Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Oakland, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 259ft / 79.1mTotal length
  • $4,443,668,000Total costs
  • 65,810Total average daily traffic
  • 17,554Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oakland
  • No street view available for this location

New bridges in Oakland, MS - historical statistics
  • New bridges - historical statistics
  • 41940-1949
  • 121960-1969
  • 11970-1979
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Oakland, MS
Average Bridge Truck Traffic in Oakland, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 64.3%Good
  • 21.4%Satisfactory
  • 7.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 50.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 7.7%Good
  • 53.8%Satisfactory
  • 30.8%Fair
Find on map >>   Show street view

Structure Number: 11000550812233A,  Location: 3.3 MI N SR 330 (Lat: 34.031839,  Lng: -89.880453),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 13.41m (44.00ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 34%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TILLATOBA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.184,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.41m (44.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $400,000,000,  Roadway Improvement Cost: $26,000,000,  Total Project Cost: $426,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550812233B,  Location: 3.3 MI N SR 330 (Lat: 34.030719,  Lng: -89.879861),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 13.41m (44.00ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 34%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TILLATOBA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.025,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.41m (44.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $400,000,000,  Roadway Improvement Cost: $26,000,000,  Total Project Cost: $426,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550812267A,  Location: I 55 OVER SR 32 (Lat: 34.077636,  Lng: -89.893658),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 34%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SR 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.960,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $147,000,000,  Roadway Improvement Cost: $26,000,000,  Total Project Cost: $173,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550812267B,  Location: I 55 OVER SR 32 (Lat: 34.077383,  Lng: -89.893300),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 8,000 (year 2020),  Truck Traffic: 34%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SR 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.349,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $147,000,000,  Roadway Improvement Cost: $26,000,000,  Total Project Cost: $173,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000510812286,  Location: 9.4 MI N GRENADA CL (Lat: 34.021736,  Lng: -89.909219),  Route carried "on" structure: US 51,  Year Built: 1940,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 1,300 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,300 (year 2040),  Design Load: H 15,  Features Intersected: TILLATOBA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.812,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $313,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $640,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000510812314,  Location: 0.2 MI S SR 32 (Lat: 34.062475,  Lng: -89.908475),  Route carried "on" structure: US 51,  Year Built: 1940,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,800 (year 2040),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.341,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $315,000,000,  Roadway Improvement Cost: $32,000,000,  Total Project Cost: $939,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000510812329,  Location: 1.2 MI N SR 32 (Lat: 34.083489,  Lng: -89.908122),  Route carried "on" structure: US 51,  Year Built: 1940,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.673,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $131,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $370,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000510812331,  Location: 1.5 MI N SR 32 (Lat: 34.086797,  Lng: -89.908014),  Route carried "on" structure: US 51,  Year Built: 1940,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.040,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 65.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $122,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $360,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000320810673,  Location: 0.4 MI W US 51 (Lat: 34.062658,  Lng: -89.915511),  Route carried "on" structure: State highway 32,  Year Built: 1965,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,300 (year 2040),  Design Load: HS 20,  Features Intersected: CNIC RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.63m (28.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $14,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $250,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000320810677,  Location: NEAR JCT SR 32 US 51 (Lat: 34.065058,  Lng: -89.909464),  Route carried "on" structure: State highway 32,  Year Built: 1966,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,300 (year 2040),  Design Load: HS 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.844,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 3,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 4100055081225,  Location: 1.7 MI S SR 32 (Lat: 34.054097,  Lng: -89.886969),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 540 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 540 (year 2040),  Design Load: H 20,  Features Intersected: I 55,  Facility Carried by Structure: COUNTY ROAD 211
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.126,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 64.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.98m (22.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $371,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $686,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA680000000011,  Location: SEC_24_T25N_R 3E B (Lat: 34.021444,  Lng: -89.935528),  Route carried "on" structure: County highway 179,  Year Built: 1990,  Status: Posted for load,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 100 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2035),  Design Load: H 10,  Features Intersected: TILLATOBA CREEK,  Facility Carried by Structure: WILLIAM ADAMS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $153,000 ( Estimate for 2018),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA6800000000134,  Location: SEC 36 T26N R 3E B (Lat: 34.083694,  Lng: -89.943833),  Route carried "on" structure: County highway 168,  Year Built: 1964,  Status: Posted for load,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 60 (year 2015),  Average Future Daily Traffic: 90 (year 2035),  Design Load: HS 20,  Features Intersected: TILLATOBA CREEK,  Facility Carried by Structure: OAKLAND-ENID ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $359,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA8100000000054,  Location: SEC 4 T25N R 4E (Lat: 34.058528,  Lng: -89.890972),  Route carried "on" structure: County highway 24,  Year Built: 1997,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 10 (year 2014),  Average Future Daily Traffic: 15 (year 2034),  Design Load: HS 20,  Features Intersected: KUYKENDALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: SA8100000000055,  Location: SEC 18 T25N R 4E B (Lat: 34.028444,  Lng: -89.912417),  Route carried "on" structure: County highway 20,  Year Built: 1992,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 200 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 300 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 82.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: SA8100000000056,  Location: SEC 20 T25N R 4E (Lat: 34.028417,  Lng: -89.905806),  Route carried "on" structure: County highway 20,  Year Built: 1970,  Status: Temporarily open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 100 (year 2014),  Average Future Daily Traffic: 150 (year 2034),  Design Load: H 15,  Features Intersected: RELIEF DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $156,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA8100000000057,  Location: SEC 20 T25N R 4E (Lat: 34.026000,  Lng: -89.903639),  Route carried "on" structure: County highway 20,  Year Built: 2007,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 100 (year 2014),  Average Future Daily Traffic: 150 (year 2034),  Design Load: HS 20,  Features Intersected: TILLATOBA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11000550812267A,  Location: I 55 OVER SR 32 (Lat: 34.077400,  Lng: -89.893589),  Route carried "under" structure: State highway 32,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 32,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 3.940,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 11000550812267B,  Location: I 55 OVER SR 32 (Lat: 34.077581,  Lng: -89.893361),  Route carried "under" structure: State highway 32,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 32,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 3.969,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 4100055081225,  Location: 1.7 MI S SR 32 (Lat: 34.054261,  Lng: -89.886481),  Route carried "under" structure: Interstate 55,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: COUNTY ROAD 211
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 17.706,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 4100055081225,  Location: 1.7 MI S SR 32 (Lat: 34.054181,  Lng: -89.886739),  Route carried "under" structure: Interstate 55,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: COUNTY ROAD 211
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 12.640,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Discuss Oakland, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.