  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 177ft / 53.5mTotal length
  • $869,000Total costs
  • 4,705Total average daily traffic
  • 598Total average daily truck traffic
  • 5,596Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Palmer
  • No street view available for this location

New bridges in Palmer, IL - historical statistics
  • New bridges - historical statistics
  • 31900-1909
  • 11910-1919
  • 41920-1929
  • 11940-1949
  • 11950-1959
  • 21980-1989
  • 21990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Truck Traffic in Palmer, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 41.2%Satisfactory
  • 17.6%Fair
  • 17.6%Poor
  • 5.9%Serious
  • 5.9%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.8%Very good
  • 5.9%Good
  • 29.4%Satisfactory
  • 11.8%Fair
  • 17.6%Poor
  • 11.8%Serious
  • 5.9%Critical
  • 5.9%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 35.3%Very good
  • 11.8%Good
  • 23.5%Satisfactory
  • 11.8%Fair
  • 5.9%Serious
  • 5.9%Critical
  • 5.9%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.8%Very good
  • 10.5%Good
  • 36.8%Satisfactory
  • 26.3%Fair
  • 5.3%Poor
  • 5.3%Failed
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Fair
  • 50.0%Serious
Find on map >>   Show street view

Structure Number: 110514,  Location: 1 mi SW Palmer (Lat: 39.443567,  Lng: -89.425250),  Route carried "on" structure: State highway 48,  Year Built: 2014,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 2,900 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,956 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: Bear Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.638,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 113055,  Location: 4.75 M N MORRISONVIL (Lat: 39.498714,  Lng: -89.460028),  Route carried "on" structure: County highway ,  Year Built: 1900,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 59 (year 2032),  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: TR 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 16.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $69,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 113069,  Location: 2 MI ENE MORRISONVLE (Lat: 39.429033,  Lng: -89.419483),  Route carried "on" structure: County highway ,  Year Built: 1921,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 50 (year 2032),  Features Intersected: MILLER BRANCH,  Facility Carried by Structure: TR 68
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.543,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Good,  Channel: Fair,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $12,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 113071,  Location: 1.75 MI N PALMER (Lat: 39.491472,  Lng: -89.415558),  Route carried "on" structure: County highway ,  Year Built: 1916,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 100 (year 2032),  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TR 70
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 2.623,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 18.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $254,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 113082,  Location: 3.5 E MORRISONVILLE (Lat: 39.415697,  Lng: -89.383197),  Route carried "on" structure: County highway ,  Year Built: 1921,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 125 (year 2032),  Features Intersected: MILLER BRANCH,  Facility Carried by Structure: TR 92
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.154,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $62,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 113094,  Location: 1.5 MI SE CLARKSDALE (Lat: 39.474950,  Lng: -89.353411),  Route carried "on" structure: County highway ,  Year Built: 1900,  Status: Closed,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 29 (year 2032),  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: TR 116
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Failed,  Deck Geometry: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $67,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $101,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 113175,  Location: 5 MI N MORRISONVILLE (Lat: 39.502456,  Lng: -89.457417),  Route carried "on" structure: County highway ,  Year Built: 1900,  Status: Closed,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 20 (year 2021),  Average Future Daily Traffic: 29 (year 2032),  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: TR 221
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.674,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Fair,  Superstructure: Critical,  Substructure: Fair,  Channel: Fair,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 113211,  Location: 0.75 MI W. PALMER (Lat: 39.451278,  Lng: -89.430469),  Route carried "on" structure: County highway ,  Year Built: 1922,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 59 (year 2032),  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TR 269
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Fair,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $347,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 113276,  Location: 3.5 N PALMER (Lat: 39.515775,  Lng: -89.403817),  Route carried "on" structure: County highway ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 28%,  Average Future Daily Traffic: 109 (year 2032),  Features Intersected: ACHENBACH BRANCH,  Facility Carried by Structure: TR 82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.738,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Critical,  Channel: Poor,  Operating Rating: 20.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 12.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $24,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 113299,  Location: 2.75 M N OF PALMER (Lat: 39.506625,  Lng: -89.403714),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 5.47m (17.95ft),  Average Daily Traffic: 250 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 301 (year 2032),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: FAS 639
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.958,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 113301,  Location: 3 N OF PALMER (Lat: 39.509928,  Lng: -89.397300),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 6.56m (21.52ft),  Average Daily Traffic: 75 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 100 (year 2032),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TR 213
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 113365,  Location: .25 MI W PALMER (Lat: 39.458608,  Lng: -89.421992),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 251 (year 2032),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TR 261
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.918,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Very good,  Channel: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 113375,  Location: 1.5 NE MORRISONVILLE (Lat: 39.436722,  Lng: -89.422392),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 35%,  Average Future Daily Traffic: 50 (year 2032),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TR 277
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.511,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 113397,  Location: 2.5 E MORRISONVILLE (Lat: 39.421864,  Lng: -89.399050),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 2.40m (7.87ft),  Average Daily Traffic: 400 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 601 (year 2032),  Design Load: HS 20,  Features Intersected: MILLER BRANCH,  Facility Carried by Structure: CH 10-FAS 732
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.474,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.0m (75.5ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 113399,  Location: 1.5MI N PALMER (Lat: 39.480475,  Lng: -89.432972),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 25 (year 2032),  Design Load: HS 20,  Features Intersected: PRAIRIE FORK,  Facility Carried by Structure: TR 235
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.594,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.8m (48.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1134,  Location: 1MI N PALMER (Lat: 39.480508,  Lng: -89.425306),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 25 (year 2032),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TR 235
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.237,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.1m (62.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 113401,  Location: 2 M S PALMER (Lat: 39.423600,  Lng: -89.402061),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 2.40m (7.87ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 301 (year 2032),  Design Load: HS 20,  Features Intersected: MILLER BRANCH,  Facility Carried by Structure: CH-5,FAS 639
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.758,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 115011,  Location: 0.12 MI N PALMER (Lat: 39.467564,  Lng: -89.407814),  Route carried "on" structure: County highway ,  Year Built: 1947,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 150 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 401 (year 2032),  Design Load: HS 15,  Features Intersected: SIMPSONS BRANCH,  Facility Carried by Structure: FAS 639
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.721,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 115025,  Location: 4MI E MORRISONVILLE (Lat: 39.407142,  Lng: -89.371186),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 25 (year 2032),  Features Intersected: MILLER BRANCH,  Facility Carried by Structure: TR 307
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.964,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.0m (6.6ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2019,  Other Special Inspection Date: January 2021