  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 190ft / 58.1mTotal length
  • $2,917,454,000Total costs
  • 12,230Total average daily traffic
  • 1,953Total average daily truck traffic
  • 12,740Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Georgetown
  • No street view available for this location

New bridges in Georgetown, MS - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 41950-1959
  • 11960-1969
  • 11970-1979
  • 11990-1999
  • 22000-2009
  • 52010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 33.3%Good
  • 25.0%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 25.0%Good
  • 33.3%Satisfactory
  • 25.0%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 53.3%Good
  • 20.0%Satisfactory
  • 6.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 31000270150658,  Location: 6.8 MI N LAWRENCE CL (Lat: 31.843322,  Lng: -90.163378),  Route carried "on" structure: State highway 27,  Year Built: 1956,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,300 (year 2040),  Design Load: HS 15,  Features Intersected: COPIAH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.871,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.14m (43.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $999,999,000,  Roadway Improvement Cost: $123,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3100027015069,  Location: 1.1 MI N SR 28 (Lat: 31.888811,  Lng: -90.173325),  Route carried "on" structure: State highway 27,  Year Built: 1958,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: HS 15,  Features Intersected: UNNAMED STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.050,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 31000270150713,  Location: 3.4 MI N SR 28 (Lat: 31.916350,  Lng: -90.195864),  Route carried "on" structure: State highway 27,  Year Built: 1958,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: HS 15,  Features Intersected: UNNAMED STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.774,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 31000280150641,  Location: 1.3 MI E SR 27 (Lat: 31.874742,  Lng: -90.146289),  Route carried "on" structure: State highway 28,  Year Built: 1952,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: H 15,  Features Intersected: PEARL RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.704,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $307,000,000,  Roadway Improvement Cost: $31,000,000,  Total Project Cost: $915,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000280150646,  Location: 1.8 MI E SR 27 (Lat: 31.875239,  Lng: -90.139150),  Route carried "on" structure: State highway 28,  Year Built: 1940,  Status: Posted for load,  Structure Length: 16.91m (55.48ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: H 15,  Features Intersected: PEARL RIVER
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 64.382,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 76.2m (250.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 37.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.76m (32.02ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Critical Feature Inspection Date: Febuary 2021,  Bridge Improvement Cost: $903,000,000,  Roadway Improvement Cost: $90,000,000,  Total Project Cost: $999,999,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31004720150093,  Location: 4.2 MI W SR 27 (Lat: 31.829606,  Lng: -90.210706),  Route carried "on" structure: State highway 472,  Year Built: 1973,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 210 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 210 (year 2040),  Design Load: HS 20,  Features Intersected: STEEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.952,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: SA1500000000008,  Location: SEC 22 T 1N R 1E B (Lat: 31.905333,  Lng: -90.190111),  Route carried "on" structure: County highway 30,  Year Built: 2007,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 130 (year 2040),  Design Load: H 15,  Features Intersected: TRIB TO PEARL RIVER,  Facility Carried by Structure: BRUSHY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000011,  Location: SEC 28 T 1N R 1E B (Lat: 31.902083,  Lng: -90.204333),  Route carried "on" structure: County highway 31,  Year Built: 2005,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 50 (year 2015),  Average Future Daily Traffic: 80 (year 2040),  Design Load: H 15,  Features Intersected: TRIB TO PEARL RIVER,  Facility Carried by Structure: NEW HOPE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $228,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000183,  Location: SEC 3 T10N R10E (Lat: 31.863581,  Lng: -90.182492),  Route carried "on" structure: County highway 24,  Year Built: 1995,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 80 (year 2014),  Average Future Daily Traffic: 150 (year 2042),  Design Load: HS 20,  Features Intersected: COPIAH CREEK,  Facility Carried by Structure: COOPER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $520,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $780,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000204,  Location: SEC 21 T 1N R 1E (Lat: 31.915833,  Lng: -90.196694),  Route carried "on" structure: County highway 31,  Year Built: 2012,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 135 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB TO PEARL RIVER,  Facility Carried by Structure: BRUSHY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 92.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 55.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $186,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $279,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000212,  Location: SEC 34 T 1N R 1E (Lat: 31.886756,  Lng: -90.183869),  Route carried "on" structure: County highway 30,  Year Built: 2019,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 80 (year 2019),  Average Future Daily Traffic: 120 (year 2040),  Design Load: H 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: BRUSHY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000213,  Location: SEC 27 T 1N R 1E (Lat: 31.893678,  Lng: -90.185669),  Route carried "on" structure: County highway 30,  Year Built: 2019,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 80 (year 2019),  Average Future Daily Traffic: 120 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: BRUSHY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA150000000A184,  Location: SEC 15 T10N R10E B (Lat: 31.842222,  Lng: -90.183167),  Route carried "on" structure: County highway 24,  Year Built: 2017,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 60 (year 2017),  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB TO COPIAH CREEK,  Facility Carried by Structure: KNIGHT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA150000000A185,  Location: SEC 21 T10N R10E B (Lat: 31.827908,  Lng: -90.194319),  Route carried "on" structure: County highway 21,  Year Built: 2019,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 130 (year 2040),  Design Load: H 15,  Features Intersected: STEEL CREEK,  Facility Carried by Structure: STEEL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6400000000006,  Location: SEC 32 T 1N R 2E B (Lat: 31.882222,  Lng: -90.120472),  Route carried "on" structure: County highway 319,  Year Built: 1965,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 310 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 465 (year 2043),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK,  Facility Carried by Structure: OLD RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.887,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 6.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $314,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete