Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lena, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 210ft / 63.8mTotal length
  • $424,528,000Total costs
  • 12,040Total average daily traffic
  • 1,204Total average daily truck traffic
  • 13,800Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lena
  • No street view available for this location

New bridges in Lena, MS - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21950-1959
  • 41970-1979
  • 61980-1989
  • 41990-1999
  • 22000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 35.7%Very good
  • 50.0%Good
  • 14.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 71.4%Very good
  • 21.4%Good
  • 7.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 57.1%Very good
  • 28.6%Good
  • 7.1%Satisfactory
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 31.6%Very good
  • 36.8%Good
  • 5.3%Satisfactory
  • 26.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Very good
  • 60.0%Good
Find on map >>   Show street view

Structure Number: 31000130401527,  Location: 0.7 MI N SCOTT CL (Lat: 32.586236,  Lng: -89.602267),  Route carried "on" structure: State highway 13,  Year Built: 1952,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,100 (year 2040),  Design Load: H 15,  Features Intersected: SLAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.081,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 31000130401538,  Location: 1.8 MI N SCOTT CL (Lat: 32.599014,  Lng: -89.608808),  Route carried "on" structure: State highway 13,  Year Built: 1988,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: HS 20,  Features Intersected: BALUCTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.858,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3100013040154,  Location: 2.0 MI N SCOTT CL (Lat: 32.600183,  Lng: -89.612058),  Route carried "on" structure: State highway 13,  Year Built: 1988,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: HS 20,  Features Intersected: BALUCTA CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.190,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3100013040155,  Location: 3.0 MI N SCOTT CL (Lat: 32.609992,  Lng: -89.623561),  Route carried "on" structure: State highway 13,  Year Built: 1988,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MULLENS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.791,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 31000130401561,  Location: 4.1 MI N SCOTT CL (Lat: 32.626086,  Lng: -89.626839),  Route carried "on" structure: State highway 13,  Year Built: 1948,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: H 15,  Features Intersected: HOPE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.618,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 31000130621503,  Location: 8.0 MI N SR 483 (Lat: 32.563747,  Lng: -89.609014),  Route carried "on" structure: State highway 13,  Year Built: 1959,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 910 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 990 (year 2040),  Design Load: HS 15,  Features Intersected: BALUCTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.587,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 38.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $185,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $418,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31004870400045,  Location: 4.5 MI N SR 13 (Lat: 32.626322,  Lng: -89.549272),  Route carried "on" structure: State highway 487,  Year Built: 1989,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 280 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 280 (year 2040),  Design Load: HS 20,  Features Intersected: SWEETWATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.183,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 3100500040003,  Location: 3.0 MI E SR 13 (Lat: 32.593378,  Lng: -89.552389),  Route carried "on" structure: State highway 500,  Year Built: 1986,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 130 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 130 (year 2040),  Design Load: HS 20,  Features Intersected: SWEETWATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.661,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA4000000000004,  Location: SEC 8 T 9N R 7E (Lat: 32.649694,  Lng: -89.593306),  Route carried "on" structure: County highway 292,  Year Built: 1999,  Status: Open,  Structure Length: 6.09m (19.98ft),  Average Daily Traffic: 40 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2030),  Design Load: HS 20,  Features Intersected: BALUCTA CREEK,  Facility Carried by Structure: CEDAR GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $940,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4000000000005,  Location: SEC 3 T 9N R 7E B (Lat: 32.653667,  Lng: -89.573056),  Route carried "on" structure: County highway 1548,  Year Built: 1974,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 580 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 870 (year 2030),  Design Load: HS 15,  Features Intersected: TUSCOLAMETA CREEK,  Facility Carried by Structure: PLEASANT HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.598,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.97m (35.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,360,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4000000000007,  Location: SEC 17 T 9N R 7E B (Lat: 32.635389,  Lng: -89.600861),  Route carried "on" structure: County highway 1548,  Year Built: 1976,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 580 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 870 (year 2041),  Design Load: HS 15,  Features Intersected: BALUCTA CREEK,  Facility Carried by Structure: PLEASANT HILL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $660,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4000000000008,  Location: SEC 23 T 9N R 7E B (Lat: 32.610556,  Lng: -89.553806),  Route carried "on" structure: County highway 18,  Year Built: 1987,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 60 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 90 (year 2030),  Design Load: HS 20,  Features Intersected: SWEETWATER CREEK,  Facility Carried by Structure: STORM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $548,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4000000000009,  Location: SEC 31 T 9N R 7E (Lat: 32.579467,  Lng: -89.617733),  Route carried "on" structure: County highway 7,  Year Built: 1996,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 30 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 45 (year 2030),  Design Load: HS 20,  Features Intersected: BALUCTA CREEK,  Facility Carried by Structure: SESSUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.424,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $800,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA400000000001,  Location: SEC 31 T 9N R 7E (Lat: 32.579686,  Lng: -89.617425),  Route carried "on" structure: County highway 7,  Year Built: 1996,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 30 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 45 (year 2030),  Design Load: HS 20,  Features Intersected: RELIEF FOR BALUCTA CREEK,  Facility Carried by Structure: SESSUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.262,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $660,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6200000000103,  Location: SEC 2 T 8N R 6E B (Lat: 32.564500,  Lng: -89.651375),  Route carried "on" structure: County highway 434,  Year Built: 2007,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 510 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 765 (year 2040),  Design Load: HS 20,  Features Intersected: COLOMBO CREEK,  Facility Carried by Structure: HILLSBORO LUDLOWRD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $250,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: SA6200000000106,  Location: SEC 12 T 8N R 6E B (Lat: 32.556083,  Lng: -89.629250),  Route carried "on" structure: County highway 434,  Year Built: 1996,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 620 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 800 (year 2043),  Design Load: H 15,  Features Intersected: LOST CREEK,  Facility Carried by Structure: HILLSBORO LUDLOWRD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.012,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $330,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA6200000000111,  Location: SEC 11 T 8N R 7E B (Lat: 32.554139,  Lng: -89.541167),  Route carried "on" structure: County highway 157,  Year Built: 1979,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 640 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 960 (year 2040),  Design Load: HS 20,  Features Intersected: HAYES CREEK,  Facility Carried by Structure: HALL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.42m (4.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $250,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: SA6200000000112,  Location: SEC 11 T 8N R 7E B (Lat: 32.552444,  Lng: -89.554028),  Route carried "on" structure: County highway 260,  Year Built: 2002,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 80 (year 2017),  Average Future Daily Traffic: 120 (year 2040),  Design Load: H 15,  Features Intersected: HAYES CREEK,  Facility Carried by Structure: CASH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.276,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $300,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA6200000000113,  Location: SEC 17 T 8N R 7E B (Lat: 32.539886,  Lng: -89.605531),  Route carried "on" structure: County highway 434,  Year Built: 1978,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 450 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 675 (year 2040),  Design Load: HS 15,  Features Intersected: BIBALUCTA CREEK,  Facility Carried by Structure: HILLSBORO LUDLOWRD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.748,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.26m (13.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $430,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Lena, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.