Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for French Camp, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 82ft / 24.6mTotal length
  • $572,000Total costs
  • 9,800Total average daily traffic
  • 1,092Total average daily truck traffic
  • 10,349Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for French Camp
  • No street view available for this location

New bridges in French Camp, MS - historical statistics
  • New bridges - historical statistics
  • 41940-1949
  • 31950-1959
  • 11960-1969
  • 31980-1989
  • 21990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 60.0%Good
  • 20.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 42.9%Good
  • 50.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.1%Very good
  • 55.6%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 31004070100177,  Location: 3.0 MI W NATCHEZ TRACE (Lat: 33.307003,  Lng: -89.450294),  Route carried "on" structure: State highway 407,  Year Built: 1982,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 570 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 570 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.215,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 31004110040077,  Location: 4.9 MI S SR 407 (Lat: 33.138600,  Lng: -89.352203),  Route carried "on" structure: State highway 411,  Year Built: 1986,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 30 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 30 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.501,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 31004130100055,  Location: 4.6 MI N SR 12 (Lat: 33.297389,  Lng: -89.363100),  Route carried "on" structure: State highway 413,  Year Built: 1952,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 970 (year 2040),  Design Load: HS 20,  Features Intersected: OLY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.867,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 31004130100075,  Location: 0.4 MI E NATCHEZ TRACE (Lat: 33.293111,  Lng: -89.396231),  Route carried "on" structure: State highway 413,  Year Built: 1952,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.085,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 31004130100078,  Location: 0.1 MI E NATCHEZ TRACE (Lat: 33.293239,  Lng: -89.402350),  Route carried "on" structure: State highway 413,  Year Built: 1948,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.654,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 31004130100082,  Location: 0.4 MI N SR 407 (Lat: 33.297169,  Lng: -89.403539),  Route carried "on" structure: State highway 413,  Year Built: 1985,  Status: Open,  Structure Length: 4.73m (15.52ft),  Average Daily Traffic: 670 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 670 (year 2040),  Design Load: HS 20,  Features Intersected: POPLAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.399,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 83.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 31004130100107,  Location: 2.9 MI N SR 407 (Lat: 33.328050,  Lng: -89.410881),  Route carried "on" structure: State highway 413,  Year Built: 1962,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 670 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 670 (year 2040),  Design Load: H 15,  Features Intersected: ELKINS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.355,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 5570108P,  Location: 14.2 MILES SOUTH OF MS RO (Lat: 33.296833,  Lng: -89.400722),  Route carried "on" structure: Federal lands road 1,  Year Built: 1949,  Status: Posted for load-capacity,  Structure Length: 3.21m (10.53ft),  Average Daily Traffic: 1,230 (year 2012),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,353 (year 2032),  Design Load: H 15,  Features Intersected: POPLAR CREEK BRANCH,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.410,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $45,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570109P,  Location: 14.5 MILES SOUTH OF MS RO (Lat: 33.294056,  Lng: -89.402833),  Route carried "on" structure: Federal lands road 1,  Year Built: 1946,  Status: Posted for load-capacity,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 1,230 (year 2012),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,353 (year 2032),  Design Load: H 15,  Features Intersected: POPLAR CREEK,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.090,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Bridge Improvement Cost: $87,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $131,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570355P,  Location: 14.5 MILES NORTH OF MS RO (Lat: 33.284500,  Lng: -89.406500),  Route carried "on" structure: Federal lands road 1,  Year Built: 1950,  Status: Posted for load-capacity,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,140 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,254 (year 2032),  Features Intersected: STREAM,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 290.000,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $17,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 5570356P,  Location: 15.1 MILES NORTH OF MS RO (Lat: 33.293139,  Lng: -89.403361),  Route carried "on" structure: Federal lands road 1,  Year Built: 1949,  Status: Posted for load-capacity,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 1,140 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,254 (year 2032),  Features Intersected: STREAM,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 290.960,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $29,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: SA0400000000161,  Location: SEC 3 T16N R 9E (Lat: 33.282017,  Lng: -89.354400),  Route carried "on" structure: County highway 255,  Year Built: 2003,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: BCH YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 2146
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA1000000000021,  Location: SEC 23 T17N R 8E (Lat: 33.322433,  Lng: -89.422019),  Route carried "on" structure: County highway 188,  Year Built: 1993,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2041),  Design Load: HS 20,  Features Intersected: ELKINS CREEK,  Facility Carried by Structure: JAMES WARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA100000000003,  Location: SEC 18 T17N R 9E (Lat: 33.329544,  Lng: -89.401017),  Route carried "on" structure: County highway 187,  Year Built: 1993,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 75 (year 2041),  Design Load: HS 20,  Features Intersected: ELKINS CREEK,  Facility Carried by Structure: WORLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Discuss French Camp, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.