Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Montrose, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 167ft / 51.2mTotal length
  • $787,000Total costs
  • 95,705Total average daily traffic
  • 47,964Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Montrose
  • No street view available for this location

New bridges in Montrose, IL - historical statistics
  • New bridges - historical statistics
  • 51900-1909
  • 81960-1969
  • 31970-1979
  • 71980-1989
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Montrose, IL
Average Bridge Truck Traffic in Montrose, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.0%Very good
  • 55.0%Good
  • 25.0%Satisfactory
  • 5.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.0%Very good
  • 55.0%Good
  • 20.0%Satisfactory
  • 5.0%Fair
  • 5.0%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Very good
  • 30.0%Good
  • 30.0%Satisfactory
  • 5.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 31.6%Very good
  • 26.3%Good
  • 36.8%Satisfactory
  • 5.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 180035,  Location: 1.4MI NE EFF CO LINE (Lat: 39.183781,  Lng: -88.345156),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 7.05m (23.13ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 183 (year 2032),  Design Load: HS 15,  Features Intersected: I-70,  Facility Carried by Structure: TR 68
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.8m (71.5ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 180057,  Location: .5 MI N EFFHAM LINE (Lat: 39.179878,  Lng: -88.377583),  Route carried "on" structure: Other road ,  Year Built: 1981,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 2,650 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,991 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: SPRING POINT CREEK,  Facility Carried by Structure: FAP 828
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.181,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $549,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 183128,  Location: 2.0 MI SW ROSYLN (Lat: 39.222031,  Lng: -88.411911),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 52 (year 2032),  Design Load: HS 20,  Features Intersected: SPRING POINT CREEK,  Facility Carried by Structure: TR 181
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 183136,  Location: 4.5 MI W JEWETT (Lat: 39.208647,  Lng: -88.335911),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 79 (year 2032),  Design Load: HS 20,  Features Intersected: SPRING POINT CREEK,  Facility Carried by Structure: TR 82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.301,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 183149,  Location: 2.8 MI NW MONTROSE (Lat: 39.193017,  Lng: -88.404942),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 150 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 131 (year 2032),  Design Load: HS 20,  Features Intersected: SPRING POINT CREEK,  Facility Carried by Structure: TR 203
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.697,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 183159,  Location: 3.1 MI W OF WOODBURY (Lat: 39.192964,  Lng: -88.361578),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 75 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 79 (year 2032),  Design Load: HS 20,  Features Intersected: SPRING POINT CREEK,  Facility Carried by Structure: TR 205
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 183187,  Location: 3.5 MI NE MONTROSE (Lat: 39.202142,  Lng: -88.347569),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 4.68m (15.35ft),  Average Daily Traffic: 75 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 52 (year 2032),  Design Load: HS 20,  Features Intersected: SPRING POINT CREEK,  Facility Carried by Structure: TR 66
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.186,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 183188,  Location: T9N R7E Sec 22 (Lat: 39.214753,  Lng: -88.414308),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 75 (year 2038),  Design Load: HS 20,  Features Intersected: Spring Point Creek,  Facility Carried by Structure: TR 189
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.876,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 250016,  Location: MONTROSE INT (Lat: 39.168950,  Lng: -88.379239),  Route carried "on" structure: Interstate 70,  Year Built: 1960,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 13,000 (year 2021),  Truck Traffic: 58%,  Average Future Daily Traffic: 10,067 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FAP-828
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.267,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 250017,  Location: MONTROSE INT (Lat: 39.168983,  Lng: -88.379017),  Route carried "on" structure: Interstate 70,  Year Built: 1960,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 13,000 (year 2021),  Truck Traffic: 58%,  Average Future Daily Traffic: 10,067 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FAP-828
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.283,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 250052,  Location: 6.5 MI E US-45 INT (Lat: 39.163425,  Lng: -88.416544),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 275 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 187 (year 2032),  Design Load: HS 15,  Features Intersected: FAI-70,  Facility Carried by Structure: CH-13
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 252019,  Location: S EDGE MONTROSE (Lat: 39.153925,  Lng: -88.379208),  Route carried "on" structure: Other road ,  Year Built: 1909,  Year Reconstructed: 1937,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,900 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 3,052 (year 2032),  Features Intersected: STREAM,  Facility Carried by Structure: FAP-828 (CC-MONT B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.915,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2021,  Other Special Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 253045,  Location: 3.5 MI NE DIETERICH (Lat: 39.115217,  Lng: -88.360506),  Route carried "on" structure: County highway ,  Year Built: 1909,  Status: Closed,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 25 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 10 (year 2032),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: TR-6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.947,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Poor,  Channel: Fair,  Operating Rating: 3.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 1.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $52,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $78,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 253145,  Location: 2 MI SW MONTROSE (Lat: 39.130661,  Lng: -88.397869),  Route carried "on" structure: County highway ,  Year Built: 1909,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 10 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 11 (year 2032),  Features Intersected: LITTLE SALT CREEK,  Facility Carried by Structure: TR-316
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 11.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 6.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $64,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 253203,  Location: 2 MI SW MONTROSE (Lat: 39.129847,  Lng: -88.416606),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 214 (year 2032),  Features Intersected: LITTLE SALT CREEK,  Facility Carried by Structure: CH-13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.715,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 25321,  Location: 2MI W MONTROSE (Lat: 39.150081,  Lng: -88.416550),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 275 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 187 (year 2032),  Design Load: HS 20,  Features Intersected: FIRST SALT CREEK,  Facility Carried by Structure: CH-13 PUMPING STA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 258604,  Location: MP 22.68 (Lat: 39.149036,  Lng: -88.418356),  Route carried "on" structure: US 40,  Year Built: 1909,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,150 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,213 (year 2032),  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 172.935,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 403049,  Location: 2 MI E EFFINGHAM CL (Lat: 39.143744,  Lng: -88.317014),  Route carried "on" structure: County highway ,  Year Built: 1909,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 51 (year 2032),  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: TR-44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $64,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $96,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 403164,  Location: 8.5 MI N WHEELER (Lat: 39.167094,  Lng: -88.320986),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 255 (year 2032),  Design Load: HS 20,  Features Intersected: WEBSTER BRANCH,  Facility Carried by Structure: TR-11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.573,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 403178,  Location: 1.5MI N ISLAND GROVE (Lat: 39.126636,  Lng: -88.335431),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 128 (year 2032),  Design Load: HS 20,  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: TR-32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.587,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 403199,  Location: 3 MI NE ISLAND GROVE (Lat: 39.144958,  Lng: -88.315719),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 153 (year 2032),  Design Load: HS 20,  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: TR-39
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 403217,  Location: 2.5 MI N ISLAND GROV (Lat: 39.131458,  Lng: -88.331225),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.88m (6.17ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 459 (year 2032),  Design Load: HS 20,  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: CH-6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.591,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2019,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 403227,  Location: 1.5 MI NW IS GROVE (Lat: 39.118386,  Lng: -88.354850),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 128 (year 2032),  Design Load: HS 20,  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: TR 75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 180035,  Location: 1.4MI NE EFF CO LINE (Lat: 39.183661,  Lng: -88.345092),  Route carried "under" structure: Interstate 70,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2021),  Truck Traffic: 58%,  Features Intersected: I-70,  Facility Carried by Structure: TR 68
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 179.743,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.8m (71.5ft)

Find on map >>   Show street view

Structure Number: 250016,  Location: MONTROSE INT (Lat: 39.168778,  Lng: -88.379239),  Route carried "under" structure: Other road ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 3,400 (year 2018),  Truck Traffic: 17%,  Features Intersected: FAP-828,  Facility Carried by Structure: FAI-70 EB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 250017,  Location: MONTROSE INT (Lat: 39.168950,  Lng: -88.379239),  Route carried "under" structure: Other road ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 3,400 (year 2018),  Truck Traffic: 17%,  Features Intersected: FAP-828,  Facility Carried by Structure: FAI-70 WB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 250052,  Location: 6.5 MI E US-45 INT (Lat: 39.163289,  Lng: -88.416539),  Route carried "under" structure: Interstate 70,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 25,800 (year 2021),  Truck Traffic: 58%,  Features Intersected: FAI-70,  Facility Carried by Structure: CH-13
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 173.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Discuss Montrose, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.