Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pinedale, Wyoming (WY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 66ft / 20.3mTotal length
  • $166,000Total costs
  • 26,770Total average daily traffic
  • 2,540Total average daily truck traffic
  • 37,478Total future (year 2041) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pinedale
  • No street view available for this location

New bridges in Pinedale, WY - historical statistics
  • New bridges - historical statistics
  • 31960-1969
  • 21980-1989
  • 51990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Pinedale, WY
Average Bridge Truck Traffic in Pinedale, WY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 37.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 87.5%Good
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Good
  • 50.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 25.0%Good
  • 58.3%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: BRP,  Location: Pinedale (Lat: 42.866619,  Lng: -109.867889),  Route carried "on" structure: US 191,  Year Built: 1962,  Status: Open,  Structure Length: 2.51m (8.23ft),  Average Daily Traffic: 9,966 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,952 (year 2041),  Design Load: HS 20,  Features Intersected: Pine Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.817,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: ML1,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: EMV,  Location: 4.5 Mi. N.W. Of Pinedale (Lat: 42.895964,  Lng: -109.914689),  Route carried "on" structure: County highway 144,  Year Built: 1963,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 1,208 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,691 (year 2041),  Design Load: HS 20,  Features Intersected: New Fork River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.646,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $36,000
Find on map >>   Show street view

Structure Number: EMY,  Location: 4 Mi. N.W. Of Pinedale (Lat: 42.895961,  Lng: -109.906669),  Route carried "on" structure: County highway 144,  Year Built: 1963,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 1,208 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,691 (year 2041),  Design Load: HS 20,  Features Intersected: Willow Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.991,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $38,000
Find on map >>   Show street view

Structure Number: FHH,  Location: 0.5 Miles S. Of Pinedale (Lat: 42.860394,  Lng: -109.861161),  Route carried "on" structure: County highway 123,  Year Built: 1988,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 829 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,161 (year 2041),  Design Load: HS 20,  Features Intersected: Pine Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.569,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: FHI,  Location: 1 Mi. South Of Pinedale (Lat: 42.857375,  Lng: -109.861144),  Route carried "on" structure: County highway 123,  Year Built: 1988,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 829 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,161 (year 2041),  Design Load: HS 20,  Features Intersected: Pine Creek Overflow
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.905,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $5,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: JBD,  Location: Pinedale-Daniel Jct (Lat: 42.866719,  Lng: -109.921150),  Route carried "on" structure: US 191,  Year Built: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,897 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,056 (year 2041),  Design Load: HS 20,  Features Intersected: Duck Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 165.172,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML1,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $21,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: JBE,  Location: Pinedale-Daniel Jct (Lat: 42.866647,  Lng: -109.893272),  Route carried "on" structure: US 191,  Year Built: 1993,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 2,897 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,056 (year 2041),  Design Load: HS 20,  Features Intersected: New Fork River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.891,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML1,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: JBF,  Location: Pinedale-Daniel Jct (Lat: 42.866622,  Lng: -109.885303),  Route carried "on" structure: US 191,  Year Built: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,146 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 7,204 (year 2041),  Design Load: HS 20,  Features Intersected: Barber Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.240,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML1,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: KIK,  Location: 2 Iles South Of Pinedale (Lat: 42.837547,  Lng: -109.863742),  Route carried "on" structure: County highway 123,  Year Built: 1995,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 829 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,161 (year 2041),  Design Load: HS 20,  Features Intersected: New Fork River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.262,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $14,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: LRT,  Location: 1 Mile W Of Pinedale (Lat: 42.865147,  Lng: -109.908694),  Route carried "on" structure: County highway 190,  Year Built: 2003,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 48 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 67 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: Duck Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.653,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $10,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: LWI,  Location: 1 Mile West Of Pinedale (Lat: 42.862764,  Lng: -109.898308),  Route carried "on" structure: County highway 204,  Year Built: 1990,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 48 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 67 (year 2041),  Features Intersected: Duck Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.439,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $39,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: MSA,  Location: 1.4 Mi Ne Of Pinedale (Lat: 42.882619,  Lng: -109.842208),  Route carried "on" structure: County highway 154,  Year Built: 2013,  Status: Posted for load,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 865 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,211 (year 2041),  Design Load: HS 20,  Features Intersected: Highland Canal
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.403,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021
Discuss Pinedale, Wyoming (WY) on our hugely popular Wyoming forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.