Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Noxapater, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 207ft / 63.4mTotal length
  • $2,324,406,000Total costs
  • 35,280Total average daily traffic
  • 4,782Total average daily truck traffic
  • 35,475Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Noxapater
  • No street view available for this location

New bridges in Noxapater, MS - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61960-1969
  • 11970-1979
  • 51980-1989
  • 21990-1999
  • 12020-2022
Average Bridge Daily Traffic in Noxapater, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Excellent
  • 8.3%Very good
  • 50.0%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Excellent
  • 41.7%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 33.3%Very good
  • 16.7%Good
  • 41.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Very good
  • 43.8%Good
  • 43.8%Satisfactory
  • 6.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 31000150801795,  Location: 0.6 MI N NESHOBA CL (Lat: 32.940308,  Lng: -89.096844),  Route carried "on" structure: State highway 15,  Year Built: 1937,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 4,300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,300 (year 2040),  Design Load: H 15,  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.003,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 31000150801802,  Location: 1.4 MI N NESHOBA CL (Lat: 32.949931,  Lng: -89.094650),  Route carried "on" structure: State highway 15,  Year Built: 1963,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 4,300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,300 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.107,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $117,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $287,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000150801811,  Location: 2.1 MI N NESHOBA CL (Lat: 32.958889,  Lng: -89.084681),  Route carried "on" structure: State highway 15,  Year Built: 1963,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 4,300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,300 (year 2040),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.484,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $117,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $287,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000150801813,  Location: 2.5 MI N NESHOBA CL (Lat: 32.961669,  Lng: -89.081022),  Route carried "on" structure: State highway 15,  Year Built: 1963,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 4,300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,300 (year 2040),  Design Load: HS 20,  Features Intersected: NOXAPATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.945,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $117,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $287,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000150801853,  Location: 1.0 MI N SR 490 (Lat: 33.014372,  Lng: -89.061247),  Route carried "on" structure: State highway 15,  Year Built: 1964,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,600 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.330,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $313,000,000,  Roadway Improvement Cost: $31,000,000,  Total Project Cost: $932,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000150801854,  Location: 1.2 MI N SR 490 (Lat: 33.016058,  Lng: -89.060336),  Route carried "on" structure: State highway 15,  Year Built: 1994,  Status: Open,  Structure Length: 7.69m (25.23ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,600 (year 2040),  Design Load: HS 20,  Features Intersected: TALLAHAGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.536,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000150801857,  Location: 1.4 MI N SR 490 (Lat: 33.020697,  Lng: -89.059178),  Route carried "on" structure: State highway 15,  Year Built: 1965,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,600 (year 2040),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.063,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $328,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $531,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003950800127,  Location: 2.4 MI W SR 15 (Lat: 32.988564,  Lng: -89.097664),  Route carried "on" structure: State highway 395,  Year Built: 1988,  Status: Open,  Structure Length: 3.71m (12.17ft),  Average Daily Traffic: 490 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 490 (year 2040),  Design Load: HS 20,  Features Intersected: NOXAPATER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.434,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003950800129,  Location: 2.2 MI W SR 15 (Lat: 32.989864,  Lng: -89.094547),  Route carried "on" structure: State highway 395,  Year Built: 1988,  Status: Open,  Structure Length: 6.14m (20.14ft),  Average Daily Traffic: 490 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 490 (year 2040),  Design Load: HS 20,  Features Intersected: NOXAPATER CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.759,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31004900800032,  Location: 3.2 MI E SR 15 (Lat: 32.984311,  Lng: -89.012919),  Route carried "on" structure: State highway 490,  Year Built: 1985,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 970 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.206,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: August 2019
Find on map >>   Show street view

Structure Number: 31004900800033,  Location: 3.3 MI E SR 15 (Lat: 32.984433,  Lng: -89.011006),  Route carried "on" structure: State highway 490,  Year Built: 1985,  Status: Open,  Structure Length: 6.17m (20.24ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 970 (year 2040),  Design Load: HS 20,  Features Intersected: TALLAHAGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.386,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 53.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31004900800039,  Location: 3.9 MI E SR 15 (Lat: 32.984706,  Lng: -89.001900),  Route carried "on" structure: State highway 490,  Year Built: 1985,  Status: Open,  Structure Length: 7.36m (24.15ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 970 (year 2040),  Design Load: HS 20,  Features Intersected: TALLAHAGA RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.239,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA8000000000014,  Location: SEC 6 T13N R12E (Lat: 33.014106,  Lng: -89.109108),  Route carried "on" structure: County highway 82,  Year Built: 1979,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 90 (year 2018),  Average Future Daily Traffic: 135 (year 2038),  Design Load: H 15,  Features Intersected: TRIB OF NOXAPATER CREEK,  Facility Carried by Structure: TUCK WILKES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.796,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.78m (12.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $279,000 ( Estimate for 2018),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA8000000000043,  Location: SEC 36 T14N R11E (Lat: 33.028389,  Lng: -89.114722),  Route carried "on" structure: County highway 81,  Year Built: 1998,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 60 (year 2018),  Average Future Daily Traffic: 90 (year 2038),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: JAMES YOUNG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.140,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: SA8000000000047,  Location: SEC 29 T14N R12E B (Lat: 33.036908,  Lng: -89.085778),  Route carried "on" structure: County highway 119,  Year Built: 1968,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 120 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 180 (year 2038),  Design Load: H 15,  Features Intersected: TRIB TALLAHAGA CANAL,  Facility Carried by Structure: YOUNG CROSSING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.807,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $127,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: SA800000000A046,  Location: SEC 29 T14N R12E B (Lat: 33.038031,  Lng: -89.083425),  Route carried "on" structure: County highway 119,  Year Built: 2021,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 120 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 180 (year 2040),  Design Load: HL 93,  Features Intersected: TALLAHAGA CREEK,  Facility Carried by Structure: YOUNG CROSSING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.033,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Discuss Noxapater, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.