18,147Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Equality
  • No street view available for this location

New bridges in Equality, IL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 11950-1959
  • 21960-1969
  • 31970-1979
  • 21980-1989
  • 12010-2019
Average Bridge Daily Traffic in Equality, IL
Average Bridge Truck Traffic in Equality, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
  • 12.5%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 12.5%Poor
  • 12.5%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 62.5%Very good
  • 12.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 36.4%Very good
  • 36.4%Good
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 300012,  Location: 1 MI W OF ILL 1 (Lat: 37.740575,  Lng: -88.299158),  Route carried "on" structure: County highway ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 25 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 257 (year 2032),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: SBI 13 (UNMARKED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Channel: Poor,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $53,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 300015,  Location: 2.5 MI W ILL 1 (Lat: 37.743914,  Lng: -88.330867),  Route carried "on" structure: State highway 13,  Year Built: 1964,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 3,500 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 6,111 (year 2032),  Design Load: HS 20,  Features Intersected: NORTH FORK SALINE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 222.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Other Special Inspection Date: July 2020,  Bridge Improvement Cost: $540,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $810,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 302002,  Location: 0.7M W OF ILL 1 (Lat: 37.742700,  Lng: -88.298658),  Route carried "on" structure: State highway 13,  Year Built: 1968,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 3,500 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 6,111 (year 2032),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 225.286,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 303009,  Location: 0.4 MI S ILL 142 (Lat: 37.730214,  Lng: -88.348506),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 375 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 616 (year 2032),  Design Load: HS 15,  Features Intersected: SALINE RIVER,  Facility Carried by Structure: FAS 902
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.317,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 303056,  Location: 2.4 MI S EQUALITY (Lat: 37.711000,  Lng: -88.360275),  Route carried "on" structure: County highway ,  Year Built: 1900,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 26 (year 2032),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: TR 157
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.304,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 303066,  Location: 1 MI N OF EQUALITY (Lat: 37.754592,  Lng: -88.337117),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 25 (year 2018),  Truck Traffic: 52%,  Average Future Daily Traffic: 77 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB N FORK SALINE R,  Facility Carried by Structure: TR 48A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.485,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 30313,  Location: 0.8 MI W FAS 902 (Lat: 37.731186,  Lng: -88.363472),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 308 (year 2032),  Design Load: HS 20,  Features Intersected: COCKEREL BRANCH,  Facility Carried by Structure: MILES CARNAHAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 305002,  Location: 2 MI.SO.OF EQUALITY (Lat: 37.703261,  Lng: -88.355556),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 462 (year 2032),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: FAS 902-FH 36
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.502,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 832005,  Location: 1.4 MI. W OF RT. 142 (Lat: 37.746678,  Lng: -88.385450),  Route carried "on" structure: State highway 13,  Year Built: 1971,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,950 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,261 (year 2032),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.513,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 83315,  Location: 3 MILE SW EQUALITY (Lat: 37.698503,  Lng: -88.375711),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 275 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 408 (year 2032),  Design Load: HS 20,  Features Intersected: HORSHOE CREEK,  Facility Carried by Structure: FAS 902-CH 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.497,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 833167,  Location: 0.75 MI S CH 17 (Lat: 37.691825,  Lng: -88.376336),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 275 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 510 (year 2032),  Design Load: HS 20,  Features Intersected: HORSESHOE CREEK,  Facility Carried by Structure: FAS 902
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.286,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Equality, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.