Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pine Apple, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 200ft / 60.8mTotal length
  • $18,752,000Total costs
  • 6,330Total average daily traffic
  • 975Total average daily truck traffic
  • 7,996Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pine Apple
  • No street view available for this location

New bridges in Pine Apple, AL - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 41960-1969
  • 51970-1979
  • 61980-1989
  • 12000-2009
Average Bridge Truck Traffic in Pine Apple, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 33.3%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
  • 13.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 13.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Very good
  • 33.3%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 6.7%Poor
  • 6.7%Critical
  • 6.7%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Very good
  • 30.0%Good
  • 10.0%Satisfactory
  • 45.0%Fair
  • 10.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Good
  • 20.0%Satisfactory
  • 20.0%Poor
Find on map >>   Show street view

Structure Number: 5142,  Location: 4.0 MILES E.ON RTE 7 (Lat: 31.917897,  Lng: -86.950278),  Route carried "on" structure: County highway 7,  Year Built: 1955,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 90 (year 2016),  Average Future Daily Traffic: 100 (year 2036),  Design Load: H 15,  Features Intersected: PINE BARRON CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $806,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $887,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5892,  Location: 1.05 MI.N.OLD TEXASLT.1MI (Lat: 31.802319,  Lng: -86.988989),  Route carried "on" structure: County highway 4,  Year Built: 1957,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 1993),  Average Future Daily Traffic: 100 (year 2033),  Features Intersected: TURKEY CREEK,  Facility Carried by Structure: COUNTY ROUTE 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 22.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $190,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 6599,  Location: 3.1 MILES E.ON CO RD 24 (Lat: 31.929847,  Lng: -87.019442),  Route carried "on" structure: County highway 24,  Year Built: 1959,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 143 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 153 (year 2036),  Design Load: H 15,  Features Intersected: BEAR CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.3m (17.4ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Underwater Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $979,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,077,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 66,  Location: 3.5 M. E.ON CO RD24 (Lat: 31.927800,  Lng: -87.014328),  Route carried "on" structure: County highway 24,  Year Built: 1959,  Status: Posted for load,  Structure Length: 3.10m (10.17ft),  Average Daily Traffic: 143 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 153 (year 2036),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.95m (12.96ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $685,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7068,  Location: 1.5 MILES E ON RTE 61 (Lat: 31.871050,  Lng: -86.965350),  Route carried "on" structure: County highway 61,  Year Built: 1960,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 105 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 125 (year 2036),  Design Load: H 15,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $688,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9059,  Location: 1.2 MILES E.ON CO RD 7 (Lat: 31.890458,  Lng: -86.972139),  Route carried "on" structure: County highway 7,  Year Built: 1966,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 90 (year 2016),  Average Future Daily Traffic: 100 (year 2036),  Design Load: H 15,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 36.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10268,  Location: 3MI WEST OF ALA 10 (Lat: 31.855500,  Lng: -87.042900),  Route carried "on" structure: County highway 2,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 250 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 270 (year 2036),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $393,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11508,  Location: 1.5 MILES W.ON ROAD 213 (Lat: 31.907111,  Lng: -86.983083),  Route carried "on" structure: County highway 213,  Year Built: 1975,  Status: Closed,  Structure Length: 3.16m (10.37ft),  Average Daily Traffic: 40 (year 1995),  Average Future Daily Traffic: 50 (year 2028),  Design Load: H 10,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 2.5m (8.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 13.3m (43.6ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Critical,  Channel: Good,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2008,  Other Special Inspection Date: April 2008,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $486,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 11595,  Location: 6.7 MILES E.ON RTE.2 (Lat: 31.857833,  Lng: -87.003778),  Route carried "on" structure: County highway 2,  Year Built: 1976,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 260 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 270 (year 2036),  Design Load: H 20,  Features Intersected: LITTLE TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $347,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11704,  Location: 2.6 Miles East CR7 (Lat: 31.879833,  Lng: -86.928361),  Route carried "on" structure: County highway 210,  Year Built: 1976,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 20 (year 2016),  Average Future Daily Traffic: 20 (year 2036),  Design Load: H 10,  Features Intersected: BREASTWORK CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.8m (12.5ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.5m (21.3ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Underwater Inspection Date: June 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $218,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 11705,  Location: 0.4 MI EAST OF CO RD 7 (Lat: 31.880419,  Lng: -86.927969),  Route carried "on" structure: County highway 210,  Year Built: 1976,  Year Reconstructed: 1992,  Status: Closed,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 20 (year 2016),  Average Future Daily Traffic: 20 (year 2036),  Design Load: HS 20,  Features Intersected: BREASTWORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 2.9m (9.5ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: October 2018,  Other Special Inspection Date: October 2018,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $300,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 12291,  Location: 1.9 MILES E.ON ROAD (Lat: 31.879972,  Lng: -86.939694),  Route carried "on" structure: County highway 209,  Year Built: 1965,  Year Reconstructed: 1980,  Status: Closed,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 20 (year 1995),  Average Future Daily Traffic: 20 (year 2028),  Design Load: H 15,  Features Intersected: PINE BARREN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete continuous,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Imminent failure,  Channel: Poor,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.37m (17.62ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2008,  Other Special Inspection Date: March 2008,  Bridge Improvement Cost: $884,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $972,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12642,  Location: 3.8 MI. E. OF OAK HILL (Lat: 31.892011,  Lng: -87.032919),  Route carried "on" structure: State highway 10,  Year Built: 1982,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 720 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 938 (year 2033),  Design Load: HS 20,  Features Intersected: STRAIGHT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 154.684,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 85.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,257,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,383,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12643,  Location: 2.2 MI. W. OF PINE APPLE (Lat: 31.885189,  Lng: -87.023125),  Route carried "on" structure: State highway 10,  Year Built: 1982,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 770 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,003 (year 2033),  Design Load: HS 20,  Features Intersected: BEAR CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 156.267,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,509,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $1,660,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12644,  Location: 2.1 MI. W. OF PINE APPLE (Lat: 31.884189,  Lng: -87.019953),  Route carried "on" structure: State highway 10,  Year Built: 1982,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 770 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,003 (year 2033),  Design Load: HS 20,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 156.536,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.20m (33.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,007,000,  Roadway Improvement Cost: $301,000,  Total Project Cost: $3,308,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12645,  Location: 1.7 MI. W OF PINE APPLE (Lat: 31.882689,  Lng: -87.015258),  Route carried "on" structure: State highway 10,  Year Built: 1982,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 770 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,003 (year 2033),  Design Load: HS 20,  Features Intersected: BEAR CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 157.247,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,509,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $1,660,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14521,  Location: 1 MI. W. OF AWIN (Lat: 31.844119,  Lng: -86.960614),  Route carried "on" structure: State highway 10,  Year Built: 1988,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 940 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,224 (year 2033),  Design Load: HS 20,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.523,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $972,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,069,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14522,  Location: .8 MI. W. OF AWIN (Lat: 31.842781,  Lng: -86.958369),  Route carried "on" structure: State highway 10,  Year Built: 1988,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 940 (year 2013),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,224 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.019,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $747,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16926,  Location: 3KM SW OF HWY 10 (Lat: 31.871433,  Lng: -87.051433),  Route carried "on" structure: County highway 16,  Year Built: 1968,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 99 (year 2016),  Average Future Daily Traffic: 120 (year 2036),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $352,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19622,  Location: 3.9 MILES E. ON RTE. 7 (Lat: 31.917417,  Lng: -86.951500),  Route carried "on" structure: County highway 7,  Year Built: 2005,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 90 (year 2016),  Average Future Daily Traffic: 100 (year 2036),  Design Load: HS 20,  Features Intersected: PINE BARREN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.47m (21.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,330,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,463,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Pine Apple, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.