Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Franklin, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 125ft / 38.2mTotal length
  • $12,818,000Total costs
  • 137,961Total average daily traffic
  • 31,923Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Franklin
  • No street view available for this location

New bridges in Franklin, AL - historical statistics
  • New bridges - historical statistics
  • 81960-1969
  • 22010-2019
Average Bridge Daily Traffic in Franklin, AL
Average Bridge Truck Traffic in Franklin, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 60.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 80.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 20.0%Good
  • 60.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 16.7%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 7729,  Location: 3.0MI.W.OFI-85 (Lat: 32.481633,  Lng: -85.798397),  Route carried "on" structure: State highway 49,  Year Built: 1962,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 1,450 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,776 (year 2033),  Design Load: H 15,  Features Intersected: UPHAPEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.013,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.16m (33.33ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $1,603,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,763,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 773,  Location: 3.3MI.NI-85 (Lat: 32.485114,  Lng: -85.797497),  Route carried "on" structure: State highway 49,  Year Built: 1962,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 1,450 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,776 (year 2033),  Design Load: H 15,  Features Intersected: UPHAPEE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.432,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $807,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $888,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7862,  Location: 1.08 MI. N AL.49 (Lat: 32.446667,  Lng: -85.773333),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 31,250 (year 2013),  Truck Traffic: 26%,  Average Future Daily Traffic: 41,186 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.726,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,342,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $2,576,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7863,  Location: 1.28 MI. N. AL.49 (Lat: 32.447819,  Lng: -85.763614),  Route carried "on" structure: Interstate 85,  Year Built: 1963,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 31,250 (year 2013),  Truck Traffic: 26%,  Average Future Daily Traffic: 41,186 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,667,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $1,834,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8004,  Location: I-85 AL.49 INT. (Lat: 32.444658,  Lng: -85.794736),  Route carried "on" structure: State highway 49,  Year Built: 1964,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 1,540 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,887 (year 2033),  Design Load: HS 20,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.138,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,140,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $2,354,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8205,  Location: 8.3 MI.N. SHORTER EXIT (Lat: 32.444269,  Lng: -85.817497),  Route carried "on" structure: County highway 9,  Year Built: 1964,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 1,002 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,637 (year 2028),  Design Load: HS 20,  Features Intersected: I-85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.941,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.55m (34.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,880,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,068,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20277,  Location: 1.3 MI. E. OF JCT ALA 49 (Lat: 32.454281,  Lng: -85.776622),  Route carried "on" structure: County highway 48,  Year Built: 2011,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 209 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 311 (year 2035),  Design Load: HS 20,  Features Intersected: COOPER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.7m (110.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $907,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $998,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20826,  Location: 2.5 mi. w. of I-85 (Lat: 32.477000,  Lng: -85.804889),  Route carried "on" structure: State highway 49,  Year Built: 2019,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,450 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,776 (year 2033),  Design Load: HS 20,  Features Intersected: Trib. of Uphapee Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8004,  Location: I-85 AL.49 INT. (Lat: 32.444658,  Lng: -85.794736),  Route carried "under" structure: Interstate 85,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 34,180 (year 2013),  Truck Traffic: 22%,  Features Intersected: I-85,  Facility Carried by Structure: AL 49
Minimum Vertical Clearance: 6.49m (21.29ft),  Kilometerpoint: 52.094,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 8205,  Location: 8.3 MI.N. SHORTER EXIT (Lat: 32.444269,  Lng: -85.817497),  Route carried "under" structure: Interstate 85,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 34,180 (year 2013),  Truck Traffic: 22%,  Features Intersected: I-85,  Facility Carried by Structure: CO RD 9
Minimum Vertical Clearance: 5.32m (17.45ft),  Kilometerpoint: 49.941,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.7m (67.9ft)

Discuss Franklin, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.